Trenching with different layers of material for sewer pipe. John Deere 450

แชร์
ฝัง
  • เผยแพร่เมื่อ 25 ส.ค. 2024
  • I talk about how we decide how a trench is dug. Do I finally get to eat my burrito?

ความคิดเห็น • 91

  • @barryguerrero6480
    @barryguerrero6480 หลายเดือนก่อน +1

    Love those V buckets. It's a great way to keep the pipe layers safe.

  • @_MadMax.
    @_MadMax. 3 ปีที่แล้ว +6

    Great channel ! Really enjoy the narration, precision digging and professional workmanship. Getting to be my favorite Track hoe channel !

  • @ArizonaCowboys
    @ArizonaCowboys 3 ปีที่แล้ว +4

    You are quickly becoming my favorite channel. keep it up

  • @jamescampbell7780
    @jamescampbell7780 3 ปีที่แล้ว +4

    Impressive, capable operator. Great presentation!

  • @marcmaillet4858
    @marcmaillet4858 3 ปีที่แล้ว +2

    Another great video to watch on a Saturday night. Love it love it love it. Great work buddy 👍👍

  • @johnclifton3910
    @johnclifton3910 3 ปีที่แล้ว +1

    Awesome job keep me coming and I'll keep watching them

  • @billthomas5325
    @billthomas5325 10 หลายเดือนก่อน +1

    wow, great video on procedure... not too much talking... excellent job bro...

  • @jayee13salazar
    @jayee13salazar 3 ปีที่แล้ว +2

    Bro I like all your videos I also run the trackhoe I’m from Charlotte NC lots of work on this side

  • @anthonypiligno7618
    @anthonypiligno7618 3 ปีที่แล้ว +2

    Good video bro...... JJ...

  • @tpep1693
    @tpep1693 3 ปีที่แล้ว +5

    All good, surprised that they even let you dig out in newsome land, haha.

  • @tpep1693
    @tpep1693 3 ปีที่แล้ว +3

    Jobsite humor, gotta love it.

  • @bobberdutchman7944
    @bobberdutchman7944 3 ปีที่แล้ว +1

    Love these videos man! You fix the quick cupler.. the bucket goes from left to right like crazy😅

    • @TheLeverMonkey
      @TheLeverMonkey  3 ปีที่แล้ว

      I can only ask to get it fixed.

    • @bobberdutchman7944
      @bobberdutchman7944 3 ปีที่แล้ว +1

      @@TheLeverMonkey i understand! Had the same thing on my old machine.. drove me crazy😅

    • @TheLeverMonkey
      @TheLeverMonkey  3 ปีที่แล้ว

      @@bobberdutchman7944 I worked for a small company years ago and all their equipment was like this. So I hardly notice it.

    • @bobberdutchman7944
      @bobberdutchman7944 3 ปีที่แล้ว

      @@TheLeverMonkey 👍😁 but love you're channel dude! Keep up the good job!

  • @jordanbeach2156
    @jordanbeach2156 3 ปีที่แล้ว +2

    Im glad my street wont look like that when my city does water main replacement this fall or next spring they are horizontal directional boring 8 inch water main but the city did mark out sewers im in canada

  • @sebastiankott2799
    @sebastiankott2799 3 ปีที่แล้ว +3

    Finally got that burrito. Better be delicious for 8$

  • @sandy1653
    @sandy1653 3 ปีที่แล้ว +4

    The boys in the trench would need SCUBA gear if you tried that down here where I live. Water table is only 7 feet deep here. And out where my parents live I think its only 3-4 feet deep.

  • @raymundo7687
    @raymundo7687 3 ปีที่แล้ว +2

    I dont know how you continued on with that trench with the drop off right behind you, I would have painted myself in a corner and been screwed. I was hoping that part was in the video lol great work brother.

    • @TheLeverMonkey
      @TheLeverMonkey  3 ปีที่แล้ว +1

      That was before I started the channel. I only had 1 battery and a 32gb card. the ditch had a 45* turn and was only 5 feet deep at the bottom of the slope.

    • @raymundo7687
      @raymundo7687 3 ปีที่แล้ว

      @@TheLeverMonkey slopes look way different on camera, thanks for the reply.

  • @mikemuniak4711
    @mikemuniak4711 3 ปีที่แล้ว +3

    Is every thing down you guys deep as hell holy shit lol,bet that's a fun job tho ,

  • @thomasyerbey337
    @thomasyerbey337 3 ปีที่แล้ว

    Great video I really enjoyed this video 🇺🇲

  • @tucobenedicto109
    @tucobenedicto109 3 ปีที่แล้ว +1

    The fact that you said watch for a color change in the soil is important. We just dug 400' of soil to put 4 4" sch40 pipie for cable. What is not normal is seeing a black coal slag coal layer left from steam engines then sand above that then 3/4" stone on top of that. We did see some wood on top of we think concrete electrical duct (750 DC). We didn't dig to find out we were low enough. Thanks for your info. We put tape above most times when we direct bury cables. But now we use pvc for safety and pulling.

    • @TheLeverMonkey
      @TheLeverMonkey  3 ปีที่แล้ว +1

      We tape all our lines as well.

    • @tucobenedicto109
      @tucobenedicto109 3 ปีที่แล้ว +1

      @@TheLeverMonkey for direct burial we do too. But the tape is conductive and unsafe when you have as third rail. We use plastic caution tape. We did that for a dig out east with a ditch witch.

    • @TheLeverMonkey
      @TheLeverMonkey  3 ปีที่แล้ว +1

      @@tucobenedicto109 We do the same for gass line.

  • @barryguerrero6480
    @barryguerrero6480 หลายเดือนก่อน

    Given that Preston Pipelines and Ernest E. Pestana were based in basically the same neighborhood, I'm wondering if Preston picked up any of Ernie's people when he finally closed up his underground business. Mr. Pestana passed away in 2009.

    • @TheLeverMonkey
      @TheLeverMonkey  หลายเดือนก่อน

      I don't know. I started with them in 2010.

  • @motomuz1092
    @motomuz1092 2 ปีที่แล้ว +1

    Lever Monkey Merch quote....Wheres my burrito!

    • @TheLeverMonkey
      @TheLeverMonkey  2 ปีที่แล้ว +1

      In the roach coach where I left it.

  • @korton3665
    @korton3665 3 ปีที่แล้ว

    Awesome 👍👍 video

  • @rogerhodges7656
    @rogerhodges7656 3 ปีที่แล้ว +3

    I have enjoyed your videos. Scale is hard to tell. How deep are you digging? Also, It would be interesting to see how much rock they are separating with tthe Skully(?) bucket. It doesn't look like you are encountering much that is 6" plus.

    • @TheLeverMonkey
      @TheLeverMonkey  3 ปีที่แล้ว +1

      About 19-20 feet deep. This was the east side of the job the west had much larger rock.

  • @josiahlomas2111
    @josiahlomas2111 ปีที่แล้ว

    I'm a labor working transmission pipeline....hand dug a lot of bell holes.....them slopes look to vertical...can still cave in an hurt someone

    • @TheLeverMonkey
      @TheLeverMonkey  ปีที่แล้ว

      The camera makes it look worse than it is.

  • @bknoblauch1076
    @bknoblauch1076 3 ปีที่แล้ว +3

    Is there a safety concern in leaving that much open trench? It seems more susceptible to cave in. Why not backfill closer to the work area?

    • @TheLeverMonkey
      @TheLeverMonkey  3 ปีที่แล้ว +1

      It is normal for us to leave 500 feet open at a time. On bigger jobs we run a three crew system trenching, pipe laying, and backfill crew. Each crew works at there speed, each trying to catch the other. we make a game of it.

  • @williamdyer8839
    @williamdyer8839 3 ปีที่แล้ว +1

    3.00 handling charge on the baritto

  • @geoochoa4134
    @geoochoa4134 3 ปีที่แล้ว +2

    When you dig, do you prefer center line or track line?

    • @TheLeverMonkey
      @TheLeverMonkey  3 ปีที่แล้ว

      Going to add this to the next Q&A

  • @ArthurDentZaphodBeeb
    @ArthurDentZaphodBeeb 3 ปีที่แล้ว +1

    @17:40 with that rod waving around, could easily be off grade a few tenths.

    • @TheLeverMonkey
      @TheLeverMonkey  3 ปีที่แล้ว

      They wave the rod to find the high point.

  • @samuelm214
    @samuelm214 3 ปีที่แล้ว +2

    How much is average starting pay for a track hoe operator ? Looking to get into it thinking about joining the pipeline I heard they make pretty good. I already have experience on trackhoes and skid steers

    • @TheLeverMonkey
      @TheLeverMonkey  3 ปีที่แล้ว

      Check out my Q&A #3 or #2 video I answered that question in some detail.

  • @donaldmends2244
    @donaldmends2244 3 ปีที่แล้ว +1

    Didn't believe that OSH alow no Jack's in the ditch especially how deep your digging.

    • @windzer
      @windzer 3 ปีที่แล้ว

      as long as its sloped right theyre safe and hes doing it right for the soil condition

    • @TheLeverMonkey
      @TheLeverMonkey  3 ปีที่แล้ว

      We do have a engineer set the dig plan prior to the start of the job.

  • @ericamlin1460
    @ericamlin1460 2 ปีที่แล้ว

    👍

  • @jshan8205
    @jshan8205 3 ปีที่แล้ว +2

    How do ya'll set up your pipe laser?

    • @TheLeverMonkey
      @TheLeverMonkey  3 ปีที่แล้ว

      Will add that to the next Q&A video.

  • @brianwalker1386
    @brianwalker1386 8 หลายเดือนก่อน

    Legal

    • @TheLeverMonkey
      @TheLeverMonkey  8 หลายเดือนก่อน

      Yes, was a engineared dig.

  • @terryperrott9913
    @terryperrott9913 3 ปีที่แล้ว

    That V-bucket makes it nice , easier than trying to slope it with a normal bucket.

    • @terryperrott9913
      @terryperrott9913 3 ปีที่แล้ว

      @LionelRichiesCrackpipe I would have to agree

    • @TheLeverMonkey
      @TheLeverMonkey  3 ปีที่แล้ว +2

      Any time i have to do a open cut (no shoring) I ask for a V bucket.

  • @MrJenten10
    @MrJenten10 3 ปีที่แล้ว

    If you throw the spoils out far enough you dont have to waste a lot of time sweeping the spoils out of the way,,, that is rough on the swing gear, throw the spoils out far enough if some rolls back flat swipe and move on

    • @TheLeverMonkey
      @TheLeverMonkey  3 ปีที่แล้ว +1

      Had a support ho pulling the spoils away. he did not always get enough.

  • @mikemuniak4711
    @mikemuniak4711 3 ปีที่แล้ว

    How many feet a day are you getting in condishions like that ?

    • @TheLeverMonkey
      @TheLeverMonkey  3 ปีที่แล้ว +1

      in this situation I might get 300-400 feet in 8 hours.

  • @gordonhickok2396
    @gordonhickok2396 3 ปีที่แล้ว

    Is your trenching bucket set up for 3 to 1 grade for the sidewalls

  • @travisstonehouse4932
    @travisstonehouse4932 3 ปีที่แล้ว

    Have you ever did any digging for Floyd Johnston out of Clovis CA?

  • @me-pv4fn
    @me-pv4fn 3 ปีที่แล้ว +5

    Good vid t watch but I couldn't work for you lol can't stand bin whistled at especially wen u probs know there name a only whistle mi dog lol 😆

    • @TheLeverMonkey
      @TheLeverMonkey  3 ปีที่แล้ว +2

      I understand. Our crew we all whistle at each other, and have a different sound for each other. keeps us from losing our voices yelling at each other. most of us are loosing our hearing.

  • @PB-ct5it
    @PB-ct5it 3 ปีที่แล้ว

    Why no Benching or Shoring? Surely everyone wants to make it home safe.

    • @windzer
      @windzer 3 ปีที่แล้ว +1

      thats why its sloped and its in rocky soil he said that in the video

    • @fsk50oclub
      @fsk50oclub 3 ปีที่แล้ว +1

      Sloping is considered safer than benching in certain soil types

    • @TheLeverMonkey
      @TheLeverMonkey  3 ปีที่แล้ว

      All our trenching is certified by a engineer and approved by the city we work in.

  • @BAC54746
    @BAC54746 3 ปีที่แล้ว +1

    excuse me Google translation
    for the safety of the personnel who work at depth there! in France it is forbidden! it is imperative to put shields from 1.40 meters even in a hard and flared ground! you have no security check in the United States! in France they stop the work
    pour la sécurité pour le personnel qui travaille à la profondeur là !en France c'est interdit ! il faut impérativement mettre des blindages à partir de 1.40 mètre même dans un terrain dur et évasée! vous avez pas de contrôle sécurité aux États-Unis! en France ils font arrêter le chantier

  • @scottperman6495
    @scottperman6495 3 ปีที่แล้ว

    Citrus Heights Citrus Heights California

  • @lovejcdc
    @lovejcdc 3 ปีที่แล้ว +1

    WOOHOO I got the first like lol

  • @grasscutter88
    @grasscutter88 3 ปีที่แล้ว

    Who's got my burrito?? what did they charge. LMAO! Like he don't make enough money, who cares.....

    • @TheLeverMonkey
      @TheLeverMonkey  3 ปีที่แล้ว

      Just because I make good money doesn't mean I don't have bills to pay too. I only get $100 a weak for personal use and that includes burritos.

    • @grasscutter88
      @grasscutter88 3 ปีที่แล้ว +1

      @@TheLeverMonkey You must be married