Casa Blanca: Colorado Off-Grid House Build, Ep.6

แชร์
ฝัง
  • เผยแพร่เมื่อ 16 ต.ค. 2024
  • We've hit a huge milestone! I still have some detail work to do on the first-floor exterior walls (mostly sheathing, where wall segments require overlaps), but I've been able to start working on the interior walls as well. So far I have the master bathroom and closet framed in, and in my next video I should have the rest of the first floor interior framing done as well.
    Stay tuned - progress should be fast in this phase, and then it will slow down once I start on the second floor and roof because those steps just take more work (and safety considerations). As always, thanks for watching!