I see you didn't pour on so that a lot is left around the drainhole. Does your method allow the product to self- level? How do you prep the drain hole? Can you update using your earliest experience with this product. Have a tub and a one piece tub/ shower unit I'd like to use this on. Thx
@@marshaseals6063 I did 4 tubes total using this. One application each. 2 failed due to water getting behind them where the tile meets the tube, so it would have been better to do it before tiling to avoid there even being and opening for water to get behind. I have already scraped 1 all the way back off and have plans to refinish again. As far as the drain, you just tape it up and you have to keep rolling the stuff away from it so it doesn't pool up too much. Tape removal is a few hours later.
This was super helpful.
Great job
How long will this last with everyday 2x day use?
It will last as long as you silicon around the top so water can't get behind it. Once that happens it's a wrap.
I see you didn't pour on so that a lot is left around the drainhole. Does your method allow the product to self- level?
How do you prep the drain hole?
Can you update using your earliest experience with this product. Have a tub and a one piece tub/ shower unit I'd like to use this on. Thx
AND did you do more than 1 coat application on any tub you've used this product on....interested in durability longterm
@@marshaseals6063 I did 4 tubes total using this. One application each. 2 failed due to water getting behind them where the tile meets the tube, so it would have been better to do it before tiling to avoid there even being and opening for water to get behind. I have already scraped 1 all the way back off and have plans to refinish again. As far as the drain, you just tape it up and you have to keep rolling the stuff away from it so it doesn't pool up too much. Tape removal is a few hours later.
Move over Bob Villa...
🤣🤣👍🏼👍🏼💯💯🤣🤣🤣🤣🤣🤣