Gas Pipeline Construction Project - Pipeline Lowering-in at River Crossing with Liebherr Side Booms (Pipe Layers). Sheet Piling done to avoid collapse of river banks.
First detach the belt from the hook of pipe layer. Then pull the belt to one side. Since the soil below the pipe is loose, no issues when removing the belt. After dewatering, welding of the next pipe section can continue.
Now that was so perfect. Very nicely produced.thank you for the share
Thanks
I wish we had equipment like that back in the 1960s.We ran 16 inch gas lines with one 944cat loader with a sideboom.
Natrai trabajo de operador
nice..
Thanks
What was that like who’s welding that tie in
Tüm emeği geçen herkesin eklerine sağlık orda çok güzel bir çalışma oldu
siz da orda calisiyormusunuz?
Salam sizde orda çalışdızmı
We used concrete collars bolted on pipe to keep in trench in river
What's the next? How to remove the belt? How to do the welding for the remaining?
First detach the belt from the hook of pipe layer. Then pull the belt to one side. Since the soil below the pipe is loose, no issues when removing the belt. After dewatering, welding of the next pipe section can continue.
Nice!
Thanks
And the floaties on top were needed for what?
to fill with concrete so it does'nt float
ok
سايدبوم
German style
How to fuck a river up
River will be re-instated to the original condition after the pipeline laying work is completed.
grow a pair ding dong they fix it after