Gas Pipeline Construction - Pipeline Lowering in to the trench in normal terrain.

แชร์
ฝัง

ความคิดเห็น • 28

  • @williamschlenger1518
    @williamschlenger1518 3 ปีที่แล้ว +7

    Unbelievable equipment.Back in 1960s the company I worked for ran 28 miles of 12 inch gas line with one 944Cat louder and four welders.

  • @SenorAhole
    @SenorAhole 3 ปีที่แล้ว

    Awesome job! 👌

  • @mlctv6475
    @mlctv6475 ปีที่แล้ว

    I miss this job...1993 Qatif Junction and Ju' aymah pipeline, Saudi Arabia.

    • @kv9765
      @kv9765 10 หลายเดือนก่อน

      Are Liebherrs that old?

  • @pawansingh-xb8tf
    @pawansingh-xb8tf 3 ปีที่แล้ว +1

    Gud

  • @hamishtrotter7300
    @hamishtrotter7300 2 ปีที่แล้ว +1

    Pretty sure they caught the sides of the trench when they started. Coating damage ?

    • @mlctv6475
      @mlctv6475 ปีที่แล้ว

      Easy to repair ...but before that, it would undergo holiday testing first.

  • @saravananselvakumar5223
    @saravananselvakumar5223 2 ปีที่แล้ว +1

    What is that green colour coated in the welded field joints

    • @mlctv6475
      @mlctv6475 ปีที่แล้ว

      FBE

    • @vuraltosun6201
      @vuraltosun6201 8 หลายเดือนก่อน

      seam coating@@mlctv6475

  • @williamschlenger1518
    @williamschlenger1518 3 ปีที่แล้ว +3

    Who makes that sideboom,is it German made?

    • @ericbrown375
      @ericbrown375 2 ปีที่แล้ว +1

      It is a Lee bear 64 one of the finest pieces of equipment I have ever ran yet and the John Deere 1050 K

    • @kv9765
      @kv9765 10 หลายเดือนก่อน

      @@ericbrown375not the biggest fans of the Liebherr to be honest, but I came from the open cab era so little biased. The 1050’s are the Rolls Royce for sure though

  • @mudassaraslam512
    @mudassaraslam512 2 ปีที่แล้ว

    How long pipeline can be lowered with side booms in single operation?

    • @user-vb6dc3yb6t
      @user-vb6dc3yb6t 2 ปีที่แล้ว +5

      Endless, they assemble on top, weld it, check it, and a mile (or whatever) down the road the pipelayers put it in.. the system can keep going on as long as you need it to be. 🙂 You do not want flanges underground, these will give you trouble.. flanges do not flex, they rust, leak, are weak points. If they need to divide the pipe to put in a shutter or pumping system, they weld a curved pipe so it comes above ground, en only above ground will be flanged because it needs maintenance. Everything undergroung should be welded. Overnight the sidebooms will just stop, and the pipe might be secured on top with a nice beefy bulldozer to make sure everything is still upright in the morning or after heavy rainfall.
      I have done it a couple of times with crawler cranes, which is waaaaayyyy slower and seriously tricky.. sidebooms are old fashioned equipment that is still best suited for this job.

    • @the0hatusa
      @the0hatusa ปีที่แล้ว

      can i ask sth. when are the hidrostatic tests done? after lowering? which norm (asme) state that? regards

    • @oe542
      @oe542 ปีที่แล้ว

      @@the0hatusa normally the testing is done after it’s been lowered in.

  • @simranjitsinghhayersaab1096
    @simranjitsinghhayersaab1096 2 ปีที่แล้ว

    Nice u

  • @MattLGreer
    @MattLGreer 3 ปีที่แล้ว +1

    I can't be 100% sure but it looks like that pipe isn't coated?

    • @ahmedmuneer92
      @ahmedmuneer92 2 ปีที่แล้ว

      yes the joints need to be coated , not sure how they gonna do it inside trench

    • @utubedigitalmedia4590
      @utubedigitalmedia4590  2 ปีที่แล้ว +1

      Pipes are factory coated with 3 layer PE.

    • @utubedigitalmedia4590
      @utubedigitalmedia4590  2 ปีที่แล้ว

      Joints were coated outside the trench prior to lowering-in.

  • @Aleksandras477
    @Aleksandras477 ปีที่แล้ว

    Also pipeline from Canada to USA needed!

  • @bartbley1269
    @bartbley1269 7 หลายเดือนก่อน

    Looks like they screwed the welders by lowering it in with not enough pipe into the bell hole . 6 feet (2 meters) past the end of the bell hole is a minimum standard

  • @kv9765
    @kv9765 10 หลายเดือนก่อน

    That is by far one of the worst starts I’ve seen with lowering in for trying to get the pipe on the ground. Catch that swing, it should never hit the side walls like that, while it might not do much damage, that is complete amateur hour for those boom hands .

    • @donpeifer696
      @donpeifer696 9 หลายเดือนก่อน

      That was pitiful watching that pipe swinging hitting the edges of the ditch. The GREEN TEAM?

  • @nolanjohnston7050
    @nolanjohnston7050 8 หลายเดือนก่อน

    Amateur hour!