If the Comeng did produce the Tangara, it could had made the "Double Deck Design & Development" (The 4D project) in Melbourne to possibly succeed, delivering all 20 four car double deck design in Melbourne. This would likely become decommissioned as of 2021 to make way for the new single deck HCT.
one of the famous train fleet and sad story of Comeng cannot get this tender. COMENG is so passion for this roject. although (Nsw government decision inflavor Goninan..) few years later Comeng also building our Phase 1 Light Rail Car in Hong Kong around 1986-1988.(this is a tragic project despite the rollingstock are top notch quality ( It still being strong and run smoothly.They just got refurbishment by UGL around 2010-2013 ) and major caused ANI to sold and sperate Comeng factory...)
Thatll be the 4-D you guys had down there, only low density seating 2*2 upstairs as although the track gauge is broard in Vic the loading gauge is smaller than NSW, got some pics I took of the MetLink 4-D down in Newport depot before it got cut up
4:35. They are fooling them self. Since when do 85 passengers stand well back, all to the same side allowing 85 other passengers clear space to step onto the platform and leave. Where are the 3 or 4 pushy passengers who wont wait for people to get off. Instead pushing their way on. There were also no prams or push bikes.
Original Comeng is the most strong competitor to be award this project. but due to complicated circumstances. (Which related to SRA themselves was voice they need the train being made in Queensland.. )(arrcoding to memories booksby Late Comemg Engineer John Dunn)
Well even dafter is the insistence on medium width rolling stock outline for the much delayed new intercity fleet, a 10 car unit has less seats than an 8 car V set!
Seriously, seeing this train on the network would be a absolute dream!
Well, why don’t you just infiltrate the government Mr President?
If the Comeng did produce the Tangara, it could had made the "Double Deck Design & Development" (The 4D project) in Melbourne to possibly succeed, delivering all 20 four car double deck design in Melbourne. This would likely become decommissioned as of 2021 to make way for the new single deck HCT.
Church Groups: Is there anything they cant do?
74 TESTS???? Damn, they must’ve wasted their entire WEEK.
one of the famous train fleet and sad story of Comeng cannot get this tender. COMENG is so passion for this roject. although (Nsw government decision inflavor Goninan..)
few years later Comeng also building our Phase 1 Light Rail Car in Hong Kong around 1986-1988.(this is a tragic project despite the rollingstock are top notch quality ( It still being strong and run smoothly.They just got refurbishment by UGL around 2010-2013 ) and major caused ANI to sold and sperate Comeng factory...)
So, this was pretty much what killed off Comeng... they lost the war for a significant part of the CityRail fleet design process to Goninan.
Apparently SRA gave the Comeng drawings of the DDS to Gonninans for some competition
@@mjamesthomasb that's cooked, there is no way that's legal
damn, i would have rathered a Comeng car compared to a Goninan car
Thatll be the 4-D you guys had down there, only low density seating 2*2 upstairs as although the track gauge is broard in Vic the loading gauge is smaller than NSW, got some pics I took of the MetLink 4-D down in Newport depot before it got cut up
We should adapt something like this in melbourne
4:35. They are fooling them self. Since when do 85 passengers stand well back, all to the same side allowing 85 other passengers clear space to step onto the platform and leave. Where are the 3 or 4 pushy passengers who wont wait for people to get off. Instead pushing their way on. There were also no prams or push bikes.
Every day of the week during peak times in Sydney. People stand to the each side of the doors untill there is room to board.
@@terryflynn8830 I was a part of the network for 44 years. While yes some do stand aside, many still stand in the way.
The narrators voice sounds familiar?
It's grant goodman I think
Doors closing please stand clear
Mr Goldman
Imagine if tangaras were that long, would contest the length of V sets…
wait didn't gonninan make the tangaras
Yes but Comeng bid on it with a 23m narrow carriage and this stair set up
griffin rails Goninan was the one who made the final design. This was a mockup by Comeng, who were competing for the contract.
Just found this comment of mine 2 years later, I'm an idiot.
@@griffinrails lol
Original Comeng is the most strong competitor to be award this project.
but due to complicated circumstances. (Which related to SRA themselves was voice they need the train being made in Queensland.. )(arrcoding to memories booksby Late Comemg Engineer John Dunn)
It's a pity this design didn't materialise
Well even dafter is the insistence on medium width rolling stock outline for the much delayed new intercity fleet, a 10 car unit has less seats than an 8 car V set!