  • Its snowing and it sucks. I have got a brand new bg grey metal clad consumer unit designed for installing EV chargers and its IP rated.
    Click here to visit our Website 👉 www.greenhawkconstruction.co.uk/
    Click here to follow us on Instagram
    👉 / 3nmql8u
    ~-~~-~~~-~~-~
    Please watch: "REDOING WORK TRADIFY"
    • I Can't Stand Redoing ...
    ~-~~-~~~-~~-~

ความคิดเห็น • 43

  • @tommahoney7940
    @tommahoney7940 ปีที่แล้ว +1

    Nice install Mike,your work is always top quality.

  • @brad30
    @brad30 ปีที่แล้ว +2

    Top tip!
    Always use the Green/ green & white pair:
    Solid Green +
    Green & white -
    Should be easy to remember with “Green” Hawk

    • @metrotechguru5863
      @metrotechguru5863 ปีที่แล้ว

      Why use the green pair? Is there a reg that requires it?

    • @brad30
      @brad30 ปีที่แล้ว

      @@metrotechguru5863 Not at all it's just the company name is GreenHawk so it's easier to remember. You can use any colour twisted pairs 👍

    • @metrotechguru5863
      @metrotechguru5863 ปีที่แล้ว

      @@brad30 OK. I thought you might have known something I didn't about which wires must be used. Thanks.

  • @suhailwajid5040
    @suhailwajid5040 21 วันที่ผ่านมา

    I can only imagine the temperature in which you are working with.😮

  • @michaelscott3401
    @michaelscott3401 ปีที่แล้ว +1

    Hello lads not too cosy i hope get off he said i am like you i hate working in the cold i remember glanding off armoureds at Ciba Giegy factory in Cambridge one winter and i hated it i was constantly nipping into the canteen to grab a hot drink to defrost and get back to work i think sparks should get a cold weather suplliment it just numbs the brain and you cant think straight. oh what wonderfull memories not well done for sticking with it.

    • @GreenHawkConstructionltd
      @GreenHawkConstructionltd  ปีที่แล้ว

      thanks buddy the video didnt do it justice on how cold it was for me and Lewis

  • @sergiofernandez3725
    @sergiofernandez3725 ปีที่แล้ว +1

    Enjoyed the video. Lu looked freezing. Get him a HiViz Parker jacket or something. The weep vent above the Zappi looks iffy, as do some of the others. Keep up the good work.

  • @metrotechguru5863
    @metrotechguru5863 ปีที่แล้ว +2

    Very nice install lads. Too bad about the big grey PV box, but it wasn't your fault. Looks might stupid.

  • @adpreen
    @adpreen 2 หลายเดือนก่อน

    A few weeks working up north by the coast in January stripping 35mm h07 in a glorified tent, that was awful too

  • @johnmcfadden7418
    @johnmcfadden7418 ปีที่แล้ว +1

    Nice video Mike looks like you needed a wind breaker down there

  • @pauliboo22
    @pauliboo22 ปีที่แล้ว

    Invest in a good heat gun, use it to warm up the sheathing of the cable making it easier to work with.

  • @snozzuk2
    @snozzuk2 ปีที่แล้ว

    Why did you not fit the tails back entry?

  • @stevenodonoghue1281
    @stevenodonoghue1281 6 หลายเดือนก่อน

    Hi, is it cheaper to add the BG conser unit as you have in the video that to wire back from the internal consumer unit and have to use trunking and 5m of extra cable?? I mean, was the job classed S standard installation or was the BG unit an extra?

  • @petersmith6412
    @petersmith6412 4 หลายเดือนก่อน

    Hi I am not an electrician, I would like to ask is there a reason why the live feed does not run from the consumer unit to the wall charger, thanks

  • @chris..L-d4y
    @chris..L-d4y ปีที่แล้ว

    Her one for you how do you know if your on the end of a looped supply?

  • @kevanswift7797
    @kevanswift7797 3 หลายเดือนก่อน

    Heat shrink over the ends of the cables in charger would be a neater termination.

  • @tonupturner
    @tonupturner ปีที่แล้ว +1

    Where’s the Carhartt/Klein beanie from?! Mike from Residual Current has one too but I’ve idea where you boys are getting them.

  • @SPDTDL
    @SPDTDL หลายเดือนก่อน

    Just purchased a 4 year old new build. It has an EV charger installed using 2.5mm T&A, with a 25A MCB on the consumer unit. Charger has been capped to 25A using dip switches inside the unit. When I plug my car in, as expected it’s capped at 25A which is fast enough for me. Is this OK or should I be expecting a house fire? 😅

  • @jonathanstephens7804
    @jonathanstephens7804 ปีที่แล้ว

    nice install, been looking at the outdoor ccu's from BG. 16mm tails on 100A fuse? If this is acceptable i'd be happy to do this myself I always use 25mm but they are a right pain sometimes!

    • @brad30
      @brad30 ปีที่แล้ว +4

      You don't even need 16mm as it's a fixed load which will never exceed 32A hence you can use 10mm or 6mm double insulated tails. 👍

    • @jonathanstephens7804
      @jonathanstephens7804 ปีที่แล้ว

      @@brad30 see what your saying. What if say someone came along and wired a 40A hot tub from the EV board?

    • @brad30
      @brad30 ปีที่แล้ว

      @@jonathanstephens7804 Then the installation wouldn't be compliant with the regulations so the electrian would be at fault.

    • @danvictor3934
      @danvictor3934 ปีที่แล้ว

      ​@Brad Current Carrying capacity of cable read BS 7671 a 100 amps fuse needs at least 25 mm meter tails.

  • @pauliboo22
    @pauliboo22 ปีที่แล้ว +5

    If I was the client, I’d ask if you can fit another BG board replacing that PV monstrosity, two small black boxes are much nicer than that huge grey thing

  • @smoothie1000
    @smoothie1000 5 หลายเดือนก่อน

    The new ev fuse box should have been placed below the meter box . Would have looked neater.

  • @CurtainFlapper
    @CurtainFlapper ปีที่แล้ว

    My mains is shared, it has 2 black cables come into the house it terminates in the DNO fused head then is wired into a 2 gang isolator before going into the meter. Who would be responsible in getting the DNO to change it to a "none shared" supply? I've put of getting an electric vehicle because of the shared supply & prefer a petrol / Diesel as its easier to fuel up & I do between 50 & 150 miles daily. Therefore don't trust the range of electric vehicles so far, OK they might improve in the future. I'm just curious of who would be responsible in contacting the DNO, the electrician who fits the charge point or the garage supplying the car?

    • @GreenHawkConstructionltd
      @GreenHawkConstructionltd  ปีที่แล้ว

      This supply is not a shared supply but if it was the right action is to notify the local DNO as they will split the supply usually free when its for an EV install. It is usually down to the bill payer for this but the electrician has to notify the work after. I had a shared supply job the other day and had it confirmed by the DNO I could carry out the work before it was separated. No garage will ever get involved in the install of notification

  • @emilgemc8913
    @emilgemc8913 ปีที่แล้ว +1

    DNO sponsor you to do that?😂😂😂

  • @chrismason3341
    @chrismason3341 3 หลายเดือนก่อน

    You shouldn't even be fitting henly blocks in the meter box

  • @deang5622
    @deang5622 ปีที่แล้ว

    Plinth Course? Damp proof course.

    • @peterandrewwilson976
      @peterandrewwilson976 7 วันที่ผ่านมา

      No. DPC is a lot lower, nearer the ground. That is a decorative feature, a corbelled course. Something that "looks nice " and possible adds a few £££ to the price of the house.

  • @emilgemc8913
    @emilgemc8913 ปีที่แล้ว

    No NICEIC no napit required in another countries only in the UK

  • @tombarrett1487
    @tombarrett1487 ปีที่แล้ว +1

    Typical solar monkeys making it look a mess with an ugly box and cables scragging about.

  • @emilgemc8913
    @emilgemc8913 ปีที่แล้ว

    Working in Norway no need to have Permission from DNO No JIB No ECS No CSCS No Black card yellow card No UKAS register no United Union registered No Ring circuit only in the UK i see all those 15,000£ to have all those things to work

    • @anthonybragg
      @anthonybragg ปีที่แล้ว

      It is all a cartel, they all piss in the same pot and are milking us all out of money.

    • @deang5622
      @deang5622 ปีที่แล้ว

      Technically you can do this install with only membership of a competent person scheme such as NAPIT which is £420.