EXTENDING CONSUMER UNITS. How to add a second consumer unit to an existing circuit.

แชร์
ฝัง
  • เผยแพร่เมื่อ 6 ก.ย. 2024

ความคิดเห็น • 147

  • @learnelectrics4402
    @learnelectrics4402  3 ปีที่แล้ว +1

    SEE ALL - To view a list of all our LearnElectrics videos, click on the link below.
    There are many videos on many electrical topics including Installation, Part P, 18th Edition, Testing, Certification, Lighting, Sockets, Ring Circuits and much more.
    th-cam.com/channels/YaJQnpO4XAp0yCgqzMkmfA.html

  • @frank1847
    @frank1847 11 หลายเดือนก่อน +3

    Again another excellent video, clear and so easy to follow. I can tell, you have put a lot of hard work into preparing these videos, and it shows. Thank you.

    • @learnelectrics4402
      @learnelectrics4402  11 หลายเดือนก่อน

      Thank you very much Frank, really appreciated feedback. Dave.

  • @manofweed1
    @manofweed1 3 ปีที่แล้ว +4

    Best explanation on YT. As usual it's the official part, ie getting energy company to remove and install fuse that could be viewed as a problem 😅.

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว

      Thanks for the great comments. Appreciated. Dave.

  • @garyredmond1890
    @garyredmond1890 2 ปีที่แล้ว +1

    Perfect. Validates how I've planned to provide power to a new garden room. I will be getting a qualified electrician in as it's notifiable works, but now I know my suggested method is sensible.

    • @learnelectrics4402
      @learnelectrics4402  2 ปีที่แล้ว

      Brilliant. Glad the videos helped. Good luck and take care Gary. Dave.

  • @lylewatts6370
    @lylewatts6370 3 ปีที่แล้ว +4

    Thanks again for the great explanations, Now why can not we have our electrical installations simplified like you do. Its easy to understand and makes sense. I am an old Canadian electrician and always wondered who made our code book so complicated. Thanks again

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว

      They are written by the White Coats as I call them Lyle. But in truth, I wouldn't fancy writing 600 pages plus of Regs. Let them write them and we will interpret them. Good Luck. Dave.

    • @democracyforall
      @democracyforall ปีที่แล้ว

      Yes, it is the same in the UK but it is all to do with business , this is how they do it to make money. And this chanell is the best chanell actually.

  • @poochie1480
    @poochie1480 3 ปีที่แล้ว +1

    Just passed the 18th edition thanks to you on the 26.06.21

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว +1

      Great news Andrew. If I helped in a small way then that is good but you did this yourself because you bothered to learn. The secret now is to keep adding to your knowledge until it becomes internalised, until it is no longer a struggle to remember things. Keep watching the videos, lots more to good stuff to come. And spread the word about the channel, it might help others to pass. Good luck with your career, its a great trade to be in and its taken me around the world several times. Dave.

  • @leeedwards3783
    @leeedwards3783 ปีที่แล้ว

    Just came across your channel. I am really enjoying your videos and your calm, very explained manner in which you teach. Thank you

    • @learnelectrics4402
      @learnelectrics4402  ปีที่แล้ว

      Awesome, thank you, really appreciate the feedback. Thanks for watching, lots more to come, Dave.

  • @mikeb1417
    @mikeb1417 3 ปีที่แล้ว +1

    Excellent videos, electricity companies
    are very annoying they come and install a new electric meter in the property but cant be bothered to install an insulator switch at the same time.

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว

      I know Mike, several have noticed that.
      Glad you are enjoying the videos, thanks for your support. Dave.

  • @enahoroerijoh7210
    @enahoroerijoh7210 2 ปีที่แล้ว

    You are very clear in your teaching. Good stuff

  • @alextaramsari
    @alextaramsari 3 ปีที่แล้ว

    Very clear and easy to understand for every level!! This is the best learning youtube chanal for Electrician!! Thank you!!!

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว +1

      Wow, what a fantastic comment. That has really made our day. Thank you so much. Bux

    • @alextaramsari
      @alextaramsari 3 ปีที่แล้ว

      @@learnelectrics4402 🙏🏻

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว +1

      Thankyou for the positive feedback.

    • @alextaramsari
      @alextaramsari 3 ปีที่แล้ว

      Is there any chance to make a video about Different tests and techniques? And Fault Finding methods? Honestly this is the far better video channel so far I see on TH-cam! Thank you again🙏🏻

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว +1

      Yes, we are making videos on the different tests, completing test certificates and common faults with tips on how to find them. Keep watching, they are coming.
      Thanks for the very nice comments, we do appreciate your feedback. Dave

  • @manofcastle
    @manofcastle 3 ปีที่แล้ว +1

    Brilliant explanation 👍🏼👍🏼👍🏼

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว

      Happy that we could help. It makes all the effort worthwhile. Dave.

  • @leespiderpod
    @leespiderpod ปีที่แล้ว

    My head main is split. The live goes into the cut-out fuse and the neutral goes into a sealed Henley block. Then both the L & N go into the meter. Is this normal? Great videos btw!

    • @learnelectrics4402
      @learnelectrics4402  ปีที่แล้ว

      If its as the DNO installed it and it is still sealed, that should be ok. There are a thousand and one different examples of head wiring. Thanks for watching. Dave.

  • @leepy120
    @leepy120 ปีที่แล้ว

    Easy explanation , well done 👏

  • @IsmailKhan-yz3cx
    @IsmailKhan-yz3cx 9 หลายเดือนก่อน

    Great video!
    I have a large property which will be a 6bed HMO I want Every room to have it’s own CU so I can sub-meter that..
    Is correct to have a Henley block 1 to 6 and have a 16mm wire running to each room?
    Thank you

    • @learnelectrics4402
      @learnelectrics4402  8 หลายเดือนก่อน

      What you are suggesting is achievable. The cable sizes will depend on the loading for each unit. How many amps to each unit, what size Cu in each unit, what circuits in each unit,what diversity is applied etc. Thanks for watching. Dave.

  • @guls1977
    @guls1977 3 หลายเดือนก่อน

    Thanks a lot for guiding mate

  • @martinodriscoll5158
    @martinodriscoll5158 ปีที่แล้ว

    Always great advice and very clear

  • @jexidexi5687
    @jexidexi5687 3 ปีที่แล้ว

    Thanks for you're channel. Just discovered it and halfway watching this video I immediately subscribed. Lookin forward of watching all of youre videos. Kerp them comin. 👍

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว +1

      Thanks Jexi, appreciate the feedback and glad you have subscribed, there are more than 50 videos so far, lots more to come and Monday's video will be about 2 way split load consumer units. Dave.

    • @jexidexi5687
      @jexidexi5687 3 ปีที่แล้ว

      @@learnelectrics4402 thanks Dave. Ure videos are no nonsense. It's therapeutically informative for a competent person. Thank you & dont want to miss you're every Monday post. Stay safe and keep em comin. 👍

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว +1

      Great stuff.

  • @kevsta21
    @kevsta21 ปีที่แล้ว +1

    Great video as always, I really wish id had access to this level of information when I was doing my apprenticeship. I have a question too, im replacing a dual tariff CCU and the tails on the economy 7 side will not be long enough for the new unit (Iv had to buy double stacked). Can I use henley blocks within the CCU to extend the tails?
    There is no scope to rewire the existing tails as its in a block of flats. I just wondered if it was okay to extend them like this and have the henley block inside the unit?
    Any help or advice is greatly appreciated. Cheers

    • @learnelectrics4402
      @learnelectrics4402  ปีที่แล้ว

      Thanks for watching Kev and yes I totally agree. Where was the internet in the 70s when I was training.
      Henly blocks no problem, that is the standard way to extend. I used to torque the blocks up and then return to them after an hour or two of doing something else and just check the tightness of them. Copper creeps slightly when first screwed down and a second torquing is a good idea.

  • @zippymo672
    @zippymo672 3 ปีที่แล้ว +2

    Thanks Dave, another great video.
    Keep them coming.
    Can you do one which shows how to fit an rcd unit into an older consumer unit after installation of a i.e extractor fan into a bathroom.

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว +1

      Yes, why not. We will see what we can do. Give it a couple of weeks and we will put one together. Thanks for the encouraging feedback. Dave

    • @zippymo672
      @zippymo672 3 ปีที่แล้ว

      @@learnelectrics4402 Thanks mate. I'll keep an eye out for it.

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว +1

      No problems. We will definitely be doing one. Watch this space. Thanks. Dave

    • @zippymo672
      @zippymo672 3 ปีที่แล้ว

      @@learnelectrics4402 thanks mate!

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว +1

      You're welcome.

  • @robinstokes5179
    @robinstokes5179 2 ปีที่แล้ว

    Very clear description. What is the situation with for example, having a small shower or garage "fuse box" with a 2 or 3 kw load, on the end of an existing 6mm2 T&E running from a 32A MCB in the main RCD protected box. Rather than directly from meter tails & Henley splitter block/s? Is this a problem? Should the small fuse box also be RCD protected or does this cause problems, having an RCD running off an RCD? Should a simple 2 pole isolator type of main switch be used on the small extension box & rely on the 32A MCB & Main RCD?

    • @learnelectrics4402
      @learnelectrics4402  2 ปีที่แล้ว +2

      If the existing 32A supply is RCD protected that is fine. The garage unit, I assume will be an RCCB plus 1 or 2 MCBs, this is quite normal. If it was me I would use a 20A mcb in the garage unit and run the sockets as a radial circuit and 6A for lighting. Thanks for watching. Dave.

  • @noname1st139
    @noname1st139 ปีที่แล้ว

    Would this application work for a EV charger with a upgraded 100A fuse on the main consumer unit? The main consumer unit has no spare or surge protector, the House has solar & batteries.thabks

    • @learnelectrics4402
      @learnelectrics4402  ปีที่แล้ว

      I would suggest getting the Code of Practice for Electric Vehicle Charging Equipment Installation, published by The IET and available from Amazon. There are lots of things to consider for EV charging. Dave.

  • @livefree4661
    @livefree4661 ปีที่แล้ว

    Hi can you please explain or do a video on filling out certificate for a remote 2nd board thats been converted to a tt system.
    Thanks

    • @learnelectrics4402
      @learnelectrics4402  ปีที่แล้ว

      You will find the video on the link below very useful when completing certs for any second or third board, and indeed the first board too. Thanks for asking, thanks for watching. Dave.
      Filling in certificates for second boards
      th-cam.com/video/eIM0-uVtV0E/w-d-xo.html
      TT systems Zs and Ze
      th-cam.com/video/HSviV-HiLVo/w-d-xo.html

  • @user-xq1ms6of5t
    @user-xq1ms6of5t 3 ปีที่แล้ว +1

    Superb, many thanks as always for these uploads 🥃🇬🇧

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว +1

      Thank you for the positive comments, they really do help. More to come. Dave

  • @Robert-ts2ef
    @Robert-ts2ef 3 ปีที่แล้ว

    Excellent video again, although I would check that the meter tails are large enough if the fuse cutout has to be increased, otherwise replace with larger tails (or does the electricity supplier do that!?

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว

      Thanks Robert, good feedback and really appreciated. Usually it is the electrician that will supply the larger tails for the DNO to install if they upgrade the main fuse. Covered in a different video. Great to have you along and loads more to come. Dave.

  • @ramphago1240
    @ramphago1240 3 ปีที่แล้ว

    Thank you very help full
    It is well explained

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว +1

      Thanks for the great reply. lots more to come. Dave.

  • @davidpatterson1574
    @davidpatterson1574 2 ปีที่แล้ว

    Another excellent video-thank you

    • @learnelectrics4402
      @learnelectrics4402  2 ปีที่แล้ว +1

      Thanks David, thank you for watching. Dave.

    • @davidpatterson1574
      @davidpatterson1574 2 ปีที่แล้ว

      @@learnelectrics4402
      Thanks Dave, I’m retired now, but began serving my time, in 1974--only wish these resources were available back then, but we still managed-
      I don’t practice any more, but still do minor work for friends and family--
      Its great to see all “ the young people” showing us the work they are doing on you tube.
      Again many thanks, and keep on doing what you do-

    • @learnelectrics4402
      @learnelectrics4402  2 ปีที่แล้ว +1

      Thanks David. I started in 1976 and I totally agree about all the help that's available now. We had almost nothing then and the only way to find out information was the bookshop.
      I just caught the end of the valve era and the start of logic circuits. Does anyone remember Norbit logic now. Some good memories. Thanks for watching. Dave.

  • @user-ef3zq2qf1b
    @user-ef3zq2qf1b 8 หลายเดือนก่อน

    Would you say db2 earth can be run out of db1 or split with a block before both? Thanks

    • @learnelectrics4402
      @learnelectrics4402  8 หลายเดือนก่อน +1

      If extending fro DB1 then yes. The Line, neutral and earth should all come from the same supply point.

    • @user-ef3zq2qf1b
      @user-ef3zq2qf1b 8 หลายเดือนก่อน

      Thanks your videos are the best on hers

  • @arjansingh4971
    @arjansingh4971 10 หลายเดือนก่อน

    Would you need to put an 80amp isolator supplying the other consumer unit…

    • @learnelectrics4402
      @learnelectrics4402  10 หลายเดือนก่อน

      I used to do that if I was installing even a 40A second CU in a garage our outbuilding. It means that you have a method of isolating the supply to the garage when not needed. There are recorded cases of neighbours plugging into a garage supply and the customer being unaware of it for years.

    • @arjansingh4971
      @arjansingh4971 10 หลายเดือนก่อน

      @@learnelectrics4402 so u can just Henley block straight into the other CU without an isolator if it’s same building

  • @davidwoolfenden2004
    @davidwoolfenden2004 ปีที่แล้ว

    Hi What size cable should be used for this secondary consumer unit

    • @learnelectrics4402
      @learnelectrics4402  ปีที่แล้ว

      Whatever size will take the max expected current and taking into account environmental factors, volts drop, distance etc. There is no set size. Dave.

  • @krazylad84
    @krazylad84 3 ปีที่แล้ว

    Very informative, please keep them coming.

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว

      Thanks for the great feedback. Yes, lots more to come.

    • @krazylad84
      @krazylad84 3 ปีที่แล้ว

      @@learnelectrics4402 really appreciate you sharing the valueable knowledge which is complete as most of electrical videos are shared but not complete as some parts are missing. Thanks

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว

      Well thanks very much, we really appreciate your positive comments. We try to be different and tell you what you need to know to be good at your job.
      Lots more to come, tell your mates about us, it all helps.
      Dave

    • @krazylad84
      @krazylad84 3 ปีที่แล้ว

      @@learnelectrics4402 thanks and afcourse, looking forward to more content cheers

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว

      Thank you and yes, lots more to come.

  • @SuperGP1000
    @SuperGP1000 ปีที่แล้ว

    thanks again, where the consumer installation start, consumer's tail?

    • @learnelectrics4402
      @learnelectrics4402  ปีที่แล้ว

      From the consumer end of the incoming supply tails. Thanks for watching.

  • @TrailVapor
    @TrailVapor 2 ปีที่แล้ว

    Why do I have a 2nd 1P consumer unit sourced from an MCB in a 3P supplying consumer unit?

    • @learnelectrics4402
      @learnelectrics4402  2 ปีที่แล้ว

      I don't know the actual setup you have Rami. There could be lots of reasons. Usually distributing single phase to specific areas. Dave.

  • @markandrews8437
    @markandrews8437 3 ปีที่แล้ว

    Excellent video again 👍

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว

      Thank you Mark. Your positive comments are very much appreciated. Dave.

  • @HarpZSC
    @HarpZSC 2 ปีที่แล้ว

    What type of cable is recommend to supply second consumer unit? 16mm SWA or can we run 16mm T&E from henley block to second consumer unit?

    • @learnelectrics4402
      @learnelectrics4402  2 ปีที่แล้ว

      If it was me it would be 16mm double insulated meter tails if internal, or SWA if the cable was going outside.

  • @mahdie444
    @mahdie444 3 ปีที่แล้ว +1

    thanks for your great videos..but i have seen many places they get fed from main CU on 32A mcb ,running 10 or 6 mm SWA and RCD protected on 2nd cu. is it anything wrong if to do that way then ?

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว +3

      If the cable sizes are correctly chosen then that is good too. The beginning of our video says that we are assuming that there are no spare ways in the CU to do what you suggest, so we give the solution.

    • @williamreid-hall6525
      @williamreid-hall6525 3 ปีที่แล้ว

      How would you incorporate selectivity into the scenario mahdi has said. Should a delayed type rcd be used somewhere in the sub board or along the circuit to stop the main consumer unit from tripping?

    • @williamreid-hall6525
      @williamreid-hall6525 3 ปีที่แล้ว

      @learnelectrics

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว

      Yes, a delay type RCD upstream is an excellent idea where there are two or more RCDs downstream. Have a look at Regulation 536 in the Wiring Regs, especially 536.4.1.4
      Good points. dave.

  • @sixphredd
    @sixphredd 5 หลายเดือนก่อน

    Hello, I've had an electrician remove an MCB circuit and use that to run an armoured cable out to another consumer unit in my out building, till then I was running all the lights etc from an extension lead, since he's done this my original house consumer unit it's tripping an RCD, he's blaming my wiring in my outbuilding, but it can't be as I was using an extension lead before.
    Do you think this is how he's wired in the outbuilding consumer unit into my house consumer unit?
    Thanks.

    • @learnelectrics4402
      @learnelectrics4402  5 หลายเดือนก่อน

      Without actually seeing the install its difficult to say. This sometimes happens when circuits are changed or upgraded. You or the electrician need to investigate. Is it when any light is turned on, is it when all the lights are on. You will need to establish a pattern to it tripping. Sometimes, the extension lead will give just enough resistance to not cause RCD tripping if there is a fault, especially long extensions. Is the new wiring damp, sealed connections etc. Most electricians will come back and help you to solve it.

    • @sixphredd
      @sixphredd 5 หลายเดือนก่อน

      Update for you, the guy had wired the Neutral to the other RCD block (Which was still bridged in) however, by putting it on the correct side everything now works.. Low and behold he's trying to blame me... As expected.

  • @mahdie444
    @mahdie444 3 ปีที่แล้ว

    Another great video... Thankyou

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว

      Thank you, your positive feedback is truly appreciated. Glad you like our videos, your feedback makes it all worthwhile. Dave.

  • @srikanaparthy8525
    @srikanaparthy8525 ปีที่แล้ว

    How do you do this for a 3 phase? Do you use 4 Henley blocks instead of 2

    • @learnelectrics4402
      @learnelectrics4402  ปีที่แล้ว

      Basically yes. One for each phase plus neutral. Don't forget earth. Thanks for watching and lots more to come. Dave.

  • @Crystalpal1978
    @Crystalpal1978 3 ปีที่แล้ว

    Great video, thank you

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว

      Thanks for the positive comments, we do appreciate them. Bux

  • @garethgordon9141
    @garethgordon9141 3 ปีที่แล้ว

    Good video and thanks. Can you comment on sub mains longer than 3m to a second consumer unit in, say, a new extension. Is protection against overcurrent and fault current required on the output side of the Henley block? The On Site Guides are not much help, the IET Forum reigns confusion and Chapter 43 of the 18th is bewildering! Any insight would be appreciated. Thanks

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว +1

      Some DNOs like you to fuse/RCD at both ends of tails that are greater than 5 metres in length. A definitive answer is hard to find, all they say is to keep them as short as possible and be reasonable about the length if it does need to travel some distance.

  • @daron8982
    @daron8982 2 ปีที่แล้ว

    would it be possible to do a video how to wire a kitchen in domestic setting or how to wire a house?

    • @learnelectrics4402
      @learnelectrics4402  2 ปีที่แล้ว

      Have a look at this video on ring and radial circuits.
      th-cam.com/video/6GNb1SSEjQg/w-d-xo.html
      And don't forget about the search function on our dot.com website. Type in your question and it will bring up more help videos. Good luck. Dave.

  • @cobydavies5304
    @cobydavies5304 3 ปีที่แล้ว

    Loved it thank you

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว

      We are so glad you like our videos and thanks for the positive comments, they all help. Bux

  • @kbagheri9026
    @kbagheri9026 6 หลายเดือนก่อน

    Hi, Is it OK to have 2 Main Switches in the same consumer unit , one for the House and the other to isolate a garage consumer unit which is fed from the House?

    • @learnelectrics4402
      @learnelectrics4402  6 หลายเดือนก่อน

      Why not use an RCCB. This will act as a 2 pole disconnector and RCD protect the cables to the garage.

  • @jameshansing5396
    @jameshansing5396 3 ปีที่แล้ว

    Could there be an argument for installing 2 x isolators, one for each board? Thanks for the great vids by the way...

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว +1

      Absolutely there could James. In fact I do that if I am installing a second board in an outbuilding or garage that is not joined ion to the house. Any problem with the external wiring, it can be isolated and made safe. Good question. Thanks. Dave.

    • @jameshansing5396
      @jameshansing5396 3 ปีที่แล้ว

      @@learnelectrics4402 have you done or are you doing a video on when you would and when you would not add a second board for things like garages or outbuildings? Or where would I look in the regs?

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว

      James, adding CU's is between you and your customer. Nothing in the Regs.
      Hope this helps.

    • @jameshansing5396
      @jameshansing5396 3 ปีที่แล้ว

      @@learnelectrics4402 can it have anything to do with volt drop? Or I guess just practicality?
      Sorry for all the questions, just keen to learn..

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว +1

      Two different things James.
      Do you want extra circuits that is the question you need to ask.
      Any circuit existing or added should meet volts drop rules.
      See our video Voltage Drop Calculations on this link.
      th-cam.com/video/Z-kw680SIoo/w-d-xo.html

  • @FlubberDuck_101
    @FlubberDuck_101 3 ปีที่แล้ว

    can u take the supply from the main switch to feed the second CU

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว +2

      You may not get two meter tails into one hole on the main switch. From what you have said, it sounds like the second CU is only a small load. Rather than the main switch, put a 40amp breaker in the board to feed the new CU, if the original will take the extra load. Don't forget safe isolation when working around consumer units.

    • @FlubberDuck_101
      @FlubberDuck_101 3 ปีที่แล้ว

      @@learnelectrics4402 thank you soo much this cleared alot up for me I will be visiting this channel alot more and ask plenty more questions aha thank you again. what cable should I use to feed the new CU would 6mm² Swa be ok?

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว +1

      Have a look at this video if you are taking a feed from an MCB.
      th-cam.com/video/VtTUkUpQ-Rc/w-d-xo.html
      Hope it helps.

  • @kingofthetrowel1725
    @kingofthetrowel1725 2 ปีที่แล้ว

    Nice one dave another interesting one 👍 just of topic but which is the best way to find the correct college course and price to be able to retrain as an electrician to the stage where you can register with a scheme napit niceic etc and am I right it usually takes 3-4 years to complete .ill probably get stick in the comments I understand I would never be a proper time served spark but I’m just thinking of an option as I find electrics very interesting to the point I’ve nearly completed all the sparky videos on TH-cam 😂 including your videos dave 😂👍👍

    • @learnelectrics4402
      @learnelectrics4402  2 ปีที่แล้ว +3

      Don't ever think that you cannot do it. Lots of people are in the same situation, later in life etc. If you want to be a sparky you can be. 3 to 4 years not true unless you take the apprentice route or only approach this part time. A lot comes down to your determination and time input.
      To join a scheme like Napit or NICEIC etc. you will need to show educational achievement (exams) and practical skills (assessments, on the job etc.). Plus, the more you practice and read the better you will be. Make your own test board and wire it up and test it. Test your house, change switches or ceiling roses in your house. These are all skill building and good for the confidence.
      And actually go to at least two different training centres and put your story before them. Don't rely on the phone, turn up on their doorstep and ask to look at their training facilities. See what they suggest, the routes, the time etc. If they are going to take 3 or thousand pounds off you, the least you can expect is a fair chunk of their time and attention, not just 5 minutes, before you make a decision. There is no "Instant Electrician course" so be aware that some will try to sell you one and three week courses that guarantee you are fully trained (not). It takes time. Months in fact. The most important thing is being able to apply your theory to practical work. And testing skills are very very essential.
      Do not part with ANY money until you are certain that you have found the right centre.
      Speak to NAPIT for instance, their training packages are very good (I used to teach for them). They might be a little more expensive but they will give you good training. So will other centres too. Just watch out for the one's that promise that you will be an expert after 4 weeks.
      And I will say it again, read and practice over and over again. That's why professional snooker players are so good. They practice with the same balls on the same table in the same room for hour after hour after hour. And then they do it all again the next day, and the next, and the next.
      Good question. You can do it and don't worry about where you started, it's where you finish that matters. Dave.

    • @kingofthetrowel1725
      @kingofthetrowel1725 2 ปีที่แล้ว

      @@learnelectrics4402 nice one dave thank you 👍👍

    • @learnelectrics4402
      @learnelectrics4402  2 ปีที่แล้ว +1

      You are very welcome buddy. Keep me in the loop and thanks for your support with the LearnElectrics channel. Dave.

    • @kingofthetrowel1725
      @kingofthetrowel1725 2 ปีที่แล้ว

      @@learnelectrics4402 I will do dave 👍 thank you again, can’t wait for more videos 🙌🏻🙌🏻 cheers

    • @learnelectrics4402
      @learnelectrics4402  2 ปีที่แล้ว +1

      Thursday this week is garage door motors and next Monday is 2 plate lighting circuits.

  • @cankomur9977
    @cankomur9977 3 ปีที่แล้ว

    Amazing 👋🏻

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว

      Thank you for your short but very powerful compliment. Much appreciated. Dave.

  • @paulneary703
    @paulneary703 3 ปีที่แล้ว

    Hi guys, if I was to add a sub main for a new consumer unit in a new Anex, and I was running 10mm swa, does the consumer unit main switch have to be higher rating that the sub main main switch?

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว

      No. If it is a switch only, then as long as the switch is at least the correct size for the part of the circuit it protects it is ok.

    • @paulneary703
      @paulneary703 3 ปีที่แล้ว

      @@learnelectrics4402 hi sorry if I’m getting confused here, Protective device is equal or less than current carrying capacity of cable , bs7671 says 10mm 3 core ref method D is 50A so will that need a 50A fuse or less at the switch/fuse at main incomer? 😃

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว +2

      Paul, two different things. A main switch (switch only) should be able to disconnect at least the maximum current of the circuit. Most houses are protected by a 100A incomer fuse.
      If you know the loading may be close to 100 amps at times, then a 100A main switch is ok.
      A fuse or breaker should disconnect before the maximum rating of the cable.
      If you know the cable rating is 14 amps say then a 10 amp circuit breaker is the choice, not a 16 amp one. Always protect the cable.

    • @paulneary703
      @paulneary703 3 ปีที่แล้ว

      @@learnelectrics4402 got it thanks! :)

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว

      That's great Paul
      Also, if you look on page 188 of the Wiring Regs, there is a table that lists the functions of different devices, whether they are switches only, overload protection etc. main switches are usually BSEN 60947-3 types

  • @shokeyshokey2097
    @shokeyshokey2097 3 ปีที่แล้ว

    L u bro

  • @watchtime9072
    @watchtime9072 ปีที่แล้ว

    Can two consumer units be installed in series?

    • @learnelectrics4402
      @learnelectrics4402  ปีที่แล้ว

      Have a look at this video, I think this will answer your question. Thanks for watching. Dave.
      th-cam.com/video/YIlTbuChRSY/w-d-xo.html

  • @abdirizakhassan1073
    @abdirizakhassan1073 3 ปีที่แล้ว

    Great video.
    Thanks

    • @learnelectrics4402
      @learnelectrics4402  3 ปีที่แล้ว

      Really happy that you like it. Lots more to come. Thank you.