Two Years Review and Economic & Environment impact of Rooftop Solar Plant

แชร์
ฝัง
  • เผยแพร่เมื่อ 27 ต.ค. 2024

ความคิดเห็น • 27

  • @chaitanyakshirsagar9861
    @chaitanyakshirsagar9861 2 ปีที่แล้ว +6

    Excellent video. By watching your videos, I built my 5.3KW Solar Plant with 12 Panels of Waree 445 Panels and 12 Enphase 7A micro inverters.. so far I am generating about 24Units per day. Thanks alot for all the insightful videos

    • @HinrenEngineering
      @HinrenEngineering  2 ปีที่แล้ว +1

      That is awesome!

    • @indidoctor
      @indidoctor 2 ปีที่แล้ว +1

      Hiren is truly one of India's best solar experts. I was inspired 2 years ago & started my system with iq7A & Anchor Panasonic 450wp (x12=5.4KW). This year expanded it to 8.1KW by adding 6 more panels. Generating 33-36 units per day which is balancing my home's daily energy demand of 25-30 units per day. Glad that I picked enphase. Planning to add 5-6kw more in the future for supporting EVs.
      Major drawback I'm facing in Andhra Pradesh is that my net metering application is still pending since a year, using the envoy in zero export per phase mode. Would have been a complete system with net metering. Till then my 36v off grid system is covering the lighting & critical loads in the night. Still paying the power bill for night time air conditioners consumption.

    • @chaitanyakshirsagar9861
      @chaitanyakshirsagar9861 2 ปีที่แล้ว +1

      @@indidoctor wow. Thats awesome. Enphase inverters are fantastic!

    • @indidoctor
      @indidoctor 2 ปีที่แล้ว

      Yeah I agree 100%@@chaitanyakshirsagar9861 never expected that enphase system can be upgraded & expanded so easily. Glad I chose an enphase system inspired by hiren. Would have become a hassle if I picked a string inverter even though the price is cheaper. Having an AC circuit directly from the panels is the major benifit. Even the envoy's monitoring showed me a defective panel that helped me claim warranty. That was amazing.

    • @jayanthmv7872
      @jayanthmv7872 ปีที่แล้ว

      I have a query, how do I reach you?

  • @sagarbose1679
    @sagarbose1679 2 ปีที่แล้ว +2

    Yet again!!! What a wonderful video!! Very nicely explained.. The more I watch your videos, the more I am falling in love with the beautiful way you planned and executed the work.. Be it your videos on hybrid systems or on agri pv system or rainwater harvesting.. All are simply amazing.. They dont appear to me as yet another example available in market or youtube.. I can actually feel the dedication and love with which these " pieces of arts" are crafted by you.. Kudos to your work Sir and 7 blessings to you for bringing these wonderful system designs to us 🙏🙏

  • @googleprivacy1515
    @googleprivacy1515 2 ปีที่แล้ว +1

    Before this video, we are going to install this just to save electricity cost and environment.
    After this video, I'm getting return of investment better than bank after installing this.
    Perspective changed! Awesome.

  • @sagarbose1679
    @sagarbose1679 2 ปีที่แล้ว +1

    In absence of Enphase Ensemble technology in India as of now, how can we actually design a hybrid pv system with battery backup using AC MODULES? Have you had any such experiment made in the past? As compared to traditional pv modules connected in strings through AJB giving DC output which is then connected to a hybrid string inverter , which has provision for charging the DC battery directly using DC output from PV strings, the AC modules might have different challenges owing to their AC output. Can we overcome this challenge by simply connecting the AC modules' strings to DG port of hybrid string inverter (instead of connecting it to DC input meants for PV module Strings, so as to allow us charging the DC battery backup and using it in case of grid failure ? Despite considering the additional cost of hybrid string inverter in addition to several microinverters already installed with each module ( to get advantage of panel level monitoring, No DC Earthing, No DCDB etc) is this model possible practically? If yes please share your experiences through a dedicated video if possible.

  • @Varulaksh01
    @Varulaksh01 ปีที่แล้ว

    Hello Sir,
    Great Presentation.
    I have one question,
    1. How do we integrate this micro inverter technology with the existing Battery inverter backup system so that I can have both redundancy and solar work together..?
    2. If grid power is down will this micro inverter sill produce electricity with less wattage.?
    3. Is bi directional net metering mandatory for this Micro interver AC solar technology.?
    Thanks in Advance

  • @googleprivacy1515
    @googleprivacy1515 2 ปีที่แล้ว

    Hi again, if you can post some info about rain water catchment similar to solar grid, it would be grateful.
    At this season , Rain water system would be more relevant. Just a suggestion.

  • @mrlobbyist2061
    @mrlobbyist2061 2 ปีที่แล้ว

    Just a quick question. Why has the customer taken 5KW sanction when the max system production load is 3KW? wouldn't the fixed cost of 350 rupees(for 5KW meter) go a bit lower (not much but still)?

    • @HinrenEngineering
      @HinrenEngineering  2 ปีที่แล้ว

      The load was taken at the time of house construction. Perhaps at that time , customer felt that they would need 5 KW .
      Also 3 KW of solar is installed to generate required number of units (electrical energy) to offset the energy consumption.
      The maximum power drawn can exceed 3 KW . Say if the geyser and AC and iron box are on together, the 'Power' drawn will be in excess of 4 KW .

  • @channabasava4234
    @channabasava4234 ปีที่แล้ว

    How you consider column 'B'?

  • @channabasava4234
    @channabasava4234 ปีที่แล้ว

    Which app wr use for enphase Inverter sir.

  • @cliffordlily
    @cliffordlily 2 ปีที่แล้ว

    Great presentation! One question : Is it possible to have a hybrid system with micro inverters?

    • @HinrenEngineering
      @HinrenEngineering  2 ปีที่แล้ว +1

      You can definitely use it. It is called *AC coupling*. However, it is in no way economical. You have to do 1:1 Coupling. At that cost, you can as well do a complete hybrid system.

  • @vinodmanu2002
    @vinodmanu2002 2 ปีที่แล้ว

    Sir I want review on Panasonic hit panels with out put detail

  • @maulikdalal5913
    @maulikdalal5913 2 ปีที่แล้ว +2

    Wonderful work

    • @maulikdalal5913
      @maulikdalal5913 2 ปีที่แล้ว

      Dear hinren company you are doing well done work

  • @muralidharanbbaskar2467
    @muralidharanbbaskar2467 2 ปีที่แล้ว

    Price of hybrid inverter sir

  • @maruonline315
    @maruonline315 2 ปีที่แล้ว

    Fixed charges will also increase.

  • @mangeshiyer4711
    @mangeshiyer4711 ปีที่แล้ว

    545w module can we use IQ7A

    • @HinrenEngineering
      @HinrenEngineering  ปีที่แล้ว

      Yes . However there will be some clipping. The IQ 7A series can handle upto 460 W panels . So anything more will get clipped . But it may happen only a few times in a year .

    • @mangeshiyer4711
      @mangeshiyer4711 ปีที่แล้ว

      @@HinrenEngineeringthanks for the information

  • @vishaljoshi4991
    @vishaljoshi4991 2 ปีที่แล้ว

    sir make a video on kannada as I saw bescom