- Watch the latest footage of what going on at the Gigafactory site and surrounding area. Plenty of Model Ys and Cybertrucks staged for loading on to carriers. Electrical switches at the Megapack showing they are not online yet. construction continues on the south end extension.
Please Like and Subscribe to this channel. Click the bell for notifications.
Needed support can be given at this link: www.paypal.com/donate/?hosted...
#Tesla #Gigafactory #Texas #Austin #Model Y #Cybertruck #Family #Kids #Children #Construction #DumpTrucks, #Scrapers, #Excavators - ยานยนต์และพาหนะ
Please Like and Subscribe to this channel. Click the bell for notifications.
Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4
Starting today Tesla is allowing Ford Vehicles to use its superchargers using an adaptors.
Thank you!
Great Brad. Thank you a lot!
Merci👍👍👍
I counted 173 CTs today, including 45 on the outbound lot. Its creeping up.
Thanks Brad, good site update.
Thanks Brad
10:52 curved the concrete! The forms were square earlier this week. Still looks a bit weird with the vault in the middle of the curve though.
6:32 asphalt paving, guess it was just a sub base issue before
Thanks Brad!
Tesla is now allowing Ford vehicle to use its superchargers with an adaptor.
How about GM?
@@rtz549Ford seemed to have their act together with sign up for the free adapter and OTA updates going out. Too soon to tell if GM can match that enthusiasm.
Could these 4 new tanks be for paint? There is a new paint system
laying on the ground over in the equipment lot waiting to be installed.
!
Any idea what the 40ft blue containers with the yellow access stairs are? Two at the boring company site and five more at the main building at 10:30.
Water storage generally. Over the 3 years of construction these have been outside Paint for extended periods of time on 3 or 4 occasions (months). The earliest instance was when the Paint Shop water treatment plant first became operational.
Across the road at the New EOL building would be non-potable water for fire services. Water main over there not connected into the city supply yet. Potable water supply seems to be a separate small pipe connected into the housing estate.
Had a similar arrangement at Cathode for many months before that was connected to the city supply.
The trailers come and go all around the site. A couple at the temporary batch plant since that first became operational.
A white one at 9:47 to the right. Red one at 12:39 towards the top.
Someone once referred to the trailers as 'Frac tanks' as they are commonly used in the fracking industry.
Seen at the Berlin site also.
Thanks Brad Great Job
Liked 645, thanks Bad Brad, your not bad, I like rhythming, saw Joe's inside, you have more projects going at Gigi Texas then all other car companies, most people do not realize how far Tesla is down the road, the electric will become the most important tech manufacturing in the next few months, it is invisible, but here comes the storm for ICE engines,
ICE engines, DOA< DOA watch,
Sure looks like the N storage yard is starting to empty out finally.
So much is coming together fast, and production capacity will explode as this year progresses. Imagine the following years.
Facilities for many more employees equate to a huge capacity as automation greatly amplifies each person's output.
Engineering evolves into maintenance.
6:38 I count 8 trapezoidal "robots?" stationed along rows 1 and three beside the cabinets..... What are they? What do they do? It looks like a camera on top of a pole on top of the trapezoidal body?
6:38. Wi-fi stations? Similar seen at the Southend when that was the EOL.
See Joe's 4 November 2022 video at 9:56. My comment at the time was, "Southend. Bottom. Small trailer with PV panels. Joe’s photos show these are marked
TESLA NET-OPS (then a number). Mobile wi-fi point for OTA (over the air) updates?"
8:35 Does one of the construction workers own a cybertruck❓️
8:35. Maybe. Security has a couple also. More likely that.
What if the Boring tunnel isn’t meant to transfer new cars to logistics lot?! The only reason for this tunnel to terminate inside the glass ‘welcome center’ is if it were meant to be a pedestrian moving tunnel between sites.🤔
That makes more sense than for cars, where cars can get to they other side by driving another 300yr south.
Sure seemed quiet there today.
Thanks Brad for the excellent close up view!
BESS substation:
@ 14:39 All 24 switches to the megapacks open. They have been open for the last 9 days. Since Joe's video 2/21/24 at the 22: 37 timestamp.
EDIT: Upon review, 6 out of the 24 switches are closed.
Megapacks:
@ 15:05 Yellow Caution tape around 4 rows (16 Megapacks).
Parking garage:
3:05 Concrete pour on the top deck.
Eastside of casting:
@ 11:23 (Left) Main power duct-bank..... A lot of cables need to be spliced. Some are new cables, pulled through from the Tesla Enclosure/Mega-vault south of the LCRA substation. The rest of the cables pulled out of the temporary routing through the old supercharger vault (Vault by the building, just south of the open vault). The temporary cable routing enabled the reconstruction of the duct-banks without interruption of power to the factory.
Yea Tesla!
@3:05 I cannot believe we are yet to see a concrete pump doing one of the pours on the parking garage. They have done many of the lower floors but I have never seen them actually pumping concrete on either Joe or Brads videos
@@Dwayne.Shea.231 3:05. I haven't recorded one. Got one parked on the southside, some pump lines run across the ramp another time.
Lower floors probably done with a less noticeable line pump.
@@Dwayne.Shea.231 They definitely pump the concrete. Unfortunately, we've missed every one of them. On Joe's 2/12/24 video at the 14: 32 time stamp... You will see a pump hose on the left ramp.
I'm puzzled by their decision to install those monster glass panels so early in the construction of the south extension. It seems like there would be a danger of a crane operator accidentally bumping the wrong control lever and creating a very expensive pile of shattered glass.
Not early. Heavy construction complete.
When is the TESLA signage going on the building?
...... *operational update* ??? sionara
Tesla is now allowing Ford Vehicles to charger on its superchargers with an adaptor.