Brad Sloan
Brad Sloan
  • 637
  • 5 089 040
"Megapack Support Piers install" Tesla Gigafactory Texas 12/21/2024. 1011AM
Piers are being put into the ground at the Megapack site for support of the Megapacks. Glass is being installed on the east side or the south extension. Only saw one car carrier leaving with Tesla vehicles.
Please Like and Subscribe to this channel. Click the bell for notifications.
Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4
#Tesla #Gigafactory #Texas #Austin #Model Y #Cybertruck #Family #Kids #Children #Construction #DumpTrucks #Scrapers, #Excavators
มุมมอง: 6 241

วีดีโอ

"Superchargers Canopies Done" Tesla Gigafactory Texas 12/19/2024 10:09AM
มุมมอง 7K7 ชั่วโมงที่ผ่านมา
The canopies being built over the Superchargers are finished. Work continues around the tunnel exit. Glass in being installed on the east side of the south extension. Busy day with shipping out vehicles. Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4 #Tesla #Gigafactory ...
"Canopies For Superchargers" Tesla Gigafactory Texas 12/17/2024 10:19AM
มุมมอง 9K12 ชั่วโมงที่ผ่านมา
Canopies are being constructed for the superchargers. The road leading to the tunnel got paved. Busy day for shipping out vehicles. Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4 #Tesla #Gigafactory #Texas #Austin #Model Y #Cybertruck #Family #Kids #Children #Constructio...
"Megpack Preps & Switchyard Mods" Tesla Gigafactory Texas. 12/14/2024 10:21AM
มุมมอง 8K19 ชั่วโมงที่ผ่านมา
Ground for the Megapacks is being worked. More material for the switchyard is brought in. Bottom of the cooling towers is wrapped in plastic. Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4 #Tesla #Gigafactory #Texas #Austin #Model Y #Cybertruck #Family #Kids #Children #C...
"Tunnel Covering Start" Tesla Gigafactory Texas 12/12/2024 10:09AM
มุมมอง 10Kวันที่ผ่านมา
Start of the cyberframe over the tunnel getting its roof. A large H frame is being installed at the switchyard. There is increase with shipping on the west side. Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4 #Tesla #Gigafactory #Texas #Austin #Model Y #Cybertruck #Famil...
"Cyberframe Tunnel Entrance" Tesla Gigafactory Texas 12/10/2024 10:06AM
มุมมอง 11Kวันที่ผ่านมา
The cover frame looks like the outline of a cybertruck at the tunnel entrance. Plenty of Tesla vehicles being shipped out today. Two of the cooling towers are working today. More work going on around of the electrical switchyard. Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9...
"Cooling Tower's Dancing Waters" Tesla Gigafactory Texas 12/8/2024 9:41AM
มุมมอง 8K14 วันที่ผ่านมา
We have a CU shot of the turbulant waters in the cooling towers. Slow progress of the large transformer in the switchyard. The tunnel entrance has plastic sheeting to keep out the rain. Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4 #Tesla #Gigafactory #Texas #Austin #Mo...
"Lot Full Of Castings" Tesla Gigafactory Texas 12/5/2024 10:38 AM
มุมมอง 63K14 วันที่ผ่านมา
On the northend parking lot is full of castings. Lots of over production going on here. More cooling tower testing and see dancing waters below the blades. Average day for shipping out. Exterior work continues on the tunnel entrance. Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRV...
"Shipping Out Teslas" Tesla Gigafactory Texas 12/3/2024 9:17AM
มุมมอง 7K14 วันที่ผ่านมา
A mix of Model Ys and Cybertrucks shipping out today. Work continues with the area around the tunnel entrance. Close up of the water moving in the cooling towers. Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4 #Tesla #Gigafactory #Texas #Austin #Model Y #Cybertruck #Fami...
"Sneak Peek Inside The Tunnel" Tesla Gigafactory Texas 11/29/2024 10:40AM
มุมมอง 13K21 วันที่ผ่านมา
We take a look while no is around inside the Tunnel. Seems everything is shut down for the Holidays. Flags are flying at the front entrance. Two of the six cooling towers are in operation. Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4 #Tesla #Gigafactory #Texas #Austin ...
Tunnel Exterior Construction Tesla Gigafactory Texas 11/26/2024. 9:28AM
มุมมอง 9K21 วันที่ผ่านมา
The exterior of the entrance to the Tunnel had taken shape. Cooling Towers are still in Testing. West side shipping of vehicle is a normal pace. Big transformer awaits installation. Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4 #Tesla #Gigafactory #Texas #Austin #Model ...
"V4 Superchargers Installation" Tesla Gigafactory Texas 11/23/2024 9:18AM
มุมมอง 7K28 วันที่ผ่านมา
"V4 Superchargers Installation" Tesla Gigafactory Texas 11/23/2024 9:18AM
"New Large Transformer arrives" Tesla Gigafactory Texas. 11/21/2024 9:33AM
มุมมอง 11Kหลายเดือนก่อน
"New Large Transformer arrives" Tesla Gigafactory Texas. 11/21/2024 9:33AM
"Tunnel Entrance Paving" Tesla Gigafactory Texas 11/19/2024 10:00AM
มุมมอง 12Kหลายเดือนก่อน
"Tunnel Entrance Paving" Tesla Gigafactory Texas 11/19/2024 10:00AM
"Weekend Update" Tesla Gigafactory Texas 11/16/2024 9:11AM
มุมมอง 8Kหลายเดือนก่อน
"Weekend Update" Tesla Gigafactory Texas 11/16/2024 9:11AM
"Tunnel Entrance Preps" Tesla Gigafactory Texas 011/14/2024 10:09AM
มุมมอง 9Kหลายเดือนก่อน
"Tunnel Entrance Preps" Tesla Gigafactory Texas 011/14/2024 10:09AM
"Tunnel Work" Tesla Gigafactory Texas 11/12/2024 9:54AM
มุมมอง 9Kหลายเดือนก่อน
"Tunnel Work" Tesla Gigafactory Texas 11/12/2024 9:54AM
"Weekend Update" Tesla Gigafactory Texas. 11/9/2024 9:31AM
มุมมอง 8Kหลายเดือนก่อน
"Weekend Update" Tesla Gigafactory Texas. 11/9/2024 9:31AM
"More Glass & Tunnel Work" Tesla Gigafactory Texas 11/7/2024 9:34AM
มุมมอง 8Kหลายเดือนก่อน
"More Glass & Tunnel Work" Tesla Gigafactory Texas 11/7/2024 9:34AM
"More Glass Install" Tesla Gigafactory Texas 11/5/2024 6:26AM
มุมมอง 8Kหลายเดือนก่อน
"More Glass Install" Tesla Gigafactory Texas 11/5/2024 6:26AM
"Tunnel Painting" Tesla Gigafactory Texas 11/2/2024 9:14AM
มุมมอง 14Kหลายเดือนก่อน
"Tunnel Painting" Tesla Gigafactory Texas 11/2/2024 9:14AM
"What's On Top Of The Teslas" Tesla Gigafactory Texas 10/31/2024 9:14AM
มุมมอง 11Kหลายเดือนก่อน
"What's On Top Of The Teslas" Tesla Gigafactory Texas 10/31/2024 9:14AM
:Busy Shipping Out" Tesla Gigafactory Texas 10/29/2024 8:50A
มุมมอง 7Kหลายเดือนก่อน
:Busy Shipping Out" Tesla Gigafactory Texas 10/29/2024 8:50A
"Glass Pane Installation Progress" Tesla Gigafactory Texas 10/26/2024 9:35AM
มุมมอง 9Kหลายเดือนก่อน
"Glass Pane Installation Progress" Tesla Gigafactory Texas 10/26/2024 9:35AM
"More Glass Prepped" Tesla Gigafactory Texas. 10/24/2024. 9:12AM
มุมมอง 7Kหลายเดือนก่อน
"More Glass Prepped" Tesla Gigafactory Texas. 10/24/2024. 9:12AM
"Glass Panels Install" Tesla Gigafactory Texas 10/22/2024 10:11AM
มุมมอง 8K2 หลายเดือนก่อน
"Glass Panels Install" Tesla Gigafactory Texas 10/22/2024 10:11AM
"Cooling Towers Comparison" Tesla Gigafactory Texas 10/19/2024 9:17AM
มุมมอง 6K2 หลายเดือนก่อน
"Cooling Towers Comparison" Tesla Gigafactory Texas 10/19/2024 9:17AM
"Good Mix Of Vehicles Departing" Tesla Gigafactory Texas 10/17/2024 9:41AM
มุมมอง 6K2 หลายเดือนก่อน
"Good Mix Of Vehicles Departing" Tesla Gigafactory Texas 10/17/2024 9:41AM
"Window Glass Arrive" Tesla Gigafactory Texas 10/15/2024 9:40AM
มุมมอง 9K2 หลายเดือนก่อน
"Window Glass Arrive" Tesla Gigafactory Texas 10/15/2024 9:40AM
"Well Oiled Machine" Tesla Gigafactory Texas 10/12/2024 9:13Am
มุมมอง 6K2 หลายเดือนก่อน
"Well Oiled Machine" Tesla Gigafactory Texas 10/12/2024 9:13Am

ความคิดเห็น

  • @BTSflyer
    @BTSflyer 14 ชั่วโมงที่ผ่านมา

    For full frame video go here: th-cam.com/video/oJMj58X9Edk/w-d-xo.html

  • @thegrisakgroup
    @thegrisakgroup วันที่ผ่านมา

    Thank you California for being so inept you ran off the greatest businessman of our time and forced him to move to Texas. Signed, a Proud Native Texan!

  • @MrFoxRobert
    @MrFoxRobert วันที่ผ่านมา

    👋👍

  • @andreandre1051
    @andreandre1051 วันที่ผ่านมา

    Merci👍👍👍

  • @budgetaudiophilelife-long5461
    @budgetaudiophilelife-long5461 วันที่ผ่านมา

    THANKS BRAD 👍⚡️⚡️⚡️

  • @BlazerRox
    @BlazerRox วันที่ผ่านมา

    03:29 I wonder why such a large median on that road

    • @jbbuzzable
      @jbbuzzable วันที่ผ่านมา

      I don't know what their reason is, but it would be safer.

    • @eclecticmemes
      @eclecticmemes 11 ชั่วโมงที่ผ่านมา

      I've noticed that often large medians are painted when the road is built for 4 lanes, but only two lanes needed for the foreseeable future.

  • @DavidJohnson-tv2nn
    @DavidJohnson-tv2nn วันที่ผ่านมา

    F TH-cam AND ITS COMMENT DELETING ALGORITHM

  • @bobbysuazjFhvcfgh
    @bobbysuazjFhvcfgh วันที่ผ่านมา

    Every single car loading lane has leaks from diesel trucks 😂😂

    • @Mattanimus
      @Mattanimus วันที่ผ่านมา

      Not just from the diesel semi, the hydraulics on the trailers are leaking also.

    • @lylestavast7652
      @lylestavast7652 วันที่ผ่านมา

      I really thought they'd be using eSemi about a year ago as a trialing source for product shakeout... there's a lot of local movement of vehicles that would seem to be well within range of even a 300mi model

    • @memrjohnno
      @memrjohnno วันที่ผ่านมา

      @@lylestavast7652 100%

    • @memrjohnno
      @memrjohnno วันที่ผ่านมา

      Residual water dripping out after being showered in the EOL facility?

  • @rtz549
    @rtz549 วันที่ผ่านมา

    What's the steel supports out of the ground at the new mega pack site?

    • @memrjohnno
      @memrjohnno วันที่ผ่านมา

      Screw/auger piles. See Dessie's post above 10:23

  • @memrjohnno
    @memrjohnno วันที่ผ่านมา

    Another bright day mate. What sort of speed could a CT reach from a standing start to west side tunnel exit?

  • @DessieDoolan
    @DessieDoolan วันที่ผ่านมา

    Thanks Brad. *Sort by Newest First or Top Comments if only the first few lines are visible* 2:45. Battery, west. Top left. Long view. Cranes not visible. Must be laying down. Top right from about 6:25, 8:19 also. 3:18. Westside, new project. Seems a shaft is to be constructed here to launch a ‘microtunnelling’ TBM under the river. There is a current permit for the ‘Giga Texas Wastewater Interceptor’ project. Address is south of the river, mentions minimum 25’ 7.5m diameter shaft, and max 7’ 2.m diameter tunnel. Presumably this north side is a mirror of those features. Some information coincidentally shown on the Sand Hill Lateral Pipeline Extension documents. 4:24. Westside, Tunnel Project. MotherTruck. Bottom right. Some roof panels fixed. I think I see screws. 9:53. Temporary Switchyard site. If this is a BESS, the method of construction differs from the existing BESS. 10:23. Temporary Switchyard site. Left stack of screw/auger piles. 10:55. Battery, roof. No obvious visible change that would require such a large crane. Nothing of note hoisted onto the roof. 11:18. Casting, north. Apron. Right. Pavement demolished in front of the triplet of doors. Rebar placed. 11:27. Casting, diagonal corner. Apron. Pavement demolished in front of the drive-through door. 12:29. Battery, roof. Top right. Lot of people at the south of Battery. Top left 12:37 also. 13:33. Northend. Casting storage. Yellow caution tape around 6 Cybertruck front castings.

    • @memrjohnno
      @memrjohnno วันที่ผ่านมา

      Perhaps the roof work has been delayed for a few days because of projected bad weather. That being said, the size of the crane would have to be excessive for the job. Wonder how the DBE 4680s are doing because its been radio silence for months now. RoboCyberTaxiCab will be LFP which makes sense given likely very high number of charge cycles but not heard what the McQ will use.

    • @DessieDoolan
      @DessieDoolan วันที่ผ่านมา

      @@memrjohnno Yes, excessively large crane to lift rolls of roofing membrane. Something else being lifted well eastwards, hence the long fly. 8 squat columns on the roof are there to receive some bit of plant. DBE 4680s. Controversially, I don't think much is known at all about the production lines for 4680s. We've been watching equipment being shifted in, and sometimes shifted out, for years now. Levels 3 and 4 on the east side of Battery still appear to be either in the dark, or fitted with construction lighting only.

    • @memrjohnno
      @memrjohnno วันที่ผ่านมา

      @@DessieDoolan The present Cybercell is good though nothing to write home about and even then would cost a bomb if or when not made at scale. Drew left last April and around that time Elon also suggested that the whole 4680 plan would go out the window if DBE wasn't solved by year end.

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn วันที่ผ่านมา

      3:18 "minimum 25’ 7.5m diameter shaft, and max 7’ 2.m diameter tunnel" Is that information in the permit? The information I have from the gas pipeline documentation says 5' for the pipe diameter. I assume that is inside diameter. You're info may be more accurate if it is from the current permit.

    • @DessieDoolan
      @DessieDoolan วันที่ผ่านมา

      @@DavidJohnson-tv2nn 3:18. On the CofA site, Permit 2022 183586 SP. In the folder attachments there's a bunch of documents. U0, 1, 2, and 3 have varying amounts of useful information. A lot of it is the same information repeated in each update.

  • @benguthrie49
    @benguthrie49 วันที่ผ่านมา

    Thanks Brad

  • @Jeffrey_Bezos_Amazon
    @Jeffrey_Bezos_Amazon วันที่ผ่านมา

    Good job

  • @DavidJohnson-tv2nn
    @DavidJohnson-tv2nn วันที่ผ่านมา

    Thanks Brad! New tunnel/Giga Texas Offsite Wastewater Interceptor project: @ 3:14 Based on a permit found by Frank and other Information spotted by Dessie..... The round circle in the gravel is where a vertical TBM shaft will likely be excavated. There will likely be a shaft on each side of the river. A small TBM will be lowered in one shaft to the proper depth, bore a tunnel under the river and be recovered in the other shaft. The wastewater interceptor will be a 5' diameter pipe. Running parallel to, and slightly east of the gas pipeline. Depth is unknown at this point, but the gas pipeline is about 85 - 90 feet deep at River road. While the wastewater interceptor has nothing to do with the gas pipeline... The gas pipeline documentation shows the location of other utilities and future projects. It shows the interceptor line running from the location of the southbound offramp, on the other side of the river, and heading north to about the location of the Cybertruck tunnel. Of course, this is just partial information shown on one page, not the full extent of the project. Substation expansion project: @ 8:52 Conductors have been pulled between the A-frame towers. New Megapack site: @ 9:54 Screw piles driven down the middle. Another stack of piles @ 10:22 (Upper left).

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn วันที่ผ่านมา

      3:14 For those who have a copy of the gas pipeline documentation... The wastewater interceptor is shown on sheets 19, 21 and 48. Sheet 19 being the important one. 9:54 Just a wild guess at this point, subject to being totally wrong..... The screw piles down the middle may be to support a medium voltage bus structure to collect power from the Megapack transformers. It wouldn't look very nice but would be cheaper than excavating trenches for duct-banks. Hope I'm wrong on this one.

    • @Gig0Surf
      @Gig0Surf วันที่ผ่านมา

      @@DavidJohnson-tv2nn Looking back to Jun 2023, they also used screwpiles building the bus/switch/transformer structure for the existing megapack yard; seems consistent. With the change in orientation, I was wondering if the megapacks will be installed in the rectangle formed east of there over to and including the cleared space by the main concrete plant? (which would require more dirtwork!?) or if we'll see the welcome center relocated!?

    • @Gig0Surf
      @Gig0Surf วันที่ผ่านมา

      For the wastewater, are we expecting perhaps a ring of secant piles to depth with a concrete ring at the top for stability? Or will this be a permanent vertical shaft, concrete lined as well?

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn วันที่ผ่านมา

      @@Gig0Surf Wastewater... I don't see that many ring forms for a complete concrete shaft. Unless they bring in more? Plus I'm guessing the shaft is temporary. But unfortunately, we simply don't have enough information yet. The shaft can be constructed from secant piles, sheet piles, concrete, or other means, and we don't know the depth either. Hopefully David Salisbury is following this and can chime in and help us out.

    • @memrjohnno
      @memrjohnno วันที่ผ่านมา

      @@Gig0SurfIf they can aid in local grid stabilisation by flattening the demand curve AND sell 'excess' back to the grid with autobidder then may as well install a shi*load.

  • @BTSflyer
    @BTSflyer วันที่ผ่านมา

    Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4

  • @davec2211
    @davec2211 วันที่ผ่านมา

    Very interesting video Dave! Thanks for researching and sharing, amazing what people read and trust in the press, thank goodness for people like you that filter the junk and FUD that these sponsored publications produce! I do my own research and you provide a diverse and factual source of information as part of it! With a hint of humour and kindness - take care

  • @roncolson7305
    @roncolson7305 2 วันที่ผ่านมา

    Interesting that they are leveling out the area between the tunnel and the trailer yard. Will they have trucks use that newly paved stretch of road to access the WOW yard?

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn 2 วันที่ผ่านมา

      Unless those trailers are empty, the elevation of the WOW yard should be raised for flood protection. Which doesn't appear to be happening now. What they are doing @ 5:25 is simple straightening out the embankment. The WOW yard is still at a lower elevation.

  • @transylvanianvistas
    @transylvanianvistas 3 วันที่ผ่านมา

    Great drone footage and amazing views. Thanks for sharing. 👍👍👍

  • @paolo5977
    @paolo5977 3 วันที่ผ่านมา

    Cybercab at 3:40!

  • @MrFoxRobert
    @MrFoxRobert 3 วันที่ผ่านมา

    👋👍

  • @karubemanabu3268
    @karubemanabu3268 3 วันที่ผ่านมา

    There are still no Christmas decorations😅

    • @pauldelrossi2582
      @pauldelrossi2582 3 วันที่ผ่านมา

      The Grinch stole all the Christmas decorations and brought them to Goiga Berlin!

  • @Backseatobserver0075
    @Backseatobserver0075 3 วันที่ผ่านมา

    There doesn't seem to be enough lanes going into the final inspection shed, seem to be struggling now just imagine when things get busy, the back log of cars waiting for entry will be huge, what re your thoughts

  • @mytikiroom
    @mytikiroom 3 วันที่ผ่านมา

    Nice shots!

  • @PM_82
    @PM_82 3 วันที่ผ่านมา

    Why still the facination with the cooling tower, it is done, it is operationg and cooling, Imho there is no need to continue to focus on it and zoom in for the same shot like last time.

    • @BTSflyer
      @BTSflyer 3 วันที่ผ่านมา

      Well one could say that about the whole video. Not much changes there day to day. Once all the glass is put in there will be nothing new to see. My advice is to watch one video per week.

    • @sammyk874
      @sammyk874 3 วันที่ผ่านมา

      If you hold down the mouse on the video it will fast forward 2x.

    • @PM_82
      @PM_82 3 วันที่ผ่านมา

      @@BTSflyer Still like the video's and the changes/progess made ( have been watching Jeff's video almost from day 1 ) but i am specificly talking about the shot at @4:16 . with the wide angle shots there is much to see/notice but dont know what is the point or the facination of that particular shot as is add nothing to the progress. Fot instance when the parking garage was finished you stopped flying around it every time and you dont visit the cathode factory every time since that was done. I understand showing it when it first operated but its done now.

    • @stephenj6837
      @stephenj6837 2 วันที่ผ่านมา

      @@PM_82Watching Jeff’s videos? That moron doesn’t fly anymore and when he does it’s a preprogrammed route! If you don’t like the hard work Brad puts into three days a week every week I suggest you just stop watching or at the least fast forward!

    • @PM_82
      @PM_82 2 วันที่ผ่านมา

      @@stephenj6837 Just calm down a bit oke, i know i can skip it or FF , i asked him what the facination with the cooling tower is to make a zoom like that. Imho it does not add anything to the video, If some say that they would like to see it in every video i would indeed just skip it but if nobody want to watch it why add it in. The reference to Jeff is related to the timeframe that i have been watching the video's, not the quality of way it is filmed. Why are people so afraid of any critiques or questions about or too brad, is he so infallible or something ? It is almost like i beat up a nine year old girl or something.

  • @DessieDoolan
    @DessieDoolan 3 วันที่ผ่านมา

    Thanks Brad. *Sort by Newest First or Top Comments if only the first few lines are visible* 0:26. GA, Level 3. Glazing. Left. 2 glazing units removed and replaced with black panels. Busted unit still in place. 0:48. GA, loading platform. Steel and rebar deliveries on the platform, on trailers on the road. 1:00. Southend, west. Gravel path. Pair of pump units. 3:26. Stamping, apron. Top left. Huge wooden crate. Southend, east. Apron. Truck load of gravel poised to enter. A hole to be filled. 4:37. Westside, Tunnel Project. MotherTruck. Some roof sheets attached. 5:38. River Road, west. Northside. New project. @ItsLilRobs found the contractor is Ward and Burke, an Irish multinational contractor. Inner and outer formwork for a tank or a well. Another deep wet-well project? @Frank-gt7me found a permit current for a ‘Giga Texas offsite wastewater interceptor’. Zip code in the site address is south of the river, but likely all part of this project, and probably part of the ‘Giga Water Loop’ project. Circle of gravel cleared for assembly of the tank/well. Segments of circular bases. Curious. Bottom. Against the fence. Rebar cages for bored piers. Smaller circular forms against the fence. Construx (a formwork contractor) has a youtube channel featuring a Ward and Burke construction project in Blanchardstown, Dublin. Similar gear seen in that video. 6:10. River road, west. Second large wooden crate on a trailer. 15:29. Temporary Switchyard site. Bottom. Concrete encased ductbank suspended from the steel beam spanning across the excavation. 15:41. Temporary Switchyard site. Stack of auger/screw piles. A search of the data-base for screw pile use in the existing BESS shows screw piles only used in the BESS switchyard, and for the small control building. 15:53. Temporary Switchyard site. Excavator with a screw-head attachment. Auger/screw piles beside. 16:44. Switchyard/Substation. Linesmen installing the new conductors across the A-frames.

    • @benguthrie49
      @benguthrie49 3 วันที่ผ่านมา

      Dessie, do you think the temporary switchyard site will be extended south now that the excavation there is finished?

    • @DessieDoolan
      @DessieDoolan 3 วันที่ผ่านมา

      @@benguthrie49 15:41. I think that's it. There was signage placed on all 4 corners about a week ago that I took to be a demarcation point. 1 visible a little north of the stormwater drain riser at 15:41. The other 2 on the north corners at 15:55. Do you do Wordle Ben?

    • @benguthrie49
      @benguthrie49 3 วันที่ผ่านมา

      @@DessieDoolan on occasion. I haven't for a while. why? btw, I usually started with adieu

    • @DessieDoolan
      @DessieDoolan 3 วันที่ผ่านมา

      @@benguthrie49 Had a feeling you'd be a wordler, or a lapsed wordler as it turns out. After 955 games, I finally got a 1! A couple of weeks ago I read somewhere that a 'scone' followed up by 'trial' were the best starting words. I started with scone for about a week, then switched to other words starting with sco, typed in 'scowl' 3 days ago and much to my surprise I got it! Adieu was my starting word also for ages. Then just for the heck of it, bingo.

    • @benguthrie49
      @benguthrie49 3 วันที่ผ่านมา

      @@DessieDoolan what did you try second? I liked following adieu with thong. Are you saying you hit on your first guess?

  • @lylestavast7652
    @lylestavast7652 3 วันที่ผ่านมา

    Thanks Brad - Best Wishes for the Holiday down there :)

  • @ismailnyeyusof3520
    @ismailnyeyusof3520 3 วันที่ผ่านมา

    Thanks Brad

  • @bigtvjunky9119
    @bigtvjunky9119 3 วันที่ผ่านมา

    The new Megapacks might be on the way from the Lathrop plant. A large number of them (150-200?) are no longer on their outbound lot. Do we know how many are expected based on the number of new transformers now on site? My guess was a minimum 160 based on 80 transformers, but are there more?

  • @DavidJohnson-tv2nn
    @DavidJohnson-tv2nn 3 วันที่ผ่านมา

    EOL landscaping: @ 7:02 Mostly gravel added to the existing concrete. Do they not like trees and green plants? Supercharger canopies: @ 8:54 Sure hope these are temporary.

    • @Bill_N_ATX
      @Bill_N_ATX 3 วันที่ผ่านมา

      7:02 it’s the wrong time of the year to be planting things. We don’t have much of a winter here in Central Texas but we are about to start it. Be dumb to plant things then they die in freeze before they get a chance to root in etc. So let’s see what happens in February or so. Fall is the best time but early spring is next best. The worst is summer, due to heat and lack of rain.

    • @sammyk874
      @sammyk874 3 วันที่ผ่านมา

      Looks like it may be outdoor seating. Isn't that a cafeteria in there? Why temporary? What's wrong with them?

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn 2 วันที่ผ่านมา

      @@Bill_N_ATX You have a good point about winter, which I overlooked. But my point is the amount of concrete and gravel. With little space left for future landscaping. And this is a problem all around the sight. It seems like the only things that have been properly landscaped after 4 years are the north parking lot, a small outdoor break area north of the main entrance, and the main entrance. In my opinion... Something is just not right here. Am I wrong?

  • @stephenreeves21
    @stephenreeves21 3 วันที่ผ่านมา

    Thanks Brad! Things are rocking, rolling, and making great progress! Stay on it! Cheers

  • @Jeffrey_Bezos_Amazon
    @Jeffrey_Bezos_Amazon 3 วันที่ผ่านมา

    Good job, Brad Sloan

  • @DavidJohnson-tv2nn
    @DavidJohnson-tv2nn 3 วันที่ผ่านมา

    Thanks Brad! New Megapack site: @ 15:40 and 15:53 Screw piles? Mega-vault: @ 16:08 (Bottom left) Conduit in trench for a short duct-bank that goes under the fence. This will bring medium voltage power from the substation into the vault and the new switchgear building. Substation expansion project: @ 16:46, and 16:56 to 17:14 Pulling wire between the A-frame towers.

  • @tashi282
    @tashi282 3 วันที่ผ่านมา

    Tesla needs to ship more cars here in Colorado-inventory is disappearing so fast-while NYC has many with huge discount.

  • @memrjohnno
    @memrjohnno 3 วันที่ผ่านมา

    Model Q or Quasi - Apparently but not really; seemingly:

  • @andreandre1051
    @andreandre1051 3 วันที่ผ่านมา

    Merci👍👍👍

  • @robkeshav800
    @robkeshav800 3 วันที่ผ่านมา

    Great video Brad. Thank you for your regular updates.

  • @benguthrie49
    @benguthrie49 3 วันที่ผ่านมา

    Thanks Brad

  • @BTSflyer
    @BTSflyer 3 วันที่ผ่านมา

    Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4

  • @bikerdude2941
    @bikerdude2941 4 วันที่ผ่านมา

    The homeless gonna have a field day with those

  • @miguelbarba3380
    @miguelbarba3380 4 วันที่ผ่านมา

    What about the environment building those monstrosity

  • @RoySATX
    @RoySATX 4 วันที่ผ่านมา

    Tesla Giga Factory, SpaceX Starship Starbase, the amount of industry taking place in TEXAS by just two of Musk's companies is astounding! ⭐

    • @BTSflyer
      @BTSflyer 4 วันที่ผ่านมา

      You left out Neurolink tool

    • @thegrisakgroup
      @thegrisakgroup วันที่ผ่านมา

      Yep, thank you, California!

  • @Scaliad
    @Scaliad 4 วันที่ผ่านมา

    Elon doesn't do anything small ..

  • @RedRouge-j4j
    @RedRouge-j4j 5 วันที่ผ่านมา

    "Canopies For Superchargers" because the NACS connector can't be cooled like the cable and the sun gets hot in Southern Texas at times. And the supercharger would slow down if the NACS gets hot. And it does.

    • @BTSflyer
      @BTSflyer 4 วันที่ผ่านมา

      At times, in the Summer all the time. LOL.

  • @andreandre1051
    @andreandre1051 5 วันที่ผ่านมา

    Merci👍👍👍

  • @rockheadregolith8325
    @rockheadregolith8325 5 วันที่ผ่านมา

    Thank God for mute button...

    • @BTSflyer
      @BTSflyer 5 วันที่ผ่านมา

      What! You don't like copyright free music, oh the horror.

    • @Frank-gt7me
      @Frank-gt7me 5 วันที่ผ่านมา

      @@BTSflyer I bet if you posted a silent video someone would complain about that too. I can’t understand why people that don’t like the music don’t just mute the video and play their own.

  • @dadtablet2092
    @dadtablet2092 5 วันที่ผ่านมา

    Diggin' the fog.

  • @DessieDoolan
    @DessieDoolan 5 วันที่ผ่านมา

    Thanks Brad. *Sort by Newest First or Top Comments if only the first few lines are visible* 0:25. Southend, east diagonal corner. Glazing unit installed. 2:14. Southend, east diagonal. Apron. Each of the black counterweights is 1000kg, a bit over or a bit under either of the tons. 2:52. Southend, south. Upper terrace. Excavator. Early, hasn’t been paved yet. 3:49. Southend, west. Apron. Asphalt paving works. Concrete contractor ready to do some work. Maybe on east-west vehicle passageway where the excavator is scratching around. 4:23. Westside, Tunnel Project. MotherTruck frame being painted. 5:02. River Road, west. Northside. New project. Inner and outer formwork for a tank or a well. Another deep wet-well project? I wonder if a de-watering system will be needed here also during construction, leading to years of misinterpretation about the purpose of the project. Possibly the first stage of getting the drainage ditch out of the way for additional highway works. 6:47. GA, Model Y exit. Lidar equipped Model 3. Doing a U turn, or mapping out a self driving route for Model Ys. 6:55. GA, highway side. Apron. Asphalt paving works around the vault. May have been some additional cables run. 7:24. EOL, north. Paving? Was marked BS during the set-out. 9:05. EOL, Superchargers. Shade sails installed. Unfinished post installation on the north side shows that the auger/screws piles don’t appear to have been utilised. 11:49. Switchyard/substation. MegaVault. Left. 3rd controls building installed. 12:36. Temporary switchyard site. Permit current for ‘LCRA Switchyard Expansion and BESS Yard’. 13:42. Casting, east. Apron. Follow that forklift towing the trailer! I think this is how the dies are shifted between here and the Die Shop. First time it has been seen moved in weeks.

    • @ItsLilRobs
      @ItsLilRobs 5 วันที่ผ่านมา

      7:24 I believe that is some sort of underlayment for gravel to be placed on. They used something similar around the main entrance and the outdoor cafeteria

    • @DessieDoolan
      @DessieDoolan 5 วันที่ผ่านมา

      @@ItsLilRobs 7:24. Thanks. I couldn't find anything via a search. In a recent video, I thought there were those perforated pavers laid that grass or plants can grow through, but it was in fact Joe's photos from Friday showing a close up. And yes you are correct, in that photo it looks like some some of underlayment or a course geo-mesh.

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn 5 วันที่ผ่านมา

      5:02 Frank found a permit on the Austin site for... 'Giga Texas offsite wastewater interceptor' 2024-157105 EV It is a recent permit.

    • @DessieDoolan
      @DessieDoolan 5 วันที่ผ่านมา

      @@DavidJohnson-tv2nn 5:02. I just looked that one up. I wonder what his search criteria was? I couldn't find anything. The zip code for that address is south of the river. So it seems to be a cross river project. Wastewater, I guess this means sanitary sewer. Another force main across to the wastewater treatment plant I would guess.

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn 5 วันที่ผ่านมา

      @@DessieDoolan I couldn't find it either without entering the permit number. I agree the address seems to be across the river on Texas 130 Service Road, Southbound

  • @benguthrie49
    @benguthrie49 5 วันที่ผ่านมา

    Thanks Brad. Looks like a lot happened in the last 24 hours.

  • @AMXhotrod
    @AMXhotrod 5 วันที่ผ่านมา

    Tesla sales continue to plummet and their head Genius built a flat roof in Texas... $50 says it starts leaking within the year....

  • @markdav61
    @markdav61 5 วันที่ผ่านมา

    Great tunes. Kinda Texas twangy.