"Active West Side" Tesla Gigafactory Texas 4/25/2024 9:48AM
The west side was buzzing with activity today. Plenty of cybertrucks and Model Ys being loaded onto carriers. Some work on the Megapacks. Lots of work going on the south end.
Please Like and Subscribe to this channel. Click the bell for notifications.
Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4
#Tesla #Gigafactory #Texas #Austin #Model Y #Cybertruck #Family #Kids #Children #Construction #DumpTrucks, #Scrapers, #Excavators
มุมมอง: 9 969

วีดีโอ

"Cybertrucks Thinning Out" Tesla Gigafactory Texas 4/23/2024 9:35AM
มุมมอง 9K7 ชั่วโมงที่ผ่านมา
Overall Cybertrucks with the loose throttle peddle covers have been fixed and are being shipped out. More glass for the south building extension. Prufrock it back to tunneling again. Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4 #Tesla #Gigafactory #Texas #Austin #Model...
"Delayed Cybertrucks Numbers Down"
มุมมอง 15K14 ชั่วโมงที่ผ่านมา
The over all numbers of Cybertrucks that are backed up on the west side has been reduce some with many being shipped out each day. Framing of the south end extension continues. Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4 #Tesla #Gigafactory #Texas #Austin #Model Y #Cy...
"Cybertrucks Shipping Out" Tesla Gigafactory Texas. 4/18/2024 9:20AM
มุมมอง 12K19 ชั่วโมงที่ผ่านมา
The number of stacked up Cybertrucks has been reduce a small amount with lot more ready to go. Glass installation continues on the south end extension. Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4 #Tesla #Gigafactory #Texas #Austin #Model Y #Cybertruck #Family #Kids #C...
"Cybertrucks All Backed Up" Tesla Gigafactory Texas 4/16/2024 10:10AM
มุมมอง 27Kวันที่ผ่านมา
Cybertrucks are really stacking up on the west side due to a issue with part. Prufrock still drilling under the highway. Conduit is being laid down just south of the switchyard. More glass going up on the south end extension. Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A...
"Cybertrucks Overwhelming" Tesla Gigafactory Texas 4/13/2024 9:53AM
มุมมอง 21Kวันที่ผ่านมา
The. mystery is why so many Cybertrucks are not shipping out promptly but, stacking up on the west side. All Cybertrucks on the east side. South end construction continues with the framing around the tanks. Prufrock doesn't seems to be drilling at the moment. Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/don...
"Model Y Production Slow" Tesla Gigafactory Texas 4/11/2024 9:46AM
มุมมอง 10K14 วันที่ผ่านมา
There were no Model Ys in the east side charging and inspection lot. Plenty of Cybertrucks on the east side and west side of the Gigafactory. There is some work going on with the mega packs. Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4 #Tesla #Gigafactory #Texas #Austi...
"Many Cybertrucks Few Model Ys" Tesla Gigafactory Texas 4/6/2024 9:04AM
มุมมอง 13K14 วันที่ผ่านมา
Over on the east side charging and inspection lot it was all Cybertrucks and no Model Ys. Prufrock is a little deeper today in its tunneling. Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4 #Tesla #Gigafactory #Texas #Austin #Model Y #Cybertruck #Family #Kids #Children #C...
"Prufrock Inches Forward" Tesla Gigafactory Texas 4/4/2024 9:37AM
มุมมอง 13K21 วันที่ผ่านมา
Prufrock appears to have moved forward some. Still plenty of Cybertrucks parked ready to be shipped out. The inspection and charging lot on the east side is still being used. Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4 #Tesla #Gigafactory #Texas #Austin #Model Y #Cybe...
"Tunneling Getting Closer" Tesla Gigafactory Texas 4/2/2024 9:39AM
มุมมอง 10K21 วันที่ผ่านมา
For information on Kalshi Event Trading use the link www.Kalshi.com/bradsloan Ground in front of the drill is being cleared and prepped for tunneling. More car carriers today. Production seem a little slower than with the end of the quarter push. For information on Kalshi Event Trading use the link www.Kalshi.com/bradsloan Please Like and Subscribe to this channel. Click the bell for notificati...
"Cybertruck Wash Time" Tesla Gigafactory Texas 3/30/2024 9:49AM
มุมมอง 11K21 วันที่ผ่านมา
Gigafactory Texas is a dusty place and Cybertrucks need a wash, check it out. Much calmer day with less car carriers hauling off vehicle to the rail yard. For information on Kalshi Event Trading use the link www.Kalshi.com/bradsloan Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVF...
"Cybertrucks, Cybertrucks, Cybertrucks" Tesla Gigafactory Texas 3/28/2024 9:23AM
มุมมอง 24K28 วันที่ผ่านมา
"Cybertrucks, Cybertrucks, Cybertrucks" Tesla Gigafactory Texas 3/28/2024 9:23AM
"Last Week End Of Quarter" Tesla Gigafactory Texas 3/26/24 9:34AM
มุมมอง 9Kหลายเดือนก่อน
"Last Week End Of Quarter" Tesla Gigafactory Texas 3/26/24 9:34AM
"Cybertrucks Dominate Shipping" Tesla Gigafactory Texas 3/23/2024 9:30AM
มุมมอง 14Kหลายเดือนก่อน
"Cybertrucks Dominate Shipping" Tesla Gigafactory Texas 3/23/2024 9:30AM
"Overflowing with Cybertrucks" Tesla Gigafactory Texas. 3/21/2024 12:59PM
มุมมอง 17Kหลายเดือนก่อน
"Overflowing with Cybertrucks" Tesla Gigafactory Texas. 3/21/2024 12:59PM
"Cybertrucks Ready To Ship" Tesla Gigafactory Texas 3/19/2024 9:00AM
มุมมอง 11Kหลายเดือนก่อน
"Cybertrucks Ready To Ship" Tesla Gigafactory Texas 3/19/2024 9:00AM
"Into The Mist" Tesla Gigafactory Texas 3/16/2024 10:27Am
มุมมอง 10Kหลายเดือนก่อน
"Into The Mist" Tesla Gigafactory Texas 3/16/2024 10:27Am
"End Of The Quarter Push" Tesla Gigafactory Texas 3/14/2024 9:27AM
มุมมอง 11Kหลายเดือนก่อน
"End Of The Quarter Push" Tesla Gigafactory Texas 3/14/2024 9:27AM
"Superchargers Energized" Tesla Gigafactory Texas 3/12/2024 9:51AM
มุมมอง 12Kหลายเดือนก่อน
"Superchargers Energized" Tesla Gigafactory Texas 3/12/2024 9:51AM
"Megapack Switches Closed" Tesla Gigafactory Texas 3/9/2024 9:50AM
มุมมอง 9Kหลายเดือนก่อน
"Megapack Switches Closed" Tesla Gigafactory Texas 3/9/2024 9:50AM
"More Glass Installed" Tesla Gigafactory Texas 3/7/2024 8:36AM
มุมมอง 11Kหลายเดือนก่อน
"More Glass Installed" Tesla Gigafactory Texas 3/7/2024 8:36AM
"Cybertrucks Aplenty" Tesla Gigafactory Texas 3/5/2024 9:48AM
มุมมอง 11Kหลายเดือนก่อน
"Cybertrucks Aplenty" Tesla Gigafactory Texas 3/5/2024 9:48AM
"Saturday Update" Tesla Gigafactory Update 3/2/2024 9:27AM
มุมมอง 11Kหลายเดือนก่อน
"Saturday Update" Tesla Gigafactory Update 3/2/2024 9:27AM
"Operational Update" Tesla Gigafactory Texas 2/29/2024 8:38AM
มุมมอง 10Kหลายเดือนก่อน
"Operational Update" Tesla Gigafactory Texas 2/29/2024 8:38AM
"Supercharger Preps" Tesla Gigafactory Texas 2/27/2024 10:17Am
มุมมอง 11Kหลายเดือนก่อน
"Supercharger Preps" Tesla Gigafactory Texas 2/27/2024 10:17Am
"Busy Day At The Carrier Lot" Tesla Gigafactory Texas 2/24/2024 9:18AM
มุมมอง 13K2 หลายเดือนก่อน
"Busy Day At The Carrier Lot" Tesla Gigafactory Texas 2/24/2024 9:18AM
"Cybertruck Output Increase" Tesla Gigafactory Texas 2/22/2024 9:19AM
มุมมอง 12K2 หลายเดือนก่อน
"Cybertruck Output Increase" Tesla Gigafactory Texas 2/22/2024 9:19AM
"Gigafactory Texas Update" Tesla Gigafactory Texas 2/20/2024 9:32AM
มุมมอง 12K2 หลายเดือนก่อน
"Gigafactory Texas Update" Tesla Gigafactory Texas 2/20/2024 9:32AM
"Cybertruck Loading" Tesla Gigafactory Texas 2/17/2024 10:06AM
มุมมอง 12K2 หลายเดือนก่อน
"Cybertruck Loading" Tesla Gigafactory Texas 2/17/2024 10:06AM
"Boring Machine Setup" Tesla Gigafactory Texas 2/15/2024 9:30AM
มุมมอง 10K2 หลายเดือนก่อน
"Boring Machine Setup" Tesla Gigafactory Texas 2/15/2024 9:30AM

ความคิดเห็น

  • @vitorazinheira1739
    @vitorazinheira1739 ชั่วโมงที่ผ่านมา

    waste a money

  • @AMeierhoefer
    @AMeierhoefer 2 ชั่วโมงที่ผ่านมา

    Why does teh parking structure not have a solar roof?

  • @Chris-yt1nu
    @Chris-yt1nu 7 ชั่วโมงที่ผ่านมา

    F-150

  • @palmtreeshenanigans
    @palmtreeshenanigans 8 ชั่วโมงที่ผ่านมา

    Southend new structure, I believe could be a fire station, The overhang sort of gives it away, there should be another level for admin restrooms, sleeping areas, training, spares storage and canteen, then a level with water tanks. Probably wrong, but the overhang is not a real functional piece of the building other than to protect people from rain or rain ingress into the structure. Could also be a part of the boring tunnel around the building to transport workers, look how close it is to the parking structure. So it could be a station and the north-east and west where they are removing concrete from the slab could be where different stations are, possibly being placed with lifts down to the tunnel. Might also be for materials transport around the site, but I would take a wild guess it is for workers as it is so close to the parking structure. If the new structure to the north-east of the building gets similar construction, similar pilings, then I think the cat is out of the bag. Or it could be for both staff and materials transport. I believe if we see some gantry construction materials then it will be almost guaranteed as boring tunnel stations, I always wondered why they would only build a few hundred meters of tunnel from one side of the free way to the other, it would have been much more cost-effective to build a bridge. It took months to prepare the boring machine and get it working, why waste that with only a few hundred meters of tunnel when it now being set up could travel all over the site at not much more cost other than materials. My two cents worth.

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn 7 ชั่วโมงที่ผ่านมา

      The most cost effective approach is to not waste money on a tunnel. The guy who owns the place claims that self driving is "just around the corner". Of course, he's been claiming that every year since 2015! If there were any truth to what he says, there would be no need for a tunnel. The vehicles would be able to drive themselves to the other side. Personally, I don't see any practical use for 12' tunnels anywhere. Except perhaps pedestrians or to carry utilities. As for transporting workers around the site.... Buses are far cheaper and more efficient. Just my opinion on Boring company tunnels.

  • @sewasewa6585
    @sewasewa6585 9 ชั่วโมงที่ผ่านมา

    The amount of tunnelling can be metered by how far the bottom of cassette rollers move up. Then they will reset by putting another segment from the spare belt that is on the girder. The cassette makes it possible for reach to be infinitely variable without any slack. That's my guess.

  • @palmtreeshenanigans
    @palmtreeshenanigans 9 ชั่วโมงที่ผ่านมา

    If you look at the cassette for the coveter belt it is rather easy to see how far the boring tunnel has advanced, I think they have used three of the vertical conveyor segments, determine how long each segment is from top to bottom x by 3, and you will be roughly in the ballpark of how far they have bored. I think about 150 meters so far, roughly.

  • @user-xp1ym9ru6x
    @user-xp1ym9ru6x 13 ชั่วโมงที่ผ่านมา

    Völlig überraschend wird immer noch das Megapacks repariert …

  • @user-qy8xl6wo2u
    @user-qy8xl6wo2u 16 ชั่วโมงที่ผ่านมา

    With that many sitting around could it be their having trouble finding enough morons to buy them???

  • @andreandre1051
    @andreandre1051 16 ชั่วโมงที่ผ่านมา

    Merci👍👍👍

  • @davidsalisbury50
    @davidsalisbury50 16 ชั่วโมงที่ผ่านมา

    Prufrock tunnel. Approx 240 stacks of 3x segments on site. Enough for 180m of tunnel. Still at least 40+m worth of segments to deliver.

  • @MrFoxRobert
    @MrFoxRobert 16 ชั่วโมงที่ผ่านมา

    Thank you!

  • @lasvegasbound6167
    @lasvegasbound6167 18 ชั่วโมงที่ผ่านมา

    Saw a new Model 'Y' in my grocery store lot today. OMG, how beautiful it is in blue. Very impressive. I was actually embarrassed for my own ICE car. lol But, I don't think I could ever give up a Model 'Y' to become a robotaxi. It's too beautiful to 'put out on the street'. lol

  • @DIOSpeedDemon
    @DIOSpeedDemon 19 ชั่วโมงที่ผ่านมา

    We need this type of building and manufacturing, ALL over America. We should build EVERYTHING, and Import Nothing. I had no idea how big Elons dream, really is. What kind of drone camera did you use, and can a person buy one off the Rack? Great Footage, My Respects, RH DSD

    • @BTSloan70
      @BTSloan70 19 ชั่วโมงที่ผ่านมา

      I use a DJI Mavic 3 Classic.

    • @shazam6274
      @shazam6274 14 ชั่วโมงที่ผ่านมา

      @@BTSloan70 About the same price as a Tyler Mount...seat cushion! 🤣

  • @jaym9846
    @jaym9846 20 ชั่วโมงที่ผ่านมา

    The music in fantastic.

  • @cleanenvironment8121
    @cleanenvironment8121 20 ชั่วโมงที่ผ่านมา

    Look at all those gas and diesel trucks and tractors building that place

    • @BTSloan70
      @BTSloan70 19 ชั่วโมงที่ผ่านมา

      Only now are companies like Caterpillar getting into electric earthmoving machines.

    • @davidsalisbury50
      @davidsalisbury50 16 ชั่วโมงที่ผ่านมา

      @@BTSloan70 Electric crawler cranes and piling equipment are becoming more common, as they tend to stand in one place for extended periods. Tunnelling and mining have been using electric and electric/hybrid machinery for decades.

  • @DessieDoolan
    @DessieDoolan 21 ชั่วโมงที่ผ่านมา

    Thanks Brad 0:46. Southend, east corner. Gensets either side of the corner. 1:17. Southend. New Structure. There goes the bridge crane idea. Formwork in place for what will evidently be a roof. Maybe a central hoist suspended under. Once some rebar is placed it will be more obvious what is going on here. Formwork overhangs the columns by around 2m 7’. 2:21. Windtunnel. Cybertruck parked. 3:02. BIW, roof. Right. Angular cowls fitted. Some mesh decking installed. Left. Stamping, roof. Behind the parapet wall. Frame for Roof Pipework Project being installed. 3:25 also. Will need to go up and over the stairwell structure, or a stair will need to be installed over. Similiar to those at 4:39 to the right. 4:07. Southend, inside. Retaining wall. Still not obvious to me what the purpose of the wall is. Tunnel alignment (not necessarily the tunnel) is to the right. Southend, roof. Steel decking. Pairs of the red roof drain inlets in place. Finished membrane, inlets marked with a red circle. 4:45. Southend, west. Apron. Replacement lid for the Sanitary Sewer deep well. Larger door opening seems to be the difference. Low-loader parked. 5:00. Southend west, inside. Black band around the base of the raised column pedestals. May have reached the finished grade for the fill. 5:12. Southend west, inside. Retaining wall footing. Likely at the location where the floor grade changes. Far right. Inside. Yellow plastic membrane laid. 5:38. Westside, storage. Bottom right. Roll-up door, rolled out. 7:19. Westside, Tunnel Project. Left. Spoil in the spoil pit. TBM operational. 13:32. Temporary switchyard area. Bottom left. Loading up some beer money. Bottom. Transition between concrete and steel stormwater drain has been encased in concrete. 13:40. Tesla Road. North. Vacuum/suction excavation exploratory trenches. Ductbank/s coming through here. 14:44. Casting, diagonal corner. Apron. Vault lid removed. Pavement demolition underway. Angled line of trench visible. Left. Road. Black chainwire mesh fence being erected. 14:55. Casting, diagonal corner. Apron. Right of the blue bins. Heat affected materials, likely out of one of the furnaces. Possibility that one of the old furnaces is being demolished, or some maintenance work perhaps. Better view in Joe’s photos. 15:21. Casting east. Apron. Crane set up to remove the saw-cut wall panel segments of a new door opening. 15:40. MM Batch plant. Right. Truck backed up to one of the wash-out pits.

    • @zacadams7070
      @zacadams7070 19 ชั่วโมงที่ผ่านมา

      Hey Dessie! 14:19 looks like the Alimak from the tall platform has been removed and they might be removing the one from the next platform. Not sure if this has been pointed out before or not!

    • @DessieDoolan
      @DessieDoolan 19 ชั่วโมงที่ผ่านมา

      @@zacadams7070 14:19 Well spotted! A quick check of Joe's video shows it was gone yesterday.

    • @eclecticmemes
      @eclecticmemes 3 ชั่วโมงที่ผ่านมา

      7:19 Didn't our resident tunnel expert expect the downtime to add the TBM segments to be weeks? Seems like it's only been 3 or 4 days! I wonder if he's impressed?

    • @DessieDoolan
      @DessieDoolan ชั่วโมงที่ผ่านมา

      @@eclecticmemes 7:19. One to two weeks from memory. Seems it was a week.

  • @hansperlich7839
    @hansperlich7839 22 ชั่วโมงที่ผ่านมา

    It would be interesting if you were able to zoom in on that mystery structure that has some concrete for 2:36 ms I'd like to get a close look at those.

    • @DessieDoolan
      @DessieDoolan 21 ชั่วโมงที่ผ่านมา

      2:36. Which structure?

  • @tashi282
    @tashi282 22 ชั่วโมงที่ผ่านมา

    auto industry tails in between once all the vehicles from Tesla will have 48v & SBW.

  • @davefroman4700
    @davefroman4700 22 ชั่วโมงที่ผ่านมา

    Looks like they hired a new carrier company. Don't recall seeing all those green car haulers before.

  • @memrjohnno
    @memrjohnno 22 ชั่วโมงที่ผ่านมา

    Cheers as always.

  • @ourv9603
    @ourv9603 23 ชั่วโมงที่ผ่านมา

    Yesterday, there was a white SUV on top of the parking garage which tells us that the parking garage is at least partially able for vehicles to drive up thru all the floors to the roof. It wont be much longer before employees will be parking in it. I'm taking bets on June 1st. !

    • @jeffcarlton3590
      @jeffcarlton3590 21 ชั่วโมงที่ผ่านมา

      I will bet by mid-May for the west half.

    • @d.stamand
      @d.stamand 21 ชั่วโมงที่ผ่านมา

      next week

  • @DavidJohnson-tv2nn
    @DavidJohnson-tv2nn 23 ชั่วโมงที่ผ่านมา

    Thanks Brad! Concrete project by the easement: @ 1:16 It will be interesting to see how open the top deck will be once they start laying rebar. Parking garage: @ 2:41 (Bottom right), 2:46 (Bottom right), and 2:55 (Bottom left) All vault covers on the vaults. Electrical work likely done for now. New power supply to the factory: @ 14:46 (Right, by the building) Vault cover removed. Excavator removing sections of the slab around the vaults. These vaults may have to be reworked. There are only 8 conduits going into the building from each vault. The new duct-banks contain 12 conduits each! @ 13:18 Ongoing work to construct new duct-banks, duct-banks connected to the vaults. @ 13:26 (Bottom) New vaults ready to be placed. @ 13:32 (Bottom) Stormwater pipe finally competed after demolishing part of the old duct-bank from the temporary substation. Loading cable from demolished duct-bank onto trailer. @ 13:40 (Bottom) Appears to have been some hydrovac excavation along the duct-bank alignment.

    • @michaeljohnson1805
      @michaeljohnson1805 18 ชั่วโมงที่ผ่านมา

      Mr Johnson I am not an expert on electricity….how much electricity is that going to be with 12 conduits? I can’t imagine the cost of all that electricity! BTW I just wanted to say that I find your comments on the construction of the power to the factory interesting. Even though as someone that doesn’t understand most of what you are talking about!

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn 10 ชั่วโมงที่ผ่านมา

      @@michaeljohnson1805Thanks. I have some knowledge of this stuff but I'm not an expert. But we do have electrical experts on here who can chime in and correct me if I make a mistake. Calculating power in this case is an estimate. Because to calculate power you have to know the voltage and the current carrying capacity of the cables. From the interconnection agreement, we do know the voltage. Which is 24.9 kV (24,900 volts). However, we don't know the exact current carrying capacity of the cables. Each of those conduits caries a 3 phase circuit with 3 cables. I can give you a guess or estimate of perhaps 10 megawatts per conduit? Again, the experts can jump in if my estimate is high or low. Here is another comparison that may help... Currently the factory is served by two duct-banks with 8 conduits each. With only 7 conduits in each duct-bank actually being used. So the new duct-banks will have 150% more capacity than the existing duct-banks to the factory. One more clarification..... While there are two existing main power duct-banks, and.... Two new duct-banks being constructed.... In other words there are actually 24 conduits being added. We count only 12 because the system is designed to be redundant. So they can shut down one duct-bank for service without interrupting factory operations. By the way, that redundancy starts at the transmission lines, extends all the way through the substation, and the duct-banks to the factory.

    • @michaeljohnson1805
      @michaeljohnson1805 9 ชั่วโมงที่ผ่านมา

      @@DavidJohnson-tv2nn thanks

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn 7 ชั่วโมงที่ผ่านมา

      @@michaeljohnson1805 You're welcome! And if there is anything else you have questions about, I will try to answer. If I can't due to lack of knowledge, I'm sure someone else here can.

  • @pfcrow
    @pfcrow 23 ชั่วโมงที่ผ่านมา

    8:02 It looks to me like the bottom of the belt cassette is raised half-way, so they've used up half the spare conveyer belt. As the boring machine digs farther into the tunnel, a longer belt is needed to convey the dirt out, so the cassette slowly raises as the machine goes forward. When they run out, they'll attach the spool positioned above the belt, extending the length, and lowering the cassette back down to store the excess until it's needed. I figure you can estimate the distance they've dug by multiplying the height they've raised the cassette by the number of belt switchbacks in the cassette, but I'm bad at that sort of spacial estimation, so I won't guess a number. [Or at least that's my understanding of the process; if I got anything wrong, please let me know.]

    • @davidsalisbury50
      @davidsalisbury50 22 ชั่วโมงที่ผ่านมา

      Restarted tunnelling. One ring advanced. Belt cassette is 26 falls so distance white beam climbs x 26 is the tunnel advance.

    • @pfcrow
      @pfcrow 22 ชั่วโมงที่ผ่านมา

      @@davidsalisbury50 Is it 26 up and down? So 52x? That's what I thought I saw.

    • @davidsalisbury50
      @davidsalisbury50 22 ชั่วโมงที่ผ่านมา

      I made it 26 up and down, but remember the belt in the tunnel goes in and out. So 1m tunnel requires 2m belt. Hence 26x

    • @michaeljohnson1805
      @michaeljohnson1805 21 ชั่วโมงที่ผ่านมา

      ⁠@@davidsalisbury50 I assume the boring machine continues with a downward angle and at some point will level off and then begin to angle up. What keeps the belt from touching the walls and the ceiling of the tunnel when the cutter begins to rise?

    • @davidsalisbury50
      @davidsalisbury50 20 ชั่วโมงที่ผ่านมา

      I’m no expert on conveyors but I have seen them going round curves (large radius) and on slow vertical curves. This is handled by having rollers at the sides and on top at the edges respectively. The conveyed material runs in the centre so small rollers on top at the sides of the belt should do it.

  • @pfcrow
    @pfcrow 23 ชั่วโมงที่ผ่านมา

    I count 159 Cybertrucks in the east lot, but I may be off by one or two.

    • @pfcrow
      @pfcrow 23 ชั่วโมงที่ผ่านมา

      On the east side, it's roughly three full rows to make one hundred.

    • @lylestavast7652
      @lylestavast7652 22 ชั่วโมงที่ผ่านมา

      easy 300 in the west fix-hold lot.

  • @Mrbfgray
    @Mrbfgray 23 ชั่วโมงที่ผ่านมา

    That's literally LOTS of "Ferraris". (referencing some Wall St. pundit predicting the CT would sell as many as an exotic sports car)

    • @palmtreeshenanigans
      @palmtreeshenanigans 8 ชั่วโมงที่ผ่านมา

      I think the Cybertrucks will sell, but they will hit a wall when sales tumble, just as they have for the s and x. I don't believe there is much demand once the first million or so are sold. In my humble opinion the Cybertruck is really a status symbol, it gets attention wherever it is seen, and mostly the first buyers were popular social media or famous singers and actors.

  • @ohtoah
    @ohtoah 23 ชั่วโมงที่ผ่านมา

    I am addicted to watching this daily, please keep it up. Joe is screwing up, his head has gotten to big.

    • @BTSloan70
      @BTSloan70 22 ชั่วโมงที่ผ่านมา

      I just try to keep it simple. The image is everything.

    • @davevornberger
      @davevornberger 21 ชั่วโมงที่ผ่านมา

      @@BTSloan70 Plus, you put on some good music tracks. Today's are great. Where did you get these from?

    • @BTSloan70
      @BTSloan70 21 ชั่วโมงที่ผ่านมา

      @@davevornberger TH-cam music library

    • @Bill_N_ATX
      @Bill_N_ATX 17 ชั่วโมงที่ผ่านมา

      @@davevornberger Indeed the track that started at around 5:30 had my toes going. I remember dancing to EDM with good DJs, and hitting the club at midnight and dancing till past dawn. Now, I’m doing good to make it till 10 before hitting the bed.

  • @TECTUSolarEnergy
    @TECTUSolarEnergy 23 ชั่วโมงที่ผ่านมา

    First like!

  • @BTSloan70
    @BTSloan70 23 ชั่วโมงที่ผ่านมา

    Please Like and Subscribe to this channel. Click the bell for notifications. Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4

    • @timboatfield
      @timboatfield 22 ชั่วโมงที่ผ่านมา

      🤔 Sometime i get a nostalgia for your original style of fix position watching. It is great to see an overview, but it's good to watch a process for a bit to get a sample of the doing that is going on, the real people, digging a ditch or laying roofing. It makes you feel more present on site and connected with the people and activities. Plus, watching other people work is very relaxing.

  • @LAP1050
    @LAP1050 วันที่ผ่านมา

    They sure are fuggly. Are they all the same color. Are all those machines and dump trucks EV?

  • @emilianogabriel9613
    @emilianogabriel9613 วันที่ผ่านมา

    What happening inside Tesla too many people lose job or quit

  • @robertmaxwell3548
    @robertmaxwell3548 วันที่ผ่านมา

    I want a Red one!

  • @robertmaxwell3548
    @robertmaxwell3548 วันที่ผ่านมา

    Texas Bumper Cars for the Fair!

  • @robertmaxwell3548
    @robertmaxwell3548 วันที่ผ่านมา

    better Ship that Crap before it gets Hot in Texas, the Grid will Crash charging these Crappy Wanna be Trucks!

  • @robertmaxwell3548
    @robertmaxwell3548 วันที่ผ่านมา

    Texans Don’t buy kids toys.

  • @laqutis
    @laqutis วันที่ผ่านมา

    If the entire parking lot were full, that would be a ''backup'''.

  • @canisdeumnox4925
    @canisdeumnox4925 2 วันที่ผ่านมา

    Class action CT lawsuit. How could such dangerous flaws be allowed for sale.

  • @andreandre1051
    @andreandre1051 2 วันที่ผ่านมา

    Merci👍👍👍

  • @DukesofHazzard.
    @DukesofHazzard. 2 วันที่ผ่านมา

    Gas for life❤

  • @wg_gomes
    @wg_gomes 2 วันที่ผ่านมา

    Bye bye, bye bye California.....

  • @williammccoy7127
    @williammccoy7127 2 วันที่ผ่านมา

    Sorry Ellon but this thing is simply to ugly ,I would not have this square shoebox of a car.

  • @user-xp1ym9ru6x
    @user-xp1ym9ru6x 2 วันที่ผ่านมา

    Ohne, schon wieder Reparaturen am Megapacks! Am Besten - Abreißen.

  • @MrFoxRobert
    @MrFoxRobert 2 วันที่ผ่านมา

    Thank you!

  • @larryparrish7780
    @larryparrish7780 2 วันที่ผ่านมา

    Brad, have you seen where the spoils from the tunnel are being deposited?

    • @BTSloan70
      @BTSloan70 2 วันที่ผ่านมา

      no idea.

    • @DessieDoolan
      @DessieDoolan 2 วันที่ผ่านมา

      9:28. Off screen to the left. A large dump trucks seen dumping there in Brad's 11 April video at 8.43 In Airwave Dynamics video from 19 April, a dump truck with a load of spoil from the TBM is seen turning towards that location. 4.49 in that video. Not a lot to go on, but no where else on site seems to getting earth dumped. Certainly not going off site in those massive dump trucks.

  • @ohtoah
    @ohtoah 2 วันที่ผ่านมา

    You are the best drone in Gigga, TX. Nice work *******

  • @CS-hd9xu
    @CS-hd9xu 2 วันที่ผ่านมา

    I think they are just giving these EV's out to liberals to drive so people see them and feel guilty for driving our SUV's. I have 327,000 miles on my 2002 Tahoe, let's see if ANY EV can do that

    • @BTSloan70
      @BTSloan70 2 วันที่ผ่านมา

      You do know that Elon is a right wing conservative, right? Why are you injecting politics to this? Soooooo, check this link out to answer your last question:www.digitaltrends.com/cars/tesla-electric-cars-surpass-300000-miles-in-shuttle-service/

  • @DessieDoolan
    @DessieDoolan 2 วันที่ผ่านมา

    Thanks Brad. 0:31. Southend west. Inside. Level 1. Putting up the shuttering for the retaining wall that dog-legs away to the east. Raised floor level in this area will benefit the ramped access to the tunnel portal. Ramp can be half the length. Tunnel useful height 10’, floor elevated 4 to 5’. 1:08. Southend south. Apron. Gazebos being placed over the suction lifting rigs. They have been keeping these undercover when not in use. 1:47. Southend east. New Structure. Bottom. Making up rebar cages for beams. How things change in 24 hours. Staging (red scaffold like items) erected for beams to be constructed on top of. Bridge crane idea looking shaky. Roof, shaky. Might be a structure for chiller plant after all. 2:59. Old EOL staging yard. Tent removed. 3:13. Parking Garage. Top deck. Left. Parking stall line marking. BIW. Apron. Right. Green pumps in amongst the temporary chillers. 4:13. Southend. Roof. Insulation boards being placed. Bottom. Puzzled by the angled board between roof and fire separation wall. 5:26. Westside. Tunnel Project. Final back-up deck installed. The MPVs loaded with the tunnel segments likely being used to restrain the back-up decks as they are being let into the tunnel. Good view in one of Joe’s photos of the 2 MPVs and a back-up deck all chained together. Ventilation ducted fan shifted into place. 6:05. Westside. Tunnel Project. Bottom right. Sign on the Fence. ‘The Boring Company. Tunneling site. Tesla Gigafactory Austin TX’. 12:03. Tesla road, north. Easement. Stormwater drain being completed across where the original ductbank from the Temporary Switchyard has been demolished. Stack of conduit and cable, bottom right. 12:48 also. 13:34. Northend. Road. Bottom left. Pavement being cored for fence post installation. 13:44. Casting diagonal corner. Apron. Pavement saw-cut/marked for cutting for trenches and a vault. 15:37. Far north east. Along the fence line top right, and along the road (Gilbert Road) top left. Pipeline works. Works for a sanitary sewer force main were permitted here 18 months ago. 16:46, 16:54 also. 16:00. Far north storage. Bottom left. Pair of cyclonic filters or similar.

    • @eclecticmemes
      @eclecticmemes 2 วันที่ผ่านมา

      1:47 Yeah, I saw the structure looking like some sort of reinforced vault or pedestal and thought, Oh, there goes the offload steel coil theory...... remaining theories are as you suggested chiller plant or my latest off the wall theory, a passive energy storage (heat) facility.....

    • @DessieDoolan
      @DessieDoolan 2 วันที่ผ่านมา

      @@eclecticmemes 1:47. Yep, it pays to be flexible! Should be obvious by Joe's flight tomorrow if it's a roof, or open structure. Leaning towards open structure, but poised to spring to roof, or even back to bridge crane if required.😬 Interesting watching the progress of the various retaining walls inside. Wasn't expecting those on the west at 0:31.

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn 2 วันที่ผ่านมา

      Just noticed... @ 12:41 (Left) Four cable spools on a truck.

    • @nihongobenkyoshimasu3190
      @nihongobenkyoshimasu3190 2 วันที่ผ่านมา

      5:22 The orange tube is now connected to the yellow soft air vent to provide fresh air into the tunel.

    • @DessieDoolan
      @DessieDoolan 2 วันที่ผ่านมา

      @@nihongobenkyoshimasu3190 5:22. Thanks! I saw that in Brad's video. Airwave Dynamics has their video out also. Not much change since Brad flew over earlier.

  • @royal4021
    @royal4021 2 วันที่ผ่านมา

    Some of your best work yet Brad. Crystal clear views all around.

  • @steevee1945
    @steevee1945 2 วันที่ผ่านมา

    Good eye on the new construction on the East side.

    • @cs.8821
      @cs.8821 2 วันที่ผ่านมา

      What is the east side suppose to be?

    • @BTSloan70
      @BTSloan70 2 วันที่ผ่านมา

      It is really the Norh side. The east side is the river.

    • @cs.8821
      @cs.8821 2 วันที่ผ่านมา

      What's up with all of thae glass? Are they going to be building car or use it for office space

  • @DavidJohnson-tv2nn
    @DavidJohnson-tv2nn 2 วันที่ผ่านมา

    South end: @ 0:37 and 1:00 Grade inside being raised to the tops of the column pedestals. Concrete project near the easement: 1:49 (Bottom) Scaffolding being placed. Appears that there will be a large concrete deck supported by the columns. To the right... Tesla road extension. Parking garage: @ 3:14 Top deck striped for parking spaces. South end: @ 4:10 Laying insulating panels on the roof.

    • @Bill_N_ATX
      @Bill_N_ATX 2 วันที่ผ่านมา

      @ 3:14 There are also light stanchions in place. First time I’ve noticed them, doesn’t mean they weren’t there before.

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn 2 วันที่ผ่านมา

      @@Bill_N_ATX Good catch! If you mean the light poles, I don't recall seeing them before either. Coverage hasn't been great in the past week because Joe had other things to do. The concrete bases, which are basically the tops of columns have been there but blend in with the concrete top deck.

  • @hardernl8893
    @hardernl8893 2 วันที่ผ่านมา

    from 14:57 onwards: the Utility platform and its immediate environment next to Cathode looks reasonably tidy. Left over carton, woods, pieces of cable etc have been collected. This is a major change really, never seen before. Hopefully this is a sign that construction work is finished and a proper operations regime has started. As I write this there is no mention (yet?) of the Cathode Factory in the ongoing Shareholders mtg but we could make a reasonable guess if for instance cryogenics are loaded in the storage vessels anytime soon.

    • @DessieDoolan
      @DessieDoolan 2 วันที่ผ่านมา

      September 2022 when the steel showed up for the plant platform. Long time coming!

    • @BTSloan70
      @BTSloan70 วันที่ผ่านมา

      One source reported that the Cathode plant was behind schedule.

    • @hardernl8893
      @hardernl8893 วันที่ผ่านมา

      @@BTSloan70 Agree, Brad! In fact it is an understatement if I recall that at the April 2023 Shareholders Q&A the erstwhile director Drew mentioned that "trial runs would begin next Quarter". Maybe some aspects of a cathode materials production line could have be tested, but nothing substantive happens there without the key utilities being available: electricity, NG, cooling cycles, dry air and Oxygen/Nitrogen perhaps also Argon and we all have seen how long that has been dragged on. Then there was a late design change when these utilities were also connected to the adjacent Die Shop (the pipelines under the road). But most importantly (just my own interpretation) is that the bottom has fallen out from under the internationally traded Lithium supply, mainly in the form of Spodumene, SC6. The financial incentives for setting up a company-owned Lithium supply route may have evaporated in the time following the April'23 announcement. Still, the IRA rules may provide some incentive for home made batteries, but I don't know in how far that involves the mentioned Lithium supplies & -processing. The most definitive sign of Action that I can suggest is loading liquid Oxygen in the storage vessels. That is related to necessary calcination steps. So far all the evaporators are at ambient temperature - no icing whatsoever has been noted and neither a visit by a supply truck. For completeness sake I may also add that the Cathode factory was originally intended for " Nickel Chemistries". Maybe the bulk Nickel-chemistries approach (requiring Cathode) may have been victim of a paradigm shift towards other chemistries. Then the Cathode setup may be (partially-) outdated even before trial production.