ไม่สามารถเล่นวิดีโอนี้
ขออภัยในความไม่สะดวก

Fresh Concrete Tests|ASTM C31/C39/C172/C1611/C231/C1064|

แชร์
ฝัง
  • เผยแพร่เมื่อ 16 ส.ค. 2024

ความคิดเห็น • 24

  • @2iconstructions918
    @2iconstructions918  ปีที่แล้ว +2

    References:
    SAES-Q-100
    SATIP-Q-001-01 Ready Mix Concrete Batch Plants and 3rd Party Laboratory Management
    SAIC-Q-1009 Cast-in-Place Ready Mix Concrete Receiving Inspection
    SAIC-Q-1010 Cast In Place Concrete PumpsTransit Mixer Inspection
    SAIC-Q-1004 Fresh Concrete Sampling & Testing Inspection @ The Batch Plants
    09-SAMSS-097 & ASTM C94
    All ready-mix concrete are delivered to the site with a batch ticket listing the following:
    Name of the ready-mix company,
    Location of Batch Plant
    Serial number of the ticket, date, truck number
    Name of purchaser
    Name of the job and location,
    Job Order (JO) Number for Project
    Saudi Aramco mix design number
    Amount of concrete in cubic meters (or yards)
    Time of loading, if wet mix
    Reading of the revolution counter at the first addition of water
    Type, brand & amount of cement, silica fume & admixture
    Source and Total Amount of Mixing Water
    Maximum Size of Aggregate
    Mass of fine and course aggregate
    Time Leaving Batch Plant
    Signature or initials of producer's representative
    Ready mix concrete delivered in trucks not having operable revolution counters shall be rejected.
    Concrete shall be discharged from the mixer within 90 minutes or before the drum has revolved 300 revolutions, whichever comes first after the introduction of mixing water to the cement & aggregates or introduction of cement to the aggregates.
    Concrete delivered at a temperature in excess of 35°C or that fails to maintain a temperature of 35°C until used, shall be rejected. (Except Non- structural concrete)

  • @dkutman7
    @dkutman7 ปีที่แล้ว +2

    بہُت ہی زبردست ویڈیو۔ بہُت بہُت شُکریہ۔ اس طرح کی پریکٹیکل ویڈیو اپلوڈ کر لیا کرے❤

  • @studentlife6989
    @studentlife6989 ปีที่แล้ว +2

    ماشاءاللہ keep it up bro

  • @hamadofficialchannel5596
    @hamadofficialchannel5596 หลายเดือนก่อน +1

    Good information sir g

  • @rashidhussain6182
    @rashidhussain6182 ปีที่แล้ว +2

    Very Nice

  • @hamadofficialchannel5596
    @hamadofficialchannel5596 หลายเดือนก่อน +1

    Very nice

  • @abduljabbar-bg9bi
    @abduljabbar-bg9bi 9 หลายเดือนก่อน +1

    Good job sir

  • @abdurrehman925
    @abdurrehman925 ปีที่แล้ว +2

    Please continue Bro

  • @2iconstructions918
    @2iconstructions918  ปีที่แล้ว +1

    Concrete delivered at a temperature in excess of 35°C or that fails to maintain a temperature of 35°C until used, shall be rejected and replaced at the expense of the Manufacturer. Commentary Note: Non-structural concrete with compressive strength of 2000 psi is exempt from the above requirement. The reason for this exemption is due to the fact that non-structural concrete is unreinforced and thus cracking is not critical.
    Air content test (if required by the project specifications) shall be made with a frequency of not less than one test for every 115m3 of concrete on each day, or 1 test for each class of concrete delivered. (ASTM C94-09, Sec. 17.5)
    The minimum required number of concrete test cylinders for strength tests in accordance with ASTM C39/C39M shall be: a) Test one set of laboratory-cured specimens at 7 days and one set of specimens at 28 days b) Test one set of field-cured specimens at 7 days and one set of specimens at 28 days.

    • @abuzarkhan4966
      @abuzarkhan4966 ปีที่แล้ว

      Please make video of Documents need for inspection of RFI(attachment with checklist )

    • @2iconstructions918
      @2iconstructions918  ปีที่แล้ว

      @@abuzarkhan4966 kindly check the descriptions of last few videos.. I have already mentioned related SATIP, SAIC AND SAES...

    • @abuzarkhan4966
      @abuzarkhan4966 ปีที่แล้ว

      @@2iconstructions918 thank you brother but my question is for supposed I have inspection of rebar(coated). What documents I need to attach with RFI checklist

    • @dkutman7
      @dkutman7 ปีที่แล้ว

      From which website you shared this information????

    • @2iconstructions918
      @2iconstructions918  ปีที่แล้ว +1

      @@dkutman7 Not from a Website particularly, the data has been collected from different sources. Especially from aramco standards

  • @mahammedsafwan9000
    @mahammedsafwan9000 ปีที่แล้ว +3

    If flow test value come 680
    What we have to do

    • @2iconstructions918
      @2iconstructions918  ปีที่แล้ว

      If you have enough number of revolution left.. rotate your TM a bit more for tightening your concrete slump value.. otherwise you may reject your concrete.. loose slump value means more workable-means more water cement ratio-means low strength ..

  • @mohammadkashifshaikh9674
    @mohammadkashifshaikh9674 ปีที่แล้ว +2

    Saudi ka

  • @abuzarkhan4966
    @abuzarkhan4966 ปีที่แล้ว +1

    Brother please tell me ,1 MINUTE me kitna revolution max krna chaye RMC truck ko

    • @2iconstructions918
      @2iconstructions918  ปีที่แล้ว

      Concrete shall be discharged from the mixer within 90 minutes or before the drum has revolved 300 revolutions, whichever comes first after the introduction of mixing water to the cement & aggregates or introduction of cement to the aggregates.
      You can check further details from first 2comments or from the video descriptions..
      Thank you for your comment 🙂🙂

    • @2iconstructions918
      @2iconstructions918  ปีที่แล้ว

      6-8 RPM

    • @abuzarkhan4966
      @abuzarkhan4966 ปีที่แล้ว

      @@2iconstructions918 is it according to aramco Standard?

    • @2iconstructions918
      @2iconstructions918  ปีที่แล้ว

      @@abuzarkhan4966 yes

    • @rashidhussain6182
      @rashidhussain6182 ปีที่แล้ว +1

      @2iconstructions918 What is the minimum temperature of concrete. ?
      What is the minimum & maximum ambient temperature of Concrete for Saudi Aramco project. ?

  • @mohammadkashifshaikh9674
    @mohammadkashifshaikh9674 ปีที่แล้ว +2

    Assalamu alaikum bhai aapka number milega kya