  • MASS CONCRETE:
    Any placement of concrete designated in the contract documents as mass concrete or any placement of structural concrete with a minimum dimension equal to or greater than 1 ,200 mm should be considered mass concrete unless otherwise specified in contract documents and shall comply with ACI 301-16, Section 8.
    SAES-Q-001
    Mass Concrete |Pashto Audio|SAES-Q-001 & ACI 301| #aramco
    • Mass Concrete |Pashto ...
    For further details
    Watch following vedios in urdu language:
    Mass Concrete 01 |SAES Q 001, ACI 301 & ACI 211| #aramco
    • Mass Concrete 01 |SAES...
    Mass Concrete 02 |Method of Statemen, Thermal Control Plan| |SAES Q 001, ACI 301& ACI 211| #aramco
    • Mass Concrete 02 |Met...
    Your Quarries:
    mass concrete
    mass concrete cooling system
    mass concrete construction
    heat in mass concrete
    mass concrete heat of hydration
    mass concrete heat control
    mass concrete as per aci code
    civil engineering
    what is mass concrete
    civil engineering basic knowledge
    mass concrete quality control
    how to control mass concrete quality
    construction quality
    qa/qc in construction
    quality control
    temperature control concrete,

ความคิดเห็น • 27

  • @subhashbiswas6961
    @subhashbiswas6961 4 หลายเดือนก่อน +2

    Very Informative. Thanks for sharing.

  • @jasimKhan-wu6bc
    @jasimKhan-wu6bc หลายเดือนก่อน

  • @muhammadarslan252
    @muhammadarslan252 ปีที่แล้ว +1

    Very useful information about mass concrete.

  • @Thetimes__
    @Thetimes__ 11 หลายเดือนก่อน +1

    Masha Allah nice presentation 👍

  • @UmarTaimoor-lc8tf
    @UmarTaimoor-lc8tf 2 หลายเดือนก่อน +1

    Zabardast Informative Video da Engr... Thank you Allah Am Khushala sata o rogh Sehat sara... Da taso che kam Slide or Note use kare de video ke nu da taso share kawale shy ya na.😃

    • @2iconstructions918
      @2iconstructions918  2 หลายเดือนก่อน

      Shukerya rora . Mail waka on 2iconstructionz@gmail.com.

  • @vinod2773
    @vinod2773 ปีที่แล้ว +1

    Thanks Brother

  • @fazalhaq4672
    @fazalhaq4672 ปีที่แล้ว

    ACI state 3.1 after placement of concrete shall not exceed 70 c, not during the concrete pouring time.

  • @gaziradr5145
    @gaziradr5145 ปีที่แล้ว

    Dear can you share the MS document?

    • @2iconstructions918
      @2iconstructions918  ปีที่แล้ว

      Every project has there own projects specifications and their own method of statement.. so you can check from your team.. I am sorry to not providing these documents in your personal email...

  • @dreamscomestrueforme
    @dreamscomestrueforme 6 หลายเดือนก่อน +1

    😂maximum temperature difference mentioned in your method statement is 35 farenheit or 19 degree celcius......actually 35 farenheit is right, but it is only 1.7 degree celcius only....not 19 degree Celsius.......we can consider temperature difference in mass concrete while curing period is about 2 to 3 max....degree Celsius........did your consultant approved this 19 degree Celsius????....
    Woowww you are a lucky contractor man....great

    • @2iconstructions918
      @2iconstructions918  6 หลายเดือนก่อน

      Thank you for your message and concern. Yes, there is a mistake in that particular sentence. You are requested to check Section 3.1 and Section 6 for the correct information.
      The correct value for temperature variations is 19°C, as mentioned in the standards for Mass concrete. It has already been mentioned two to three times in this video. I am requesting you to also correct your information. Thank you.

    • @dreamscomestrueforme
      @dreamscomestrueforme 6 หลายเดือนก่อน

      ​​​@@2iconstructions918 my friend, pls read my comment properly.....
      What i am trying to say is 35 farenheit is not 19 celsius....its just only 1.7 celsius....... and the right answer for thermal difference between surface and core concrete is only just 35 farenheit as per the ACI codes.....formula for farenheit to Celsius is
      (35°F − 32) × 5/9 = 1.667°C,
      (160°F −32)×5/9 =71.111°C
      ...
      I think this MS prepared by just copying and pasting the wrong information which is available from the google......
      from where you got 19 celcius .....????😢😢😢
      Pls just refer ACI -301-20, section 8, for mass concrete and its thermal control differences

    • @2iconstructions918
      @2iconstructions918  6 หลายเดือนก่อน

      @dreamscomestrueforme My very dear brother, if you have ACI 301-20 section 8 temperature limits part 8.1.3 a & b right now, kindly check. And then respond me accordingly..

    • @dreamscomestrueforme
      @dreamscomestrueforme 6 หลายเดือนก่อน +1

      @@2iconstructions918 can you tell me what will be the 35 farenheit in Celsius?

    • @2iconstructions918
      @2iconstructions918  6 หลายเดือนก่อน

      @dreamscomestrueforme
      Acceptance Criteria According to the project specifications which referred to ACI 301 Item 8.1.3 the concrete mix shall meet the following criteria:
      a) Maximum temperature in concrete after placement shall not exceed 70°C.
      b) Maximum temperature difference between the center and the surface of placement shall not exceed 19°C