ASTM C172-19a: Standard Practice for Sampling Freshly Mixed Concrete

แชร์
ฝัง
  • เผยแพร่เมื่อ 30 ก.ค. 2024
  • This presentation reviews the procedures for sampling freshly mixed concrete from various mixer types. This video is helpful in preparing for concrete certification programs.

ความคิดเห็น • 4

  • @reynaldolimbaga7530
    @reynaldolimbaga7530 2 หลายเดือนก่อน

    Thank you for this educative information. Especially for me laboratory work.

  • @jamesmcmurray451
    @jamesmcmurray451 2 ปีที่แล้ว +2

    If the concrete contains course aggregate particles that would be retained on a ___ siev, wet-sieve a sufficient amount of the representative sample over a ___ sieve, as described in practice C172.
    A) 1", 1.5"
    B) 1.5", 2"
    C) 2", 2"
    D) 2", 1.5"
    I have it narrowed down to either A or B, leaning towards A but my book is so faded I can barely read certain sections. Anyone able to help me out?

  • @jesusglopez8430
    @jesusglopez8430 ปีที่แล้ว

    Very Educative and Informative thanks for sharing.

    • @stevenbailey8813
      @stevenbailey8813 11 หลายเดือนก่อน

      Very good video I thought it was comprehensive and gave a lot of good tips do you need