Derailment! Train Picked WRONG Switch Again? MOW Crew At Alter Metal Saves The Day..

แชร์
ฝัง
  • เผยแพร่เมื่อ 17 ม.ค. 2025

ความคิดเห็น • 161

  • @ohgary
    @ohgary หลายเดือนก่อน +7

    51:14…see the crow in the foreground? That railroad is so nearly dead it is attracting scavengers 😏

  • @PeterMarsden-q9s
    @PeterMarsden-q9s หลายเดือนก่อน +2

    That was just great Jason - and watching from the UK, well we don't have anything like your railroads over here, so always enjoy your vids

  • @chuxproductions1090
    @chuxproductions1090 29 วันที่ผ่านมา +2

    I watched this from Facebook first! I Love Your takes on ELS!

  • @CarolYannes
    @CarolYannes 28 วันที่ผ่านมา +3

    Another great looking video. It’s a very interesting railroad operation for good reasons and not.

  • @junebugketterman2809
    @junebugketterman2809 หลายเดือนก่อน +2

    I enjoy watching the video.

  • @ronweiss8529
    @ronweiss8529 หลายเดือนก่อน +2

    Love your videos. This railroad needs to spend some time and cash on improving their rail system.

  • @EvertHarley1
    @EvertHarley1 หลายเดือนก่อน +1

    Thanks Jason for the inside view ! love your vids greatings from the Netherlands

  • @petev.9357
    @petev.9357 หลายเดือนก่อน +7

    I'm betting the the points on the switch are worn and need replaced. The wheels aren't tracking when the switch is thrown. But don't replace it.😉👍

  • @nathanlind2463
    @nathanlind2463 หลายเดือนก่อน +2

    Another great video Jason!

    • @davidmeek3104
      @davidmeek3104 หลายเดือนก่อน

      You know the easiest thing they could do would be to fix the tracks

  • @cmphighpower
    @cmphighpower หลายเดือนก่อน +6

    The Abbot and Costello of railroads

    • @MrNorth69
      @MrNorth69 หลายเดือนก่อน

      No joke

  • @amanderwadsworth-62
    @amanderwadsworth-62 หลายเดือนก่อน +1

    I am from Australia, and I have been looking at your videos for some time. I do like them a lot, so I wish you all the best for Christmas and a happy New Year. Stay safe, and I hope 2025 is going to be better for you.

    • @jasonasselin
      @jasonasselin  หลายเดือนก่อน +1

      Merry Christmas and Happy New Year from the US!

  • @roady1710
    @roady1710 หลายเดือนก่อน +1

    It’s always fun to go to your channel when watching other real fans just watching trains go by pretty cool but go to your channel wow 503 want to use the F word but I’ll just say mess up after mess up always good derail action

  • @garymessina1609
    @garymessina1609 หลายเดือนก่อน +1

    Looks like a broken siding switch great video thanks Jason

  • @kennethfuller8347
    @kennethfuller8347 29 วันที่ผ่านมา +4

    I didn't realize there was room for that many cars back in Alter Metals. And I'm guessing the 3 axle trucks under the SD is why they're having problems at the switch and frog.

    • @jasonasselin
      @jasonasselin  28 วันที่ผ่านมา +1

      15 at times I think.

  • @ihc1963
    @ihc1963 หลายเดือนก่อน +4

    The 2 Yellow metal posts are Radiation detectors.

    • @mshum538
      @mshum538 หลายเดือนก่อน

      @@ihc1963 absurd

  • @joecameron3512
    @joecameron3512 หลายเดือนก่อน +3

    I'm blown away never have I seen a channel with so many derailments seems like they spend more time getting stuff back on the tracks then anything else how do they even make money running this way hopefully that sweet sd9 doesn't get destroyed in a derailment

  • @Carolb66
    @Carolb66 หลายเดือนก่อน +1

    133k subs! Jason congrats. 🎉 dont seem that long you got 100,000 😊

  • @Andrewwr14
    @Andrewwr14 หลายเดือนก่อน +28

    Whenever you lift cars from a customer, you have to test the brakes on the cars to make sure they are working. Otherwise, you can't go track speed. The conductor will ask the engineer for a "set up", in which the engineer moves the train (air) brake handle to Full Setup. The conductor will then walk the cars checking that the piston for the air brakes is sticking out, indicating that the brakes are set. Once he's checked them all, he'll ask the engineer to release the brakes. In this case, the conductor told the engineer to "back up 10 cars for a roll-by release", where the engineer will shove back 10 cars so the conductor can check the pistons again to see if they have now retracted, indicating the brakes have released. He could also do a standing release, where he walks alongside the cars while the train is stationary, if he couldn't back up for some reason (a road crossing behind him, for example).

    • @ejjunkins9740
      @ejjunkins9740 หลายเดือนก่อน +3

      Thanks for the explanation! It helped me understand better

    • @Andrewwr14
      @Andrewwr14 หลายเดือนก่อน +1

      @@ejjunkins9740 You're welcome!

    • @MrNorth69
      @MrNorth69 หลายเดือนก่อน +2

      @@Andrewwr14 Sounds like a Class 2 brake test - the air leakage test

    • @Andrewwr14
      @Andrewwr14 หลายเดือนก่อน +1

      @@MrNorth69 At CN, we call it a 1a brake test. It's more for checking if the brakes set up or not. But you will certainly know if there are any air leaks when you walk the cars.

    • @MrNorth69
      @MrNorth69 หลายเดือนก่อน +1

      @@Andrewwr14 Ah Ok I see what you mean now. I remember doing a few of those. Think BNSF just called im a class 2 or something. Luckily I'm just glued to the engineers seat now

  • @danmathers141
    @danmathers141 หลายเดือนก่อน +1

    I think it would be cool to see Alter's process.

  • @Silvergt333
    @Silvergt333 หลายเดือนก่อน +1

    Good job Jason

  • @mikeashely8198
    @mikeashely8198 หลายเดือนก่อน +8

    I think the railroad needs to buy better duct tape for repairs

  • @jeffbronowicz3264
    @jeffbronowicz3264 หลายเดือนก่อน +1

    Thats exactly what they are!! An Alarm will sound if any cars are hot!

  • @DavidKuschmann-jj6im
    @DavidKuschmann-jj6im หลายเดือนก่อน +1

    Nice horn on 503

    • @roady1710
      @roady1710 หลายเดือนก่อน

      @@DavidKuschmann-jj6im I do agree sounded great

  • @robertgift
    @robertgift หลายเดือนก่อน

    Nice catch and good suspicion! You can get closer as long as not trespassing. Video from the other side of the grade crossing looking down the track to reveal whathey are doing.

  • @wilburroth5150
    @wilburroth5150 หลายเดือนก่อน

    Have fun shoveling!

  • @371508129
    @371508129 หลายเดือนก่อน +3

    Where does Alder metal get all that scrap metal?

  • @DrScotty1965
    @DrScotty1965 หลายเดือนก่อน

    That crazy stalker that you had awhile back would go insane with all the derailments lately. 😅

  • @KB-gs8zi
    @KB-gs8zi หลายเดือนก่อน +1

    Hey Jason !! Wasn't 503 & 501 that derailed on the switch last time ?? Thanks for the video & Have ""HAPPY HOILDAYS "" 🎄🎄🎄🎄🥳🥳🥳🥳👍👍👍👍👍

  • @sc0tte1-416
    @sc0tte1-416 หลายเดือนก่อน +3

    I thought once the cars were disconnected and there was no air in the lines the brakes would be locked up...guess I know nothing lol

    • @JustAGamerA
      @JustAGamerA หลายเดือนก่อน +4

      with 0 air in the car, the brakes release. You have the brake pipe, which is a continuous air line from locomotive to rear car. This is used to fill two reservoirs on each car, an auxiliary and a emergency res. When the engineer applies air brakes, it causes the pressure in the brake pipe to drop below the pressure in the aux reservoir which then applies the brakes on that car. When the train line/ brake pipe separates it goes into emergency, where air from the emergency res puts on the brakes. You can bleed off that emergency application to move cars around without air, which is very common while switching in yards. The air can also leak out over time without any human intervention, which is why we still put handbrakes on cars in emergency.

  • @sc0tte1-416
    @sc0tte1-416 หลายเดือนก่อน +11

    The 3 axle locos should stay off of that switch, they aren't known for being too great at navigating tight radius turns that's why they are mostly used for 'highway'. Guess they just carry around blocks of wood and hope for the best 😂

    • @Jleed989
      @Jleed989 หลายเดือนก่อน +3

      Isn’t that why they usually have buffer cars behind the locos so they don’t have to enter the siding?

    • @erichk1674
      @erichk1674 หลายเดือนก่อน +1

      @@Jleed989that’s my thought too .

    • @MrNorth69
      @MrNorth69 หลายเดือนก่อน +2

      ​​@@Jleed989 Yes usually.. but then again they shouldn't be having any SDs on this track unless it's SD7s or smaller GP38, regardless I think it's time to sell the line to someone who actually knows how to railroad.. these guys are a joke..

    • @Bassotronics
      @Bassotronics หลายเดือนก่อน

      @@MrNorth69
      Get a Big Boy in there.

    • @MrNorth69
      @MrNorth69 หลายเดือนก่อน +1

      ​@@Bassotronics I'd pay money to see that

  • @LundRebel
    @LundRebel หลายเดือนก่อน +2

    That old switch maybe doesn't like the weight of the engine or the wheel configuration. They avoided putting the engine on the switch.???? Enjoyed watching them work it out. Thanx.

    • @Maine_Railfan
      @Maine_Railfan 27 วันที่ผ่านมา +1

      Rotten ties or worn switch components

  • @Ilrogerahall1956
    @Ilrogerahall1956 หลายเดือนก่อน +2

    Roger hall of my vernon Illinois, is watching...

  • @tcm2kd5000
    @tcm2kd5000 หลายเดือนก่อน +2

    The ties are likely rotted and keep pulling up the spikes. Surprisingly, they don't derail more. It looks like the MOW crew has their fingers crossed that the train doesn't derail again.

  • @tonyowen_seagull_guy
    @tonyowen_seagull_guy 15 วันที่ผ่านมา +1

    Hi from...Vancouver Island ;-)

    • @jasonasselin
      @jasonasselin  15 วันที่ผ่านมา

      Thanks for watching!

  • @lynnzi3d
    @lynnzi3d หลายเดือนก่อน

    Looks good

  • @davidballoid2118
    @davidballoid2118 หลายเดือนก่อน +2

    I think someone need to get up there with a roadbed tamper and some fresh ballast.They can drive spikes all day long if they want it's not going to fix the problem.

    • @Maine_Railfan
      @Maine_Railfan 27 วันที่ผ่านมา +1

      Surfacing doesn’t fix rotten ties…

  • @sandyg9228
    @sandyg9228 หลายเดือนก่อน +1

    It was slow as watching paint dry but I couldn’t look away.

  • @jeffbronowicz3264
    @jeffbronowicz3264 หลายเดือนก่อน +1

    Looks like a bicron stand , which is panels that contain scanners for radiation it scans the cars as they pass thru!

  • @suzylarry1
    @suzylarry1 หลายเดือนก่อน +4

    I think it is time that the upper Management should look at maintenance of this rail line. Small as it is , it appears to be going to shambles

    • @thedesertdwellerfromutah4354
      @thedesertdwellerfromutah4354 หลายเดือนก่อน +1

      I'm sure Upper Management is well aware of the lack of maintenance on their rail line but as outrageously expensive as it is to maintain it I'd imagine they're cutting every corner they can.

    • @MrNorth69
      @MrNorth69 หลายเดือนก่อน +2

      Management is the problem.. I've been at BNSF for 20 years.. I've never seen track this bad.. I'm in disbelief they run 390,000 lb engines with 286,000 lb cars on 65 lb per yard jointed stick rail.. what's even worse is they actually have to rent a high rail truck, when trains derail twice a week.. they need to probably call it quits.. and get into the trucking business or something

    • @xyz061220
      @xyz061220 หลายเดือนก่อน +1

      @@MrNorth69 " ... I've never seen track this bad." Napoleon Defiance & Western is getting better, but when they took over from Maumee and Western ... "Worst Railraod Track ever!"

    • @Maine_Railfan
      @Maine_Railfan 27 วันที่ผ่านมา +1

      @@MrNorth69pretty sure most of that stuff is 263k, even then you can get waivers for 286k cars. The rail is heavier than 65 pound. Someone else said it’s in the ballpark of 90-105.
      And you realize class 1’s lease highrails right? CPKC gets all their service trucks, grapple trucks, dump trucks, and a lot of their F-250’s and F-350’s through the same company els does. CSX goes through Danella out of PA for their highrails as well as most of their loaders and excavators. And I think G&W still goes through REALM. It’s stupid for any company to buy trucks outright right now. When the most barebones work trucks start out at $80-100k from the dealer. And that’s before you install radios, highrail gear or any work equipment to them. With how vehicles are made today and how quickly they loose value, it’s smarter to lease them, wait until they drop a significant amount of value and then buy them.

    • @MrNorth69
      @MrNorth69 26 วันที่ผ่านมา

      @Maine_Railfan I do understand class 1s do lease most equipment including railroad equipment such as engines car ect. but in the end this shortline is such a disaster its almost comical

  • @tomdickinson8450
    @tomdickinson8450 หลายเดือนก่อน +1

    Looks a lot like this morning.

  • @johnbeck8812
    @johnbeck8812 หลายเดือนก่อน +1

    Snows disappearing is it spring yet what happened to my winters na and down hill skiing ????

  • @johnwinter8273
    @johnwinter8273 หลายเดือนก่อน +1

    I agree with others, they're not done making repairs. Going north there isn't much chance of picking the points, but southbound they may want to pay close attention to it. But I believe it's Alter Metals responsibility to fix it.

    • @mshum538
      @mshum538 หลายเดือนก่อน

      Railroad’s responsibility is from the clearance point ( usely were the derail is located ) to the switch…

    • @johnwinter8273
      @johnwinter8273 หลายเดือนก่อน +1

      @@mshum538 Thanks for the clarification. I know in some cases the business pays to have the turnout installed. So I thought they were also responsible for repairs. I guess it depends on the original agreement.

  • @richardbause2453
    @richardbause2453 หลายเดือนก่อน +2

    The MOW guy should of got a violation.
    Came down "not" facing the steps😮.

  • @larryesmith5060
    @larryesmith5060 หลายเดือนก่อน +2

    If they have had problems with that switch I would think they would work on it to prevent that again

    • @roady1710
      @roady1710 หลายเดือนก่อน

      I used to call him PM’s but that’s a big word and a lot of work probably too much for the crew. They call it preventative maintenance. What a concept.

    • @MrNorth69
      @MrNorth69 หลายเดือนก่อน

      ​@@roady1710 Maintenance is not in ELSs vocabulary

    • @roady1710
      @roady1710 หลายเดือนก่อน

      @ gotcha

  • @DonaldWashburn-nk9ms
    @DonaldWashburn-nk9ms หลายเดือนก่อน +1

    Time to keep 503 off that switch.

  • @jennifer9947
    @jennifer9947 หลายเดือนก่อน

    Be careful out there Jason

  • @MrBigjimbrown
    @MrBigjimbrown หลายเดือนก่อน +2

    Edmonton Alberta Canada

  • @royreynolds108
    @royreynolds108 หลายเดือนก่อน +2

    Looked like a gauge widening problem on the turnout side. The cars could negotiate it OK, just not the loco.

  • @londonwhaley8690
    @londonwhaley8690 หลายเดือนก่อน

    I enjoyed the video👍👍

  • @TNS17
    @TNS17 17 วันที่ผ่านมา +1

    You know i would think they would get the track fixed at this point. Its not like they would have to pay for it, they would get grants from the government.

  • @lynnzi3d
    @lynnzi3d หลายเดือนก่อน

    Yay 503 🎉🎉

  • @Mike-q2o
    @Mike-q2o หลายเดือนก่อน +4

    That Ford truck is too new to belong to ELS

    • @BudmanPackfan
      @BudmanPackfan หลายเดือนก่อน

      They stole it from Milwaukee Road....

    • @Maine_Railfan
      @Maine_Railfan 27 วันที่ผ่านมา

      It’s leased from Hi-Rail Leasing.

  • @lynnzi3d
    @lynnzi3d หลายเดือนก่อน

    I’m guessing the side track switch was off not allowing 503 to pass on the main line . Possible with them with chains and sledge hammers banging it in. Then 503 pulling so slow with them making sure no derailment occurs

  • @ramtuff2007
    @ramtuff2007 หลายเดือนก่อน

    good train video

  • @eugenekleis4235
    @eugenekleis4235 หลายเดือนก่อน +1

    Hello how are you doing today good afternoon

  • @josephsexton8310
    @josephsexton8310 หลายเดือนก่อน +1

    They need to start maintaining their racks better. Too many derailments isn't good for expenses.

  • @neilschwerdt3493
    @neilschwerdt3493 หลายเดือนก่อน +1

    Hi it is MRL / man in west valley city Utah what is wide is it,s been in high 40,s and no snow.
    By next week in the 50s that is wide.
    From Neil schwerdt 😊

  • @NJPurling
    @NJPurling หลายเดือนก่อน +1

    Is the #503 overweight to get into Alter Metal?
    If the moving blade of the switch is damaged or the locomotive has thin wheel flanges... Then that may be why this locomotive has split the switch before.

  • @MrEferrell
    @MrEferrell หลายเดือนก่อน

    Looks like from the phone number on the side of the hi-rail truck, it belongs to Hi Rail Leasing, 6802 39 St, Le Duc AB.

  • @GregMcLeod-ic6xo
    @GregMcLeod-ic6xo หลายเดือนก่อน +2

    Why is it 503 having trouble? 1221 and 502 seem to manage it without issue. There may be an issue with the axel alignment on 503

  • @jennifer9947
    @jennifer9947 หลายเดือนก่อน

    How many people shovel the stairs at the ski jump

  • @normandlemire7566
    @normandlemire7566 หลายเดือนก่อน +2

    They three axel's truck locomotives are not welcome in this kind of swiitch !

  • @randycalkins6361
    @randycalkins6361 หลายเดือนก่อน +1

    Where is This Alter Metals located ? I used to haul out of the south Beloit Alter 4 times a day.

    • @BudmanPackfan
      @BudmanPackfan หลายเดือนก่อน

      Kingsford, MI

    • @coryhoover01
      @coryhoover01 หลายเดือนก่อน

      East kingsford I believe just down from his house

  • @georgetabback9084
    @georgetabback9084 หลายเดือนก่อน +1

    What's this 3 now, in the period of 4-6 weeks?
    They need better maintenance.

  • @RealMelodyBlue
    @RealMelodyBlue 21 วันที่ผ่านมา +1

    Different crew, they may have subcontracted another company if they are short on hands or they need the outside expertise on something they may not have felt comfortable fixing or didn't know or have the right tools

  • @johnbeck8812
    @johnbeck8812 หลายเดือนก่อน +1

    Flying close to the asphalt do you have your pilot licence ?

  • @joshuanewman9358
    @joshuanewman9358 หลายเดือนก่อน +1

    Once they drop off empties how long does it take the crane to fill up a car of s scrap metal?

    • @coryhoover01
      @coryhoover01 หลายเดือนก่อน

      They don’t use a crane I believe they use a conveyor belt system

    • @jeffbronowicz3264
      @jeffbronowicz3264 หลายเดือนก่อน +2

      All depends how much is prepared on the ground. Those gondolas hold around 90 ton all depends on the empty weight on the car and how clean it is!!

  • @ricgal50
    @ricgal50 หลายเดือนก่อน +2

    Winnipeg

  • @poowg2657
    @poowg2657 หลายเดือนก่อน +2

    Same old E&LS.........

  • @davidbrown4823
    @davidbrown4823 หลายเดือนก่อน +2

    Contractor not railroad. quick work.

  • @southgeorgia2099
    @southgeorgia2099 หลายเดือนก่อน

    Where is this from at ...

  • @timmyfrierson2684
    @timmyfrierson2684 หลายเดือนก่อน +3

    At Railroad is gonna go broke with all of the derailments that they have it seems like they would put all new ties, ballast and continuous welded rail down and do a way with all of them problems

    • @Maine_Railfan
      @Maine_Railfan 27 วันที่ผ่านมา +2

      You realize how much that costs right? For a minimal amount of money they can keep installing ties as needed and keep things at 10 mph. It costs a lot less to fix a dozen derailments per year than to rebuild the entire railroad. FWIW the only things which could have caused this derailment are worn switch components or rotten ties.

    • @fhowland
      @fhowland 14 วันที่ผ่านมา

      lmao, continuous welded rail...right. to give the freight a smoother ride? for absolutely no reason. you obviously have no idea how the railroad business works and how slim their margins are.

    • @Maine_Railfan
      @Maine_Railfan 13 วันที่ผ่านมา +1

      @ bingo. Just stick enough ties under everything to keep things in operation is all they need.

  • @glennoconnor2980
    @glennoconnor2980 หลายเดือนก่อน

    Looks as if that HiRail is leased.

  • @class77sncb
    @class77sncb หลายเดือนก่อน

    the first axle of the first bogie is derailed...

  • @sigmanfloyd7179
    @sigmanfloyd7179 หลายเดือนก่อน

    You need to buy some studded tires. 😉

  • @dontomkinsonkpc6ndb862
    @dontomkinsonkpc6ndb862 หลายเดือนก่อน +1

    Old ELS building 0:14

  • @robertcovell2787
    @robertcovell2787 หลายเดือนก่อน

    There has to be something wrong with that switch if it's that dicey trying to get through it.

  • @TheNorthwestWind
    @TheNorthwestWind หลายเดือนก่อน

    beast

  • @dontomkinsonkpc6ndb862
    @dontomkinsonkpc6ndb862 หลายเดือนก่อน +1

    Watch the kars as they pass.

  • @JgSaise-kz9tj
    @JgSaise-kz9tj หลายเดือนก่อน

    👍👍👍👍👍👍👍👍👍👍

  • @Justfor1day
    @Justfor1day หลายเดือนก่อน

    Is that a end of the line industry at this location...

  • @williamoleschoolarendt7016
    @williamoleschoolarendt7016 หลายเดือนก่อน +1

    What's good Jayson? 503 is a SD40 am I correct?

    • @lynnzi3d
      @lynnzi3d หลายเดือนก่อน

      Yup, BNSF SD40

    • @BudmanPackfan
      @BudmanPackfan หลายเดือนก่อน +1

      Originally SD40 for GTW in 1970. BNSF upgraded to SD40-2 specs in early 2000s.

    • @williamoleschoolarendt7016
      @williamoleschoolarendt7016 หลายเดือนก่อน

      Thanks for answering me yall!☮️🫡

  • @dontomkinsonkpc6ndb862
    @dontomkinsonkpc6ndb862 หลายเดือนก่อน +1

    Alter Metal is spending $$$ on thier RR infrastructure...

  • @TylerDonitzen777GlorytoGod
    @TylerDonitzen777GlorytoGod หลายเดือนก่อน +1

    No you can't be serious another derailment the trains can't seem to stay on the rails.

  • @johnbeck8812
    @johnbeck8812 หลายเดือนก่อน +1

    Dam talk about flat light but we can see it

  • @andymueller4408
    @andymueller4408 หลายเดือนก่อน

    Maybe they should restrict movements there to 4 axle power only.

    • @MrNorth69
      @MrNorth69 หลายเดือนก่อน

      No.. why do that when you can do it the hard way

    • @BudmanPackfan
      @BudmanPackfan หลายเดือนก่อน

      They don't have any on this side of the railroad. 3 SD40-2s and a SD9

  • @williamaprewittjr337
    @williamaprewittjr337 หลายเดือนก่อน +1

    Is stairs more important than videoing trains? Someone could slip on said stairs then you’ll be asked why didn’t you do it?

  • @buzz191saw
    @buzz191saw หลายเดือนก่อน +1

    Maybe the turnout was “Alter”ed

    • @ShawnCalay
      @ShawnCalay หลายเดือนก่อน +1

      I'd say the points are badly worn....

    • @Jleed989
      @Jleed989 หลายเดือนก่อน +1

      Maybe it should be “scrapped” and rebuilt

    • @ShawnCalay
      @ShawnCalay หลายเดือนก่อน

      @@Jleed989 how about replace the points....

  • @armandoperez7967
    @armandoperez7967 หลายเดือนก่อน

    Another derailment? This owner obviously doesn’t care! G&W, WATCO, or someone else must buy this railroad and get it back into shape! I truly wonder in hindsight what would have happened if the often talked about merger of the Milwaukee Road and Chicago and North Western had occurred?

    • @TylerDonitzen777GlorytoGod
      @TylerDonitzen777GlorytoGod หลายเดือนก่อน

      Derailed on the switch nothing to do with any rails being out shape.

    • @ohboy2592
      @ohboy2592 หลายเดือนก่อน +1

      All short lines are the same. Spend as little money to run track speed. Fix problems as needed. Preventive maintenance isn’t in their vocabulary

    • @Maine_Railfan
      @Maine_Railfan 27 วันที่ผ่านมา +1

      Watco and G&W are just as bad. Watco ran a switching operation here in Maine and almost all the guys working for them were drug addicts. One of my friends worked for the connecting railroad and said he found their conductor strung out in the yard several times.

  • @raymondszybowicz7597
    @raymondszybowicz7597 หลายเดือนก่อน

    They need to do major work to there tracks and switches

    • @TylerDonitzen777GlorytoGod
      @TylerDonitzen777GlorytoGod หลายเดือนก่อน

      No it just derailed on the wrong switch it has nothing to do with that

  • @joebliss3609
    @joebliss3609 หลายเดือนก่อน +2

    Where's ELS 402? Seems like 4 axle power is what they need to use there. Or, have some empty cars behind the engine as idler cars to get in that siding, and pull the loads out, and put empty gondola cars in??

    • @BudmanPackfan
      @BudmanPackfan หลายเดือนก่อน +1

      been dead since ~April. it's not coming back w/o overhaul or block replacement.

  • @londonwhaley8690
    @londonwhaley8690 หลายเดือนก่อน +1

    I enjoyed the video👍👍

  • @raymondszybowicz7597
    @raymondszybowicz7597 หลายเดือนก่อน

    They need to do major work to there tracks and switches

  • @raymondszybowicz7597
    @raymondszybowicz7597 หลายเดือนก่อน

    They need to do major work to there tracks and switches

  • @raymondszybowicz7597
    @raymondszybowicz7597 หลายเดือนก่อน

    They need to do major work to there tracks and switches

  • @PacificEnterpriseNetwork
    @PacificEnterpriseNetwork หลายเดือนก่อน +1

    They need to do major work to there tracks and switches