Correct Place for Lapping Length in slab and Beam? Where is the Best place for Lapping Zone?

แชร์
ฝัง
  • เผยแพร่เมื่อ 2 ต.ค. 2024

ความคิดเห็น • 52

  • @SAmoyeedQ
    @SAmoyeedQ 3 ปีที่แล้ว +2

    In this video you have complicated & confused this point compared to your other video on this point

    • @ricksjordan2863
      @ricksjordan2863 3 ปีที่แล้ว +1

      Exactly, ive seen his other video and completely different from this, it's kinda confusing now

  • @bidhannepal4283
    @bidhannepal4283 4 ปีที่แล้ว +11

    In case of beam, i think lapping is provided at mid for compression bars...and at near the support for tensile bars....
    is it??

  • @kirantejagadaparthi8291
    @kirantejagadaparthi8291 3 ปีที่แล้ว +2

    in another video u only told lapping has to provide l/8 distance from edges at tension zone. here telling due to shear stress laping should not provide upto 2d from corners these two conditions wont work out togeather,which condition we need to consider

  • @velenkosinimmkhabela
    @velenkosinimmkhabela ปีที่แล้ว

    Great information but the example is not practical since there will be no need for lapping 6M beams since still should be 6.5 M in length in minimum availability in most of all countries.

  • @tasadduqbhuttah6043
    @tasadduqbhuttah6043 3 ปีที่แล้ว +1

    Confused lecture ..ur an other video does not agree with this

  • @ramvirsingh6334
    @ramvirsingh6334 5 ปีที่แล้ว +2

    Dear sir, you are requested please make your Vedio minimum of 15 minute. Because to understand in better way some Additional time must be there..

  • @Shah_nawaz.
    @Shah_nawaz. 3 ปีที่แล้ว +1

    not clearly explained

  • @mohammedqasim5221
    @mohammedqasim5221 ปีที่แล้ว

    You are talking to much 😂

  • @malharmemon6093
    @malharmemon6093 2 ปีที่แล้ว

    Now im more confused

  • @AliGaming786
    @AliGaming786 3 ปีที่แล้ว +1

    sorry sir but kuch samjh ni aaya
    plzz ak vedio aur bnaye crank bar per where we should provide crank bar plzzz ??

  • @m.vijaybhaskarareddy5167
    @m.vijaybhaskarareddy5167 3 ปีที่แล้ว +1

    Sir you explained about bottom bars then what about top bars

  • @muhammadhashim73
    @muhammadhashim73 ปีที่แล้ว

    Confusing🙄

  • @masudrana-om6zy
    @masudrana-om6zy 4 ปีที่แล้ว +3

    sir,difference between two lap center to center is 1.3times of Ld.

  • @zakierhussian8459
    @zakierhussian8459 3 ปีที่แล้ว

    Hindi please

  • @sudanpaudel8019
    @sudanpaudel8019 4 ปีที่แล้ว +3

    4 x L/4 is complete length.

  • @sarthakmohapatra3738
    @sarthakmohapatra3738 4 ปีที่แล้ว

    Wat is this 750 mm that u added ?

  • @lopeinario6600
    @lopeinario6600 4 ปีที่แล้ว +2

    L/4 means length devided 4

  • @muhammadhashim73
    @muhammadhashim73 ปีที่แล้ว

    I think, 6m=19.68feet , it means we have standard bar length=40 feet in the field. Cut full length in two equal pieces, and no need for lapping in the beam 😁

  • @masudrana-om6zy
    @masudrana-om6zy 4 ปีที่แล้ว +1

    150mm in lapping zone now changed to 100mm as per is13920.

  • @nuthsophanarak4289
    @nuthsophanarak4289 4 ปีที่แล้ว +1

    Where is 750mm come from?
    Thanks,

  • @Jayarajkv1969
    @Jayarajkv1969 ปีที่แล้ว

    Stirrups spacing is minimum lateral dimensions of beam at mid

  • @sarthakmohapatra3738
    @sarthakmohapatra3738 5 ปีที่แล้ว +1

    Sir wattabout lapping length and it's position for slab?

  • @lopeinario6600
    @lopeinario6600 4 ปีที่แล้ว +1

    You did not divide the length into 4 parts

  • @chris-danieluchendu
    @chris-danieluchendu 3 ปีที่แล้ว

    This is great.
    But I'll like to know more if I can get your contact please Sir

  • @senthilkumaran6921
    @senthilkumaran6921 3 ปีที่แล้ว

    Sir Confusing . Please tell exact place to provide lap for beam with repective to both ends

  • @ZarAlamSE-
    @ZarAlamSE- 5 ปีที่แล้ว

    good video

  • @ousmancolley9080
    @ousmancolley9080 3 ปีที่แล้ว

    Master am so intended on your lectures

  • @shaikhmujtaba69
    @shaikhmujtaba69 3 ปีที่แล้ว

    Those who didn't get it, just check out the specified code in the video

  • @sashikalaemmadi5333
    @sashikalaemmadi5333 4 ปีที่แล้ว +1

    Not properly explained.
    1. From where he got 750 mm,?
    2.From which point, this 1.55 mts. Is to be marked
    Detailing should be properly done.
    3. He should have explained for continuous Beam also.

  • @smithjames6606
    @smithjames6606 2 ปีที่แล้ว

    What is the effect of lapping of rebar at the same point.

  • @phyohtetkoko929
    @phyohtetkoko929 2 ปีที่แล้ว

    Thanks For Teaching Sir

  • @walisardar5509
    @walisardar5509 5 ปีที่แล้ว

    Sir why you add 750 And 800 ?
    And what is 750mm it's Constant ?
    please explain

    • @rzgarasadd2395
      @rzgarasadd2395 4 ปีที่แล้ว

      L/4 =1.5 then 1.5/2 for two sides of mid point =750 mm then this value + effective depth = 1550 mm

    • @abuthahir5144
      @abuthahir5144 3 ปีที่แล้ว

      Sir can we provide at two different places one is 2D and 2D+L/4 am I correct ?

  • @goodearthengineers6828
    @goodearthengineers6828 3 ปีที่แล้ว

    Where did you get 750mm?

  • @shaikhmujtaba69
    @shaikhmujtaba69 3 ปีที่แล้ว

    An Elaborative explanation btw! Good work

  • @ousmancolley9080
    @ousmancolley9080 3 ปีที่แล้ว

    Interested

  • @engrustamkhan
    @engrustamkhan 5 ปีที่แล้ว

    السلام عليکم ورحمة الله وبرکاته!
    د روغتيا په هيله مو، که کولای شی چې د وټس اپ نمبر مو راته په کمينټ کې پرېږدی؛ فېسبوک کې راسره وی خو بدبختانه چې زمونږ ای له منځه لاړه، لږ معلومات مي په کار وو....
    بريا مو په برخه

  • @lokeshsutar6915
    @lokeshsutar6915 4 ปีที่แล้ว

    But at support negative BM is maximum

  • @suklaranisinha4292
    @suklaranisinha4292 3 ปีที่แล้ว

    Thank u very much....

  • @lokeshsutar6915
    @lokeshsutar6915 4 ปีที่แล้ว

    Is it simply supported?

  • @sigitherupurnomo8447
    @sigitherupurnomo8447 4 ปีที่แล้ว

    Waalaikum salam.

  • @anjumchiniwal1378
    @anjumchiniwal1378 5 ปีที่แล้ว +2

    Sir video bade matt banaye . span length corner se 2D pe laping length dalte hai both said tooo.. Video katam hojati hai. Achi video hai

  • @jericho7411
    @jericho7411 4 ปีที่แล้ว

    What is rcc?

    • @raymonddominguez8931
      @raymonddominguez8931 4 ปีที่แล้ว

      Jerimiah Marco reinforced cement concrete

    • @raymonddominguez8931
      @raymonddominguez8931 4 ปีที่แล้ว

      Conrete with reinforced or rebars

    • @jericho7411
      @jericho7411 4 ปีที่แล้ว +1

      @@raymonddominguez8931 thank you cause my first time to hear it and I didn't know I'm just new learner

  • @ousmancolley9080
    @ousmancolley9080 3 ปีที่แล้ว

    Master am so intended on your lectures