Vancouver SkyTrain Ride | Braid Construction | (New Westminster to Production Way University)
ฝัง
- เผยแพร่เมื่อ 26 ก.ค. 2024
- In April 2024, part of the Production Branch on the Expo Line closed for construction of "OMC-4" next to BNSF's New Westminster Train Yard and the Trans-Canada Highway for two years.
As part of the construction effort, the eastbound tracks between Braid Station and Lougheed Town Centre Station were closed, with PWU trains single-tracking on the westbound tracks between Sapperton and Lougheed Town Centre.
A second train now terminates at Braid along the Eastbound tracks from Sapperton Station.
Chapters:
0:00-5:00 - New West to Sapperton Switch
5:01-10:19 - Sapperton to Lougheed Switch
10:20-14:36 - Lougheed to Production Way-University - ยานยนต์และพาหนะ
I love your channel, and you make great videos! I was just wondering, are these clips for public use? Like, can anyone take it and make say, a TH-cam video with it? (With Credits, ofc.) But, anyways, love your videos, and I hope you keep making more! Cheers!
👍👍👍👍👍👍👍👍👍👍👍👍👍👍👍👍👍
5:15 And now we become British 🇬🇧 where all traffic is to pass on the left.
was thinking more so Japanese, personally
Yeah I filmed this before but I heard this is service is going to til 2027
I'm not 100% sure, but the construction of OMC-3 is scheduled to be completed by 2026 for the Broadway Subway Extension and when the Mark Vs fully enter service.
@@carvolthproductions555 u mean omc 4?
@@user-hr7gj3im7pYes OMC 4 Correct I Work for PNR Railworks in Abbotsford and we do Track Maintenance for SkyTrain and CN Rail and CP Rail!
@@user-hr7gj3im7p I was going to say, not to be that guy, but this would be ocm 4, ocm 3 already exist and is in Coquitlam proper. Ocm 4 is barely outside of burnaby/new west.
@@carvolthproductions555 Wait, sorry but I'm out of the loop. What is the OMC-3, and what does it have to do with the Expo line construction?