Goregaon Mulund Link Road | GMLR | Mulund Goregaon Tunnel
ฝัง
- เผยแพร่เมื่อ 20 เม.ย. 2024
- Goregaon Mulund Link Road (GMLR) is a 12-km long road infrastructure project that will connect Mulund directly to Goregaon. After, Ghodbunder road, Jogeshwari-Vikhroli Link Road (JVLR), and Santacruz Chembur Link Road, GMLR is the fourth east to the west corridor in Mumbai.
The total estimated cost of the project is 6,225 crores1. It will reduce the traffic congestion and cut down the travelling time. As of now, it takes 80 minutes to travel from Mulund to Goregaon. Once the new road of GMLR is operational, this travel time will be reduced to as quick as 20 minutes.
Video Time strap and Google map location-
03:24 GMLR starting point- EEH Airoli Mulund Road
maps.app.goo.gl/s16Fc5zYuoABG...
03:56 Nahur Bridge
maps.app.goo.gl/LhvF5ma71xvYe...
04:12 GMLR Elevated Section start point
maps.app.goo.gl/tiCVPCFf4LRkk...
05:10 Dr Hedgevar junction Mulund and LBS road and Mumbai Metro Line 4 intersection point
maps.app.goo.gl/uQWuc3bucbKK2...
05:49 Elevated Rotary Interchange- Khindipada Mulund
maps.app.goo.gl/QC6iwRf1G3XTM...
06:08 Tunnel Mulund End
maps.app.goo.gl/DP7c9X5wZoRNa...
Connect me on-
Twitter- / jaideepkane
Instagram- / ferroequinologist_jaideep
Great video bro but 2025 tak complete hone k koi chance nahi! 2027-28 perhaps!
2037
May be 2047
@@moviesmovies6796 May be 4047
True,airoli katai is still not opened
after an initial jump start all projects including the metro are moving at snails pace -
hope i can keep my foot on atleast some of the project beofre i leave this world!!!
I guess elections are there so government might have slowed down the process cuz of uncertainty of who comes to power. I mean there isnt( uncertainty) logically but that might be the best reason
Not film city but tunnel will come out of Dindoshi. Road widening is gonna happen till 2025 and tunnel by 2028
Very well covered and explained as always, 2025 seems very aggressive timeline considering upcoming monsoon season..
Superb vdo through Drones.
Oct 2028 ka date diya hai govt ne project complete karne ka
Bahut late chal raha hai
Incredible Shoot Jaideep - ❤kK
Can you make a video on Thane Borivali Tunnel
1 hi banega bhaai environmentalist Nahi banne denge
@@moviesmovies6796 Ban jayega. Contracts de diye gaye hain
Excellent
Mumbai is world class, no slums, wide roads and superbly maintained. Amazing drainage system, beautiful non crowded public transport etc..
You would easily mistake this video as being shot in NYC, Shanghai or Seoul 👍👍
I smell sarcasm
Couldnt get any better bruv
Couldn’t agree more.
Someone has never been to NYC.
must video hota thanks
Great
Hope my grandchild will see light to this project. 50 years hence.
Thankyou so much
Make a video on Mumbai International Cruise Terminal Progress
2029 loksabha election me complete hoga
Minimum
They need to stack the interchanges at Dindoshi and Mulund (Airoli bridge) side. So that one can cross over without signals to both the express highways.
Please update SCLR Vakola wire duct bridge progress video
👌❤
Sir what about the sewri worli corridor??
Mumbai's western suburbs need these two projects quickly , it needs to be undertaken by the new government and give relief to Mumbaikars
Dada ek vdo nh-48 concreting work update from Bhayandar please
Jab saa bol rahi haa mahape aur shiphata ka road chalu hogeya has
thanks for sharing. with tunnel work not even started, 2025 seems ambitious. Perhaps by 2026 end
It will take 2/3 years at least for completion
Show from Goregaon side as well
mumbai main nahi saadna hai...
Magathane to Thane under National Park tunnel ka bhi video banao bhai pls
Please make video on Borivali -Thane Tunnel road as well and update on current status.
Even if it starts at least by end of 2027, that will be a big thing !!!
Don't see this project getting completed by 2025 as it looks like main tunneling work is not yet started. Within 2 months, monsoon season will start.
Need latest progress video of Navi Mumbai airport
Are bhai, 2025??? 2030 tak bhi hua na, to bhi on time hua aisa bol sakte hai 😂😂😂
Mulund skyline ❤
Not skyline, aerial view.
Not before 2030
Superb project, but Oberoi Mall signal, which is already jammed will get more jammed. The time saved by using this tunnel will get wasted after reaching Goregaon oberoi mall.
Awesome work boss, keep it up
Project to be completed by approx 2027 - 2028.
Ye itna bada slum konsa hai ? Isko bhi hatao yaar🧐
How on earth can this project get completed by next year ie 2025 ??
Kuch bhi
Good video no doubt but please be realistic
I don't see this project fully operational before 2027 - 2028
Bhai mai baccha tha tabse chalu hai abhi mai jvlr se office jaata goregoan hu
those slums☹
2026-27 most probably but 2025 is impossible considering they not even started tunnel work
By 2026 it will be completed
Maharashtra Government ka History Dekhte huye ye project 2027 28 tak pura hoga
30 mai pura hoga
This will take 6-7 yeary more, don't waste time on this now.
Please update on samruddhi mahamarg
मराठीत पण बनवा व्हिडिओ
Very slow work. I thinks contracters making jok unless they will not getting running bill payment they will not start to continue the work.
2025 impossible hai, 2027-28 mei complete hoga
Say 2030
Mumbai environmentalists are biggest villan of Mumbai
They don't want Mumbai progress
THe project will not be completed before 2027 I have been staying since 1988 on Mulund side
2032
Slum city of the world
german shepherd
Sonapur ka upar slum rukat ban rahi haa pura khindipada sirf slum beech maa rahi haa ye project 2020 maa aditya saheb na khud pass keya tha but abhi tak kuch kaam nahi hua but new sarkar saar kaam khatam hogeya haa
slum😢😢😮