Tape 4 Pwllheli to Barmouth and Machynlleth

แชร์
ฝัง
  • เผยแพร่เมื่อ 26 ส.ค. 2024
  • A driver's eye view of the line from Pwllheli to Barmouth and Machynlleth. This was recorded in the summer / autumn of 1993 (I think) from the cab of Derby Lightweight DMU M79900 Test Coach Iris.
    There is a commentary mentioning features along the line such as stations, level crossings, mileposts etc.
    It is as recorded except where I've edited out a couple of long stationary waits!
    Part 1 is here • Tape 1 Shrewsbury to W...
    Part 2 is here • Tape 2 Machynlleth to ...
    Part 3 is here • Tape 3 Machynlleth to ...
    Part 5 is here • Tape 5 Machynlleth to ...

ความคิดเห็น • 28

  • @tango6nf477
    @tango6nf477 ปีที่แล้ว +2

    This is such a lovely ride on a clear day, so sad the Welsh coast weather did its usual bit. Thanks for taking the effort to share, I really enjoy these cab ride videos.

  • @paulaj2829
    @paulaj2829 3 ปีที่แล้ว +1

    I just hope that when anyone watches this brilliant set of video's they also think about watching Google Earth along with them.. Because you can learn so much about your wonderful Geography & the way to pronounce all the little stations on e the way.. Again I must say just wonderful to bring this into peoples lives .. thanks again Nick for all the video's..

  • @tdurb0
    @tdurb0 3 ปีที่แล้ว +3

    Thank you so much for this 👏🏻🏴󠁧󠁢󠁷󠁬󠁳󠁿

  • @Thursdaym2
    @Thursdaym2 3 ปีที่แล้ว +3

    Lovely trip.

  • @marklewis-hh2bc
    @marklewis-hh2bc 6 วันที่ผ่านมา +1

    You missed out mentioning the world's first preserved railway in tywyn and were the rev w Audrey volunteered on

    • @nawbus
      @nawbus  4 วันที่ผ่านมา

      Sadly, I suspect that wasn't of official interest to the BR team on the train!

  • @WMRailSpotter
    @WMRailSpotter 3 ปีที่แล้ว +4

    57:50 barmouth level crossing
    41:08 harlech level crossing
    24:09 portmadog level crossing
    1:08:45 fairborne level crossing
    1:25:08

    • @TheosTrainsWalesOfficial
      @TheosTrainsWalesOfficial 3 ปีที่แล้ว +1

      Cheers mate, you missed out Traeth Mawr, just after Porthmadog.

    • @JPLCUK
      @JPLCUK 3 ปีที่แล้ว

      @@TheosTrainsWalesOfficial not just treath mawr almost all of them

  • @OWRailUK
    @OWRailUK 4 ปีที่แล้ว +3

    Nice one!

  • @Peter_griffin_01
    @Peter_griffin_01 24 วันที่ผ่านมา +1

    to see Barmouth bridge in its original state makes this a bit sad 1:02:40

    • @nawbus
      @nawbus  18 วันที่ผ่านมา

      At least it's in a much better state today!

  • @PaulWindsor-v2x
    @PaulWindsor-v2x 12 วันที่ผ่านมา +1

    I think.that Larry bridges line manager doing the commentary.what unit was this,?

    • @nawbus
      @nawbus  4 วันที่ผ่านมา

      Iris!
      www.railcar.co.uk/data/vehicle/975010

  • @lescalverley8335
    @lescalverley8335 3 ปีที่แล้ว +1

    Very surprised to see the crossing open to road traffic as the train entered Porthmadog station at 22.00.

    • @MsSteve70
      @MsSteve70 3 ปีที่แล้ว +1

      That particular crossing was operated by the driver by stepping out of the cab and using a control box next to the track.

    • @ChangesOneTim
      @ChangesOneTim ปีที่แล้ว

      That was normal when trains cross, as the first one in has to wait for the second to arrive and return the token before the Up (southbound) driver can be issued with a token to leave. That procedure took a few minutes and the road would be unnecessarily closed otherwise, so the crossing controls were designed accordingly.

    • @thomasoakleyderbyshire9761
      @thomasoakleyderbyshire9761 ปีที่แล้ว

      @@MsSteve70 it still is controller that way the same as Barmouth level crossing

  • @paulhorton5594
    @paulhorton5594 2 ปีที่แล้ว

    Why has Pwllheli station closed ?

  • @christanner8104
    @christanner8104 2 ปีที่แล้ว +1

    Great video, any idea what year this was filmed. Traveled along this line to Barmouth many times over the years.

    • @nawbus
      @nawbus  2 ปีที่แล้ว

      1993 I think

  • @andrewmarch7891
    @andrewmarch7891 3 ปีที่แล้ว

    Shame about the weather! You missed so much info, the Barmouth tunnel how long, when constructed etc. The life boat slipway under the railway, and about the Mawddach estuary bridge, what it did when it was last opened, (where the tidal reach up stream was) when it was attached by ship beetle how many wooden supports there are etc.,etc. 5 out of ten

    • @nawbus
      @nawbus  3 ปีที่แล้ว +5

      Thank you for your comment.
      The video was created by British Rail for their purposes, which is why the commentary only talks about mile posts, level crossings etc.
      If you want more historical information on the route, may I suggest the Video125 offering!
      www.video125.com/products/cambrian-coast

  • @mfgt4595
    @mfgt4595 3 ปีที่แล้ว

    Good video and commentary, shame about the horse laugh in the background.