Streetcar Greenway: The Complete Tour

แชร์
ฝัง
  • เผยแพร่เมื่อ 8 ก.ย. 2024
  • In 2010, CRSA was hired by the Salt Lake City RDA to develop the existing rail corridor between Central Point Station and Sugarmont Drive in Sugarhouse. Working with the RDA and the Utah Transit Authority, CRSA conceptualized the corridor for use as a greenway and a new streetcar line. CRSA Designer/ Project Manager Steve Cornell and Lead Landscape Designer Bryce Ward narrate.

ความคิดเห็น • 2

  • @aurabless7552
    @aurabless7552 5 ปีที่แล้ว

    "Welcome aboard, this train will be eating shortly" - TH-cam captions lol. Very informative and awesome video about rail corridors, this is helpful for my grad thesis. :)

  • @OmsiFreak92
    @OmsiFreak92 9 ปีที่แล้ว +1

    It is possible to see a full Cabview Ride ?