in aramco interview i was asked about energization methof of package substation, different tests to be performed on CB,panels...... kindly make a video on these topics
1. Primary & Secondary Current Injection Test for CB (Instantaneous, Short, Long) Equipment used: Oden or Raptor 2. Insulation Resistance (IR) Test - The equipment used is a Megger (Insulation Resistance Tester). 3. Continuity Test - The equipment used is a Digital Multimeter or a Low Resistance Ohmmeter. 4. Contact Resistance Test - Equipment: Micro-ohmmeter or Ductor. 5. Dielectric Strength Test (High-Potential or Hi-Pot Test) - Equipment: High-Potential (Hi-Pot) Tester.
I got the job sir thank you so much for your vedios sir
Excellent g very nice
..bhai mazeed video banaye...hum bohat shidat c intizar kar rahay hn
MASHAllah sir .great initiative plz uploaded more vedio reltaed elctrical qc. i wanna to getting a completed electrical qc knowlege.
in aramco interview i was asked about energization methof of package substation, different tests to be performed on CB,panels......
kindly make a video on these topics
1. Primary & Secondary Current Injection Test for CB (Instantaneous, Short, Long) Equipment used: Oden or Raptor
2. Insulation Resistance (IR) Test - The equipment used is a Megger (Insulation Resistance Tester).
3. Continuity Test - The equipment used is a Digital Multimeter or a Low Resistance Ohmmeter.
4. Contact Resistance Test - Equipment: Micro-ohmmeter or Ductor.
5. Dielectric Strength Test (High-Potential or Hi-Pot Test) - Equipment: High-Potential (Hi-Pot) Tester.
Asalamolaikm sir you are very great person. May Allah give you more success❤️❤️
Documents kon kon sa lagega or kya kya test hai check point kya kya he sir plesss it's very urgent to me
Assalamualaikum sir mujhe panel installation ke bare me thoda bataiye
NEC-308 is correct instead of NEC-408
Good video sir
Thnkw
make a video on project specification
I didn't get your point . Can you specify what you want
Sir course 9 and 10 is missing. Please upload
What is NMR
More video
Video m document notes clear nahi a raha as video m
Waiting for SAES p 123 and 107,103,100, 113
Sir ap na main difference between switch gear, panels and control gear nahi bataya...kindly comment ma bata dain...plz
20% spare breaker ka kya matlab hota hai
In junction box must be spare breakers for termination in future
Can We use SVG instead of Capacitor bank?
Designer should be decide not quality department
If you are quality control person than follow the design and drawings ifc
Sir 9 and 10 please uplode sir please
Soon InshAllah
Video m document notes clear Nahi as video m
Send rfi link plz?