MV Clad Switch Gear instalaltion and testing procedure

แชร์
ฝัง
  • เผยแพร่เมื่อ 1 ม.ค. 2025

ความคิดเห็น • 8

  • @faisalsardar1078
    @faisalsardar1078 6 ปีที่แล้ว +1

    Amazing step by Alfanar TQM team to ensure that optimum quality is delivered. Impressive work by Mr. Irfan Rashid such steps will lead towards a massive improvements in terms of quality.

    • @alahmadeemohammad1354
      @alahmadeemohammad1354 3 ปีที่แล้ว +1

      good description but The accompanying music is so annoying that you cannot focus in the explanation

  • @TM-ist
    @TM-ist 3 ปีที่แล้ว +1

    @5:20 the earthing should not have been connected against gravity force. @5:25 marking should have included nuts along the same line with bolts. At the moment you cannot understand if a loosening occurs. And also, Main circuit connections should be marked with 2 seperate colored marking, for example a blue mark should be done by the person who get the torque and red from the one who controls it. @5:55 Normally closed contact of test switch to the connection of relay is being tested but, NC contact should have been opened via putting in test plug into the test switch and it should have been checked whether the wiring is performed correctly.

  • @zaby09083
    @zaby09083 ปีที่แล้ว

    Nice presentation 👏

  • @bobcocampo
    @bobcocampo 3 ปีที่แล้ว

    Do you have cal/cm2 for Metal Sheet?

  • @rolitomercaderjr93
    @rolitomercaderjr93 3 ปีที่แล้ว

    How to aply...My work..Is fabricate LVSG swichgear..High voltage

  • @MadanSingh-un9ym
    @MadanSingh-un9ym 4 ปีที่แล้ว +1

    Sir
    substation Ke Upar video banao erection commissioning 220 KV

    • @PQMiS
      @PQMiS  4 ปีที่แล้ว

      Madan Singh sure we will create that also