Direct Route WCE Seksyen 3: Lebuhraya Persekutuan - Jalan Kebun - Tol & Persimpangan SAE / KESAS
ฝัง
- เผยแพร่เมื่อ 31 ม.ค. 2024
- The West Coast Expressway (WCE) / Lebuhraya Pantai Barat (LPB) is an interstate controlled-access highway running along the west coast of Peninsular Malaysia.
The 233-kilometre (145-mile) expressway is currently under construction, with several sections open for public use.
Once completed, the expressway will run between Changkat Jering, Perak and Banting, Selangor, following federal routes 5 and 60 for most of its route.
The expressway will operate in three sections, with sections of federal route 5 completing the missing connections; these sections will be upgraded to limited-access roads.
The expressway is expected to be fully completed by the end of 2024, except for a 10 km stretch from Section 7B which is expected to be completed by June 2026.
The expressway is being built by Konsortium Lebuhraya Pantai Barat. Approval was given by the government for the construction, which was to begin from 20 December 2013 and was to be completed within five years.
It originally was given route code E28 but later changed to E32, and E28 was used by Sultan Abdul Halim Muadzam Shah Bridge.
The project was delayed and actual construction began in May 2014. Currently, a 9.7-kilometre (6.0 mi) segment between Kapar and Bukit Raja, a 19-kilometre (12 mi) segment from Hutan Melintang to Teluk Intan and a 45-kilometre (28 mi) segment from Lekir to Beruas are opened to traffic.
Once the expressway is completed, it will be the fourth longest in Peninsular Malaysia, after the North-South Expressway Northern Route, the East Coast Expressway and the North-South Expressway Southern Route.
#wce #shahalam #selangor #malaysia #fawwazmedia
--------------------
Legacy by Savfk | / savfkmusic
Creative Commons / Attribution 4.0 International (CC BY 4.0)
creativecommons.org/licenses/...
Rasa WCE fokus siapkan jambatan Sg Selangor dan Sg Tengi dulu la, dari jambatan Sg Klang ni, selagi bahagian² yang tak selesai di Sg Kandis dan Seri Andalas/Sentosa tu tak selesai.
byk projek cam halted. sangkut. Sebab 2 , 3 tahun c00vId, byk terbengkalai, kos lepas p4ndemmik dah naik 200%, nak kene negotiated balik harga. Harga dah bahan binaan yg dah naik, takkan turun dah, samada buat jalan mahupun rumah. Harga bertahan dah cukup bagus. Sama jugak makanan. Nih masalah satu dunia.
Ptut 1 lgi highway utk elak p.pinang...
byk bangunan dan rumah mcm xroboh lagi
Bila dah fly drone mcm nie ,Bru nmpk banyak LG terbengakalai seksyen 3 nie,terutama isu pengambilan tanah,
Rasanya exit kesas ke federal highway makan masa 5 tahun ni😅,Harap Wce fokus pada tg karang ke assam jawa dan kesas ke banting
aku rasa seksyen 3 WCE ni paling last dibuka! assam jawa - tanjung karang tu at least boleh la berharap 2025 settle dulu
😊❤️👍🏻
Progress yg sangat teruk. Mmg lambat lagi la siap nampaknya.
Apa pulak ngan kemelut pengambilan tanah di Selatan Lebuhraya Persekutuan ni?
Sampai siap guna nanti agak2 bper kali kena turap ni. Buat temporary tempat cycling pun ok gak ni
3 tompok tak bersambung & tiada perubahan. boleh ke siap tahun depan?
Seksyen ni lmbt siap pun xpe.. seksyen ni x brpe pntg,byk laluan di seksyen ni.. pling pntg tg karang asam jawa..
drone dji model apa ni?jauh jarak felai ni..
Tuan tanah mintak harga tinggi,tu yg tak settle lg.
Very slow progress
Membongak je gomen ckp 2025 siap. Perolehan tanah kat klang pn byk lg lom settle. Byk je lagi umah n kedai yg diduduki. Mana yb klang ni?
buat apa buat jalan tak bole megah dengan negara luar, buat bangunan teringgi didunia buat kubur sekali dalam bangunan tu