WCE Seksyen 3, 2 & 1: Liputan Penuh Lebuhraya Persekutuan - Sungai Klang - KESAS - SKVE - Banting

แชร์
ฝัง
  • เผยแพร่เมื่อ 19 ก.ค. 2024
  • The West Coast Expressway (WCE) / Lebuhraya Pantai Barat (LPB) is an interstate controlled-access highway running along the west coast of Peninsular Malaysia.
    The 233-kilometre (145-mile) expressway is currently under construction, with several sections open for public use.
    Once completed, the expressway will run between Changkat Jering, Perak and Banting, Selangor, following federal routes 5 and 60 for most of its route.
    The expressway will operate in three sections, with sections of federal route 5 completing the missing connections; these sections will be upgraded to limited-access roads.
    The expressway is expected to be fully completed by the end of 2024, except for a 10 km stretch from Section 7B which is expected to be completed by June 2026.
    The expressway is being built by Konsortium Lebuhraya Pantai Barat. Approval was given by the government for the construction, which was to begin from 20 December 2013 and was to be completed within five years.
    It originally was given route code E28 but later changed to E32, and E28 was used by Sultan Abdul Halim Muadzam Shah Bridge.
    The project was delayed and actual construction began in May 2014. Currently, a 9.7-kilometre (6.0 mi) segment between Kapar and Bukit Raja, a 19-kilometre (12 mi) segment from Hutan Melintang to Teluk Intan and a 45-kilometre (28 mi) segment from Lekir to Beruas are opened to traffic.
    Once the expressway is completed, it will be the fourth longest in Peninsular Malaysia, after the North-South Expressway Northern Route, the East Coast Expressway and the North-South Expressway Southern Route.
    #wce #banting #selangor #malaysia #fawwazmedia
    --------------------
    WCE Seksyen 3, 2 & 1 Edisi Raya 2024, Liputan Penuh dari Lebuhraya Persekutuan - SKVE - Banting
    --------------------
    00:00 Intro
    00:49 Seksyen 3
    07:24 Seksyen 2
    15:38 Seksyen 1
    27:09 Outro

ความคิดเห็น • 56

  • @FawwazMedia
    @FawwazMedia  3 หลายเดือนก่อน +22

    Selamat Hari Raya Aidilfitri. Maaf zahir dan batin.
    Terima kasih kepada semua yang menyokong Fawwaz Media. Mohon subscribe, share, like & comment.
    Sokongan anda sangat dihargai.
    عيد مبارك وكل عام وانتم بخير
    Terima kasih.

    • @unknigga777
      @unknigga777 3 หลายเดือนก่อน +2

      lepas ni update csr2c pula min

    • @ramzen1976
      @ramzen1976 3 หลายเดือนก่อน +2

      Sy dah subscribe lama dah.

  • @husnymazlan8155
    @husnymazlan8155 3 หลายเดือนก่อน +7

    Assalamualaikum dan Salam Sejahtera.
    Saya ingin mengucapkan Selamat Hari Raya Aidilfitri Maaf Zahir Dan Batin kepada anda semua serta Konsesi Lebuhraya Persisiran Pantai Barat (WCE) secara keseluruhannya. Sekian
    Salam Aidilfitri dari Mat Puncak Alam (Husnie)

  • @mohdeairul5533
    @mohdeairul5533 3 หลายเดือนก่อน +7

    Selamat hari raya Aidilfitri maaf zahir dan batin kepada seluruh umat Islam

  • @MrAzman644
    @MrAzman644 3 หลายเดือนก่อน +7

    Selamat hari raya aidilfitri...

  • @arifjalil8515
    @arifjalil8515 3 หลายเดือนก่อน +6

    Salam Aidilfitri,Maaf Zahir dan Batin.

  • @jal78100
    @jal78100 3 หลายเดือนก่อน +7

    Selamat Hari Raya Aidilfitri Maaf Zahir dan Batin...... bertabah la untuk Seksyen 3

  • @razi_haron
    @razi_haron 3 หลายเดือนก่อน +11

    Lama lg la nak siap portion jalan kebun klang ni...nampak macam land acquisition pun x setel lg...byk kilang2, rumah kena roboh tu. Tgk xde progress still terputus2.

  • @izzaniielachannel
    @izzaniielachannel 3 หลายเดือนก่อน +6

    Selamat hari raya admin..maaf zahir dan batin😊

  • @fikrihakim8970
    @fikrihakim8970 3 หลายเดือนก่อน +7

    Nampak macam lama lagi nak siapkan keseluruhan WCE. Kerja kerja pemindahan pun tak settle lagi tu. Harap dapat settlekan cepat ye sebelum kerja kerja meroboh rumah / kilang dijalankan. Apabila WCE siap sepenuhnya, barulah seronok tengok..... 😊

  • @mohdrizalmurad-zs5bo
    @mohdrizalmurad-zs5bo 3 หลายเดือนก่อน +8

    Selamat Hari Raya Aidilfitri Yang mulia....!

  • @Wangtu20235
    @Wangtu20235 3 หลายเดือนก่อน +5

    THANKS FOR SHARING!!!!!!!!!!

  • @muaz_3105
    @muaz_3105 3 หลายเดือนก่อน +6

    td lalu wce perak mmg mcm plus cuma kene improve tollh padat sgt touch ngo tu

  • @umarmahmood2266
    @umarmahmood2266 3 หลายเดือนก่อน +8

    (west coast expressway highway happy eid aidilfitri & end 2025)

  • @MechaGundAm
    @MechaGundAm 3 หลายเดือนก่อน +5

    Harap siapkan cepat la dari tanjung karang ke asam jawa tu segera sebab pengguna terpaksa keluar dr tanjung karang lalu jalan lama, rugi masa dekat situ dengan jem sangat teruk bila musim kemuncak perayaan dan sebagainya..itu boleh kata laluan paling penting patut siapkan dulu..laluan dalam jalan persekutuan selangor ni dah tak kisah sangat sebab banyak option boleh pilih dah..

  • @JohnJMacai786
    @JohnJMacai786 3 หลายเดือนก่อน +5

    cepatlah banting - SKVE siap hendaknya

  • @d1want34
    @d1want34 3 หลายเดือนก่อน +8

    sebagai org Penang aku tak heran pn bila seksyen 1,2,3 ni siap, yg paling penting skrg Ijok - Tg Karang 😁

    • @dunia566
      @dunia566 2 หลายเดือนก่อน +1

      kita serupa...kita serupa

  • @muhdaimanharith
    @muhdaimanharith 3 หลายเดือนก่อน +19

    Lama betul nak siap.. jalan tu dari baru dah nak rosak dah

    • @xulism
      @xulism 3 หลายเดือนก่อน

      Dulu federal n selangor state parti berbeza. Tu yg byk isu tertunggak n menyebabkan delay di bhgn Selangor.

  • @afizi1213
    @afizi1213 3 หลายเดือนก่อน +5

    selamat hari raya jugaaa

  • @vspl3641
    @vspl3641 3 หลายเดือนก่อน +6

    thanks

  • @outalingamcrap9366
    @outalingamcrap9366 3 หลายเดือนก่อน +5

    Salam Lebaran, Maaf Zahir dan Batin - pada pendapat peribadi saya, Seksyen 3 rasanya akan lebih lewat siap berbanding Asam Jawa- Kapar......

  • @yasirnoor4773
    @yasirnoor4773 2 หลายเดือนก่อน +1

    السلام عليكم ورحمة الله تعالي وبركته
    ابڠ فواز
    Great
    Keep it up 👍

  • @user-yk3eu7ol5s
    @user-yk3eu7ol5s 3 หลายเดือนก่อน +8

    Bila shoot video ni ye?nampak macam progress lama je ni.

  • @shukriwafiq5220
    @shukriwafiq5220 3 หลายเดือนก่อน +8

    banyak sangat rumah kena roboh tu..

  • @azharhashim8514
    @azharhashim8514 3 หลายเดือนก่อน +7

    Section 3 tu mcm lama lg nak siap.. section 2 dan 1 tu nampak mcm tahun ini boleh guna kalau YB duyong yang push dorang ni😂.. tp pelik kenapa exit SKVE tu jauh betul kenapa la tak buat exit kat laluan terus ke banting jimat sikit duit nak bayar pampasan tanah tu..😅

    • @farididris7922
      @farididris7922 3 หลายเดือนก่อน +1

      ada satu lagi...dekat exit skve tu memang tkde tol ke?

  • @ramzen1976
    @ramzen1976 3 หลายเดือนก่อน +16

    Sistem toll konvensional atau cara lama ni byk guna tanah secara tak efisien yg spatutnye tanah itu boleh digunakn tujuan lain. Spatutnye gne toll byrn elektronik mcm di Singapura barulah jimat jumlah tanah yg digunakan utk buat lebuhraya. Pengguna pun tak perlu pusing jauh2 utk brpindah dari satu toll plaza ke satu toll plaza yg lain gara2 lebuhraya yg dimiliki oleh pemilik yg brlainan. Smua ni buang masa dan buang minyak. Byk guna minyak byk duit yg habis.

    • @whybotherha1021
      @whybotherha1021 3 หลายเดือนก่อน +1

      project mengkayakan cartel project je ni.. buat tak pakai otak asal duit masuk,.

    • @ramzen1976
      @ramzen1976 3 หลายเดือนก่อน

      @@whybotherha1021 itulah realiti negara kita.

  • @maniraul071
    @maniraul071 3 หลายเดือนก่อน +8

    Kutip toll tapi lampu tarak

  • @Aerial360MY
    @Aerial360MY 3 หลายเดือนก่อน +7

    Selamat Hari Raya! Mind if I ask a silly question, how do you fly a dronevat such a long distance without losing transmission signal? Thanks for sharing

    • @Permaimerah
      @Permaimerah 3 หลายเดือนก่อน +2

      Many mid range dji drone have waypoint function. i.e mini 4 pro, mavic 3 classic, air 3.

    • @Aerial360MY
      @Aerial360MY 3 หลายเดือนก่อน

      @@PermaimerahThanks for the tips

  • @shahrahiminrosle3106
    @shahrahiminrosle3106 3 หลายเดือนก่อน +5

    awal resurface area bkt raja tu

  • @PakDie
    @PakDie 3 หลายเดือนก่อน +3

    mantap jugak signal drone dji tuan.air 3 saya ni paling jauh pergi balik 16km..

    • @FawwazMedia
      @FawwazMedia  3 หลายเดือนก่อน +1

      sama. maksimum pernah dapat 21km. jarak selamat 15 - 16 km.

    • @PakDie
      @PakDie 3 หลายเดือนก่อน

      @@FawwazMedia mantap tuan

  • @azmanhassan4875
    @azmanhassan4875 3 หลายเดือนก่อน +10

    Kat Thailand tol tak kutip tapi hway dia sepanjang jalan dari satun ke Pakbara ada lampu ( walau pun kawasan ni di pencilkan oleh kerajaan pusat d Bangkok )

    • @ismadanial4862
      @ismadanial4862 3 หลายเดือนก่อน +1

      bro thai still ada jln yg bertol.boleh gi bangkok klau nk rasa bertol.btw yg jln highway antara wilayah pulk diorng just upgrade jln persekutuan. bukn fully mcm highway kita.walaupun stgh section btul2 highway tpi just level mcm highway kt perlis tu. tiba2 kiri kanan perumahan kampung.traffic light pun ada beberapa section.mcm LTU nk gi kelantan tu la rupa dia.tiba2 ada traffic light.

    • @engkuizzat5023
      @engkuizzat5023 3 หลายเดือนก่อน

      Tol tak kutip? 😂 Dah habis jalan satu Negara Thai ke belum?

    • @prophecus
      @prophecus 3 หลายเดือนก่อน

      jalan satun pakbara tu macam lebuh AMJ muar - melaka je.. 4 lorong tapi banyak traffic light

    • @azmanhassan4875
      @azmanhassan4875 3 หลายเดือนก่อน

      persoalan nya tol kutip tapi lampu jalan tak ada. Tak kira ler betul2 highway atau tidak.
      no security at night

  • @FaizAris
    @FaizAris 3 หลายเดือนก่อน +5

    ☺️❤️👍🏻

  • @PakDie
    @PakDie 3 หลายเดือนก่อน +2

    area selangor banyak lagi seksyen yang belum siap.pengambilan tanah kawasan rumah dan kilang.tengok masih belum ada lagi pembinaan

  • @tiongcangming3900
    @tiongcangming3900 หลายเดือนก่อน +1

    WCE Highway Seksyen 3 can be opening 2029

  • @dunia566
    @dunia566 2 หลายเดือนก่อน +1

    yang stretch ni nak siap 2030 pon takpa...janji bukit raja tgh karang setel 2-3 tahun lagik

  • @FaizAris
    @FaizAris 2 หลายเดือนก่อน +1

    👍🏻❤️😊

  • @anandrao6024
    @anandrao6024 3 หลายเดือนก่อน +3

    1st,promissed tonopen by CNY.
    Then promissed to open before RAYA.
    Whats next?
    Keep promissing?
    Damn,cakap tarak serupa bilin.
    Waste of rime

    • @azrulhariqahmad4171
      @azrulhariqahmad4171 3 หลายเดือนก่อน +1

      Section ni lambat lagi .kurang kurang 2 tahun lagi utk semua section siap .Yg buka sebelum raya yg hala beruas ke tol Changkat jering ..perak

    • @SBSyahmiIskandar
      @SBSyahmiIskandar 3 หลายเดือนก่อน

      Banting nak open dah

    • @dunia566
      @dunia566 2 หลายเดือนก่อน

      They can promise all they want because THEY are building it , not yoiu

  • @mr.kacanghijau
    @mr.kacanghijau 3 หลายเดือนก่อน +7

    more roads = more cars = more traffics = more deaths = more destruction. Have you not heard about induced demands ? I guess Malaysia is a Car Loving country and I absolutely hate that. Car centric development is utterly DISGUSTING !!!