Hi Sir. Thank you very much. This was very helpful. How do you copy the formula to the rest of the spreadsheet to "Apply throughout the project" like you do at 12:38?
@SoftEdemy this is based on having a cost loaded programme, which I dont have.I was wondering if we can use the weightage technique for producing cost s curve. Just like you did in this video .
Thanks a lot for this. Can we run the report so we have the timelines in weeks instead of months.(I. e when trying to build the report in excel). Cos it didn't work .
@ZubairKhan-iv7gi yes if weights are decided from actual industrial practice. Not assumed and unactual weights. From same method contractor should be paid and also that cost should also reflect to their cash flow also
Watch the video. One option is that you can assign units by weights as per the above video . The other option video will be unloaded in upcoming Month. In that method we directly calculate schedule percent from data date and finish date and we put physical in the curve.
@eatsleepyoutuberepeat4226 data sheet. Any body can name any whole data collection for schedule preparation named as data sheet. Their is no standard set that this is called data sheet. Anyone learn from any conventional or field based or youtube planner they may name any sheet as data sheet where they can find any specs detail. In case if you are looking for s curve data sheet than the values used for s curve calculation . Then you can say it's data. And the excel sheet from where you have taken that data is data sheet. Ask you consultant or client what information you required in that data sheet
@eatsleepyoutuberepeat4226 everything is their in the video. All calculation are mentioned in the video. Nothing alegabric in it. Moreover this is an old video. I don't know where it's backup file. If their is any file . We must attach to the video. For more requests text to our whatsapp or email support team.
Read the relevant article for more details
www.softedemy.com/s-curve-without-resources-in-primavera-p6/
Very helpful thanks
Thank you
Hi Sir. Thank you very much. This was very helpful. How do you copy the formula to the rest of the spreadsheet to "Apply throughout the project" like you do at 12:38?
It's simple copy then select cells and paste
Thanks for the effort, that was helpful
@@ferdielopez1 welcome
Good one but try and reduce your speed overall you are doing great
To reduce the speed please use the TH-cam player option. Where you can change video speed 0.5 .
I hope it's suite you
Great video. Can we do the same for cost s Curve and generate Planned and earned value?
th-cam.com/video/sJ-Xkfq2Ojs/w-d-xo.htmlsi=qMRIoziae9NhF212
@SoftEdemy this is based on having a cost loaded programme, which I dont have.I was wondering if we can use the weightage technique for producing cost s curve. Just like you did in this video .
@@billytubes yes , you can do it
@@SoftEdemy will give it a go . JazakAllah
@@billytubes jazakallah
Thanks a lot for this. Can we run the report so we have the timelines in weeks instead of months.(I. e when trying to build the report in excel). Cos it didn't work .
You can create S Curve with any interval , monthly weekly daily ,you have select the right timeline,
Also you can copy it directly from resource assignment and draw S Curve
Can We carry EV analysis using weights?
@ZubairKhan-iv7gi yes if weights are decided from actual industrial practice. Not assumed and unactual weights.
From same method contractor should be paid and also that cost should also reflect to their cash flow also
Awsome
Thanks
my P6 dont have the Est.Weight column, I've looked up in the general but cant found any
@SyahidatulFilzahBtAbdulKadir please contact to Softedemy support to check the issue wa.me/+923155537580
How come 19260 mhs from budgeted unit if you doesn’t assign resources? (min 7,14). Thanks a lot
@maurlord weight assigned. Then by top down estimation . Approximately total manhour assigned. Try to watch again and again video to understand better
how we create physical s curve if resource and cost is not loaded?
Watch the video.
One option is that you can assign units by weights as per the above video .
The other option video will be unloaded in upcoming Month.
In that method we directly calculate schedule percent from data date and finish date and we put physical in the curve.
@@SoftEdemy got it how import in excel to modify curve for better presentation?
@@SoftEdemy as well you please explain complete progress percentage without cost n resources?
@@muhammadusmananwar8992 th-cam.com/video/2Sivf6_e_Z4/w-d-xo.html
@@muhammadusmananwar8992 in upcoming video .we will explain for sure
👍👍
👍👍
Where is the data sheet brother???
@eatsleepyoutuberepeat4226 data sheet. Any body can name any whole data collection for schedule preparation named as data sheet.
Their is no standard set that this is called data sheet. Anyone learn from any conventional or field based or youtube planner they may name any sheet as data sheet where they can find any specs detail.
In case if you are looking for s curve data sheet than the values used for s curve calculation . Then you can say it's data. And the excel sheet from where you have taken that data is data sheet.
Ask you consultant or client what information you required in that data sheet
@@SoftEdemy kindly share your a curve data sheet for study purpose. I can learn and understand how formulas are working based on what conditions.
@eatsleepyoutuberepeat4226 everything is their in the video. All calculation are mentioned in the video.
Nothing alegabric in it.
Moreover this is an old video. I don't know where it's backup file.
If their is any file . We must attach to the video.