Solved Unable to Connect Database in Primavera P6| Please run the database configuration tool
🌐 WhatsApp: wa.me/+923155537580
🛒 Store Link: www.softedemy.com/Shop
📧 Email: info@softedemy.com
🌍 Website: www.softedemy.com
This video addresses the Primavera P6 Error: Unable to Connect to the Database and provides a step-by-step guide to resolving it. The tutorial covers common causes, troubleshooting techniques, and database configuration methods for both new and existing users, ensuring smooth project management in Primavera P6.
[00:00] Introduction
[00:00] Overview of the Unable to Connect Database in Primavera P6 error.
[00:15] Information on support channels for addressing the Primavera P6 database connection error, including WhatsApp, email, and the website.
[02:00] Identifying the Database Connection Error
[02:01] Explanation of the error message: Unable to Connect to the Database Primavera حل مشكلة.
[02:20] Introduction to the P6 database configuration tool and its purpose in fixing the issue.
[03:00] Understanding the P6 Database Configuration Issue
[03:05] Demonstration of the P6 unable to connect to database error when launching Primavera P6 without proper database setup.
[03:40] Common causes, including missing configuration for P6 SQL Server database connection or Standalone databases.
[04:30] Types of P6 Databases and Their Setup
[04:35] Explanation of database options:
Standalone database for local setups.
SQL Server database for multi-user environments.
Oracle database for enterprise-level configurations.
[05:30] Step-by-step instructions for selecting the correct database type and configuring it.
[06:50] Resolving Standalone Database Connection Issues
[06:55] How to locate an existing Standalone database file to resolve the Primavera P6 database connection error.
[07:45] Configuring a standalone database for users experiencing the Unable to Connect Database in P6 error.
[08:30] Creating a New Database in Primavera P6
[08:40] Guide for new users:
Setting up a new standalone database using the P6 database configuration tool.
Assigning a unique name to avoid overwriting existing files.
[09:10] Answering the question: How do I connect to a database in Primavera P6?
[10:30] Handling Version Mismatches and SQL Server Errors
[10:40] Explanation of the error caused by mismatched versions, e.g., loading a Primavera P6 Oracle database from version 23 into version 22.
[11:10] Solution for fixing P6 SQL Server database connection error: upgrading to the compatible Primavera P6 version or reconfiguring the database.
[12:30] Tips for Avoiding Future P6 Database Errors
[12:35] Best practices for maintaining a database:
Regularly back up files to prevent data loss.
Monitor for potential issues like the P6 database configuration issue or file corruption.
[12:50] Use of recovery software to restore deleted database files if necessary.
[14:00] Closing and Support Information
[14:05] Summary of solutions for the Unable to Connect Database in Primavera P6 error.
[14:30] Encouragement to contact support for resolving P6 database configuration issues, including SQL Server and Oracle database problems.
unable to connect to the database. would you like to configure the database connection now primavera
FOLLOW US ON SOCIAL
Get updates or reach out to Get updates on our Social Media Profiles!
Twitter: FaisalM15432091
Facebook: Softedemy
Instagram: softedemy
LinkedIn: www.linkedin.com/company/Softedemy
#softedemy,#Planningengineer,#primaverap6
Disclaimer:- This channel does not promote or encourage any illegal activities and all content provided by this channel is meant for EDUCATIONAL PURPOSE only. Copyright Disclaimer: - Under section 107 of the
Copyright Act 1976, allowance is made for FAIR USE for the purpose such as criticism, comment, news reporting, teaching, scholarship, and research. Fair use is a use permitted by copyright statutes that might otherwise be infringing. Non- Profit, educational, or personal use tips the balance in favor of FAIR USE.
มุมมอง: 273

วีดีโอ

Primavera P6 ERROR Project file import Failed | P6 Import Error Solved! in Minutes .
มุมมอง 379หลายเดือนก่อน
🌐 WhatsApp: wa.me/ 923155537580 🛒 Store Link: www.softedemy.com/Shop 📧 Email: info@softedemy.com 🌍 Website: www.softedemy.com This video provides a detailed guide to resolving the Primavera P6 ERROR: Project File Import Failed. It focuses on troubleshooting P6 XER Import Errors, identifying missing or invalid WBS parent IDs, and correcting P6 Import File Validation Errors to ensure successful p...
Fixing Schedule and Performance Percent Complete Not Rolling Up (WBS Level) in Primavera P6
มุมมอง 2.2K4 หลายเดือนก่อน
📞 Contact Us WhatsApp :wa.me/ 923155537580 🌆 Introduction to Fixing Zero Schedule Percent Complete and Performance Percent Complete at WBS Level in Primavera P6 🕰️ Identifying the Issue: Schedule Percent Complete and Performance Percent Complete are zero at the WBS level. ⚙️ Explaining the Causes: Understanding why Percent Complete shows zero in Primavera P6. 🔍 Checking for Cost-Loaded Schedule...
Assign Activity Codes in Primavera P6 with Excel (FAST & EASY!)
มุมมอง 1.3K6 หลายเดือนก่อน
📞 Contact Us WhatsApp :wa.me/ 923155537580 - 🌆 Introduction to assigning activity codes in Primavera P6 using Excel for efficient project management. - 🕰️ Explanation of the initial setup in Primavera P6 lacking WBS codes, setting the stage for code assignment. - ⚡️ Overview of the different types of activity codes in Primavera P6: Global, EPS, and project-specific. - 🛠️ Creation of main head c...
Automate Your Project Control: Primavera P6 to Excel Schedule Comparison ( Pro Tool) . Reports
มุมมอง 1.3K8 หลายเดือนก่อน
📞 Contact Us WhatsApp :wa.me/ 923155537580 🔗 Get the Tool : www.softedemy.com/product/1-primavera-p6-to-excel-schedule-comparison-dashboard-pro-tool/ Contact us on info@softedemy.com Welcome to Softedemy, your Project Control and Engineering Software Academy! In this video, we will guide you through the comprehensive features of our Schedule Comparison Dashboard Excel tool, designed to seamless...
Cumulative AT completion Total cost vs Cumulative planned value cost for recovery in Primavera P6
มุมมอง 7079 หลายเดือนก่อน
WhatsApp:wa.me/ 923155537580 Store Link: www.softedemy.com/Shop Contact us on info@softedemy.com Cumulative AT completion Total cost vs Cumulative planned value cost for recovery in Primavera P6 📌 Timestamps: 0:00 - Introduction to Softedemy and Overview of Today's Topic 1:00 - Comparing Cumulative At-Completion Total Cost with Cumulative Planned Value Cost 2:04 - Detailed Analysis of At-Comple...
Latest Primavera P6 23.12 Version: 6 New Features Explained | Primavera P6 Upgrades 2024 Version
มุมมอง 1.2K10 หลายเดือนก่อน
WhatsApp:wa.me/ 923155537580 Store Link: www.softedemy.com/Shop Contact us on info@softedemy.com Primavera P6 23.12: 6 New Features Explained | Project Management & Scheduling Upgrades Join Softedemy's detailed walkthrough of the most recent updates in Primavera P6 Version 23.12, designed to elevate your project management, scheduling, and resource allocation skills to the next level. This vide...
Interview Assignment 03 for Planning Engineer by using Primavera P6 | Building Works
มุมมอง 4.4Kปีที่แล้ว
WhatsApp:wa.me/ 923155537580 File Link : www.softedemy.com/product/p6-interview-assignment-03/ Store Link: www.softedemy.com/Shop Contact us on info@softedemy.com Interview Assignment 03 for Planning Engineer by using Primavera P6 | Building Works 1:15 - Overview of Today's Assignment 2:11 - Discussing WBS Level 3 and Long Lead Items 3:09 - Estimation of Productivity Rate and Labor Equipment Re...
Interview Assignment 02 for Planning Engineer by using Primavera P6 | Basic Planning Engineer
มุมมอง 1.8Kปีที่แล้ว
WhatsApp:wa.me/ 923155537580 File Link : www.softedemy.com/product/p6-interview-assignment-02/ Store Link: www.softedemy.com/Shop Contact us on info@softedemy.com Interview Assignment 02 for Planning Engineer by using Primavera P6 | Basic Planning Engineer 0:00 - Introduction to Softedemy & Project Control Engineering 0:50 - Discussion on Assignments & Academic Assignments vs. Interview Assignm...
Planning Engineer Interview Assignment 01 by using Primavera P6 | Construction of Office Building
มุมมอง 16Kปีที่แล้ว
WhatsApp:wa.me/ 923155537580 File Link : www.softedemy.com/product/p6-interview-assignment-01/ ‎ Store Link: www.softedemy.com/Shop Contact us on info@softedemy.com Planning Engineer Interview Assignment 01 by using Primavera P6 | Construction of Office Building 📌 Timestamps: 0:00 - Introduction to Softedemy: Project Control & Engineering Software Academy 0:50 - Overview: Planning Engineers Int...
Calculating Earned Schedule Analysis excel from Primavera P6 vs Earned Value Formula Template Sheet
มุมมอง 3Kปีที่แล้ว
WhatsApp:wa.me/ 923155537580 File Link : www.softedemy.com/product/earned-schedule-analysis-excel/ ‎ Store Link: www.softedemy.com/Shop Contact us on info@softedemy.com Calculating Earned Schedule Analysis in Excel from Primavera P6 vs. Earned Value Formula Template Sheet 📌 Timestamps: 0:12 - Welcome & Introduction to Softedemy 0:27 - Explanation on Earned Value Management System in PMI 0:47 - ...
Earned Value Analysis in Primavera P6 | Earned Value Management EVM in Project Management | Software
มุมมอง 7Kปีที่แล้ว
WhatsApp:wa.me/ 923155537580 Store Link: www.softedemy.com/Shop Contact us on info@softedemy.com Earned Value Analysis Sheet :www.softedemy.com/product/earned-value-analysis-sheet/ Earned Value Analysis in Primavera P6 | Earned Value Management EVM in Project Management | Software Timestamps 0:00 - Introduction to Softedemy and Project Control 0:50 - Basics of Earned Value Management Systems in...
Convert Updated Schedule into Baseline Schedule | Remove Progress from Primavera P6 Schedule
มุมมอง 7Kปีที่แล้ว
WhatsApp:wa.me/ 923155537580 Store Link: www.softedemy.com/Shop Contact us on info@softedemy.comm Convert Update Schedule to Baseline Schedule | Remove Progress from Primavera P6 Schedule Removing Actuals in Primavera P6: We'll guide you step-by-step on how to remove actual start dates, reset remaining duration, and units to their original state. Challenges & Errors: Learn about the hurdles fac...
Resources Calculation with Productivity Rates in Projects at all Industries | Assign in Primavera P6
มุมมอง 9Kปีที่แล้ว
WhatsApp:wa.me/ 923155537580 Productivity rates Link : www.softedemy.com/product/productivity-rates/ Store Link: www.softedemy.com/Shop Contact us on info@softedemy.com Timestamps 0:00 - Introduction to Softedemy 2:45 - Types of Productivity Rates 4:24 - Duration Calculation 4:56 - Definition of Crew and Its Role 5:37 - Quantity and Crew Number Formula 6:04 - Impact of Changing Productivity Rat...
PV=EV Revised Schedule P6 Tool | Planned value Equal Earned Value | Schedule % Equal Performance %
มุมมอง 5Kปีที่แล้ว
WhatsApp:wa.me/ 923155537580 Tool Link : www.softedemy.com/product/pv-ev-revised-schedule-p6-tool/ Store Link: www.softedemy.com/Shop Contact us on info@softedemy.com PV=EV Revised Schedule P6 Tool | Planned value Equal Earned Value | Schedule % Equal Performance % 👋 Welcome to Softedemy! In today's comprehensive guide, we dive deep into mastering project management with a focus on Planned Valu...
How to Make Actual Cost Equal to Earned Value Cost in Primavera P6 : Step by Step Method AC=EV
มุมมอง 4.7Kปีที่แล้ว
How to Make Actual Cost Equal to Earned Value Cost in Primavera P6 : Step by Step Method AC=EV
Solving Primavera P6 Schedule % Mismatch: Aligning Excel-based S Curve and Schedule Percent Complete
มุมมอง 3.7Kปีที่แล้ว
Solving Primavera P6 Schedule % Mismatch: Aligning Excel-based S Curve and Schedule Percent Complete
How to Use the Primavera P6 Excel Lite Tool : Transform Your Project Controls - Complete Tutorial
มุมมอง 1.7Kปีที่แล้ว
How to Use the Primavera P6 Excel Lite Tool : Transform Your Project Controls - Complete Tutorial
Schedule Comparison Dashboard XER Tool: Analyzing and Reporting Project Progress Baseline Comparison
มุมมอง 1.2Kปีที่แล้ว
Schedule Comparison Dashboard XER Tool: Analyzing and Reporting Project Progress Baseline Comparison
Schedule Percent Complete Calculation in Excel | Planned Percentage | WBS Formula in Primavera P6
มุมมอง 7Kปีที่แล้ว
Schedule Percent Complete Calculation in Excel | Planned Percentage | WBS Formula in Primavera P6
Primavera P6 The import file is invalid P6 Error: Import corrupted XER file error Resolved Finally
มุมมอง 4.7Kปีที่แล้ว
Primavera P6 The import file is invalid P6 Error: Import corrupted XER file error Resolved Finally
Detecting And Fixing Dangling Activities In Primavera P6 Time Schedule
มุมมอง 3.3Kปีที่แล้ว
Detecting And Fixing Dangling Activities In Primavera P6 Time Schedule
From Primavera P6 Schedule to Excel: Creating Gantt Charts with XER to XLSX Tool in Excel
มุมมอง 2.6Kปีที่แล้ว
From Primavera P6 Schedule to Excel: Creating Gantt Charts with XER to XLSX Tool in Excel
Automatically Color WBS Levels in Excel with Primavera P6 Formatting: Step-by-Step Guide
มุมมอง 4Kปีที่แล้ว
Automatically Color WBS Levels in Excel with Primavera P6 Formatting: Step-by-Step Guide
How to Import Activities into P6 from Excel under Specific WBS | Add Activities to WBS in P6
มุมมอง 9Kปีที่แล้ว
How to Import Activities into P6 from Excel under Specific WBS | Add Activities to WBS in P6
Detailed Schedule Comparison Report XER Tool: How to Compare Two Schedules of Primavera P6
มุมมอง 3.5Kปีที่แล้ว
Detailed Schedule Comparison Report XER Tool: How to Compare Two Schedules of Primavera P6
How to Link two or more Projects in Primavera P6 | Link with Other Projects | Interlinking
มุมมอง 2.7Kปีที่แล้ว
How to Link two or more Projects in Primavera P6 | Link with Other Projects | Interlinking
How to Combine Projects in Primavera P6 | Primavera P6 Integrated Master Schedule
มุมมอง 8Kปีที่แล้ว
How to Combine Projects in Primavera P6 | Primavera P6 Integrated Master Schedule
How to Create S Curve Planned vs Actual from Primavera P6 to Excel
มุมมอง 14Kปีที่แล้ว
How to Create S Curve Planned vs Actual from Primavera P6 to Excel
How to Create WBS From Excel to Primavera P6 | How to import WBS in P6
มุมมอง 18Kปีที่แล้ว
How to Create WBS From Excel to Primavera P6 | How to import WBS in P6

ความคิดเห็น

  • @janaarthanari4742
    @janaarthanari4742 4 ชั่วโมงที่ผ่านมา

    If possible progress S curve in progress stage extracting from Primavera P6 simple short video please

    • @SoftEdemy
      @SoftEdemy 4 ชั่วโมงที่ผ่านมา

      @@janaarthanari4742 ok noted in dairy

  • @TechPCDBDP
    @TechPCDBDP วันที่ผ่านมา

    Thanks It's Really Helpful

    • @SoftEdemy
      @SoftEdemy วันที่ผ่านมา

      @@TechPCDBDP welcome

  • @JanarthananArthanari
    @JanarthananArthanari วันที่ผ่านมา

    Really Great efforts and dedications. Nice to see sharing big knowledge to others.

    • @SoftEdemy
      @SoftEdemy วันที่ผ่านมา

      @@JanarthananArthanari thanks

  • @HassanAhmed-nc7kc
    @HassanAhmed-nc7kc 2 วันที่ผ่านมา

    THANK YOU BROTHER

    • @SoftEdemy
      @SoftEdemy 2 วันที่ผ่านมา

      @@HassanAhmed-nc7kc welcome

  • @fadzlifz2431
    @fadzlifz2431 3 วันที่ผ่านมา

    Hi Sir.can you advise what will happend if the S Curve generated not really and not exactly in "S Shaped"?thank you sir

    • @SoftEdemy
      @SoftEdemy 3 วันที่ผ่านมา

      @fadzlifz2431 S curve does not means that it should be like S shapped. But every shape have meaningful like linear means unform work . Front loaded means start work is more then end back loaded means in end their is higher work then start like that trapezoidal , bell shapped and alot of more shapes have meanings to under planned work density as compared to time and units or cost.

    • @fadzlifz2431
      @fadzlifz2431 3 วันที่ผ่านมา

      @SoftEdemy hi sir.thanks for explanation. Is it accept if the S Curve have zig zag shape/like stairs at some point?

    • @SoftEdemy
      @SoftEdemy 3 วันที่ผ่านมา

      @fadzlifz2431 in cumulatively every upcoming point should be higher value than previous. If it's same then also not issue. Next point should be equal or higher then previous. If it comply with this condition then ok.

  • @fadzlifz2431
    @fadzlifz2431 3 วันที่ผ่านมา

    Hi Sir.can you advise what will happend if the S Curve generated not really and not exactly in "S Shaped"?Thank you sir

  • @fadzlifz2431
    @fadzlifz2431 3 วันที่ผ่านมา

    Hi..sometimes,they will counter us back,why s curve not in "S" shape..for those who not really involved about the curve,for sure they will come to conclusion and ask why s curve not in "S" shape..can you advise..which one is better..to follow what ever we plan/manpower allocate based on time line...or adjusting the manpower histogram to "Bell Shape" so that can get S Shape..can you advise?thank you sir

  • @krushnachandra7513
    @krushnachandra7513 6 วันที่ผ่านมา

    PERFECT Explanation. Great Job

    • @SoftEdemy
      @SoftEdemy 6 วันที่ผ่านมา

      @@krushnachandra7513 thanks

  • @mohammedafrozahmed6452
    @mohammedafrozahmed6452 11 วันที่ผ่านมา

    Thank you for sharing informative videos, there is some modifications you have to work onin this Excel file. ""Actual Strat and Actual Finish""

    • @SoftEdemy
      @SoftEdemy 11 วันที่ผ่านมา

      @@mohammedafrozahmed6452 ok

  • @Happylife-pb2fs
    @Happylife-pb2fs 13 วันที่ผ่านมา

    Thank you

    • @SoftEdemy
      @SoftEdemy 13 วันที่ผ่านมา

      @@Happylife-pb2fs welcome

  • @milannandi8187
    @milannandi8187 16 วันที่ผ่านมา

    Valuable time ❤

    • @SoftEdemy
      @SoftEdemy 16 วันที่ผ่านมา

      @@milannandi8187 thanks

  • @Hamid_Khattak
    @Hamid_Khattak 16 วันที่ผ่านมา

    Very helpful Sir. Sir onething to ask, we use planned values vs earned values for cast based monitoring and anned vs Actual valies for manhours based monitori. For earned value, we will use performance % complete, but for actual manhours value in percentage, where we will get this value? Thank you

    • @SoftEdemy
      @SoftEdemy 16 วันที่ผ่านมา

      @Hamid_Khattak if project have been monitored only on budgeted labor or non labor units then take performance percent for that also. Please remember in case if you don't have cost at project then you will use performance percent. If cost is their it means performance percent is reserve for Earned value. Then update actual units from direct labor units calculated in weekly or daily reports.if you exact activity wise actual units then you can put in P6. Otherwise divide the timeperiod units with budgeted labor units you will get percentage for the period.

  • @zhakamu3996
    @zhakamu3996 16 วันที่ผ่านมา

    👍

  • @usmangaming2324
    @usmangaming2324 17 วันที่ผ่านมา

    Can you make a full video on Area Planner

    • @SoftEdemy
      @SoftEdemy 17 วันที่ผ่านมา

      @@usmangaming2324 sure

  • @DavidChigbo
    @DavidChigbo 20 วันที่ผ่านมา

    Can you walk us through the process of creating the WBS in the Spreadsheet ???

    • @SoftEdemy
      @SoftEdemy 20 วันที่ผ่านมา

      @@DavidChigbo sure soon . We will create complete project tutorials

    • @DavidChigbo
      @DavidChigbo 20 วันที่ผ่านมา

      @@SoftEdemy what I mean is the numbering with regards to the color which enables it to synchronize in Levels that you importing to P6.

    • @SoftEdemy
      @SoftEdemy 20 วันที่ผ่านมา

      @DavidChigbo ok . We will create video relevant to it

  • @SoftEdemy
    @SoftEdemy 21 วันที่ผ่านมา

    www.softedemy.com/product/wbs-to-activity-code-p6-excel-converter/

  • @aliebrahimi787
    @aliebrahimi787 22 วันที่ผ่านมา

    As usual it is very useful tips. thanks bro tesekkurler

    • @SoftEdemy
      @SoftEdemy 21 วันที่ผ่านมา

      @@aliebrahimi787 welcome

  • @nasiralham565
    @nasiralham565 27 วันที่ผ่านมา

    Thanks Sir ❤

    • @SoftEdemy
      @SoftEdemy 25 วันที่ผ่านมา

      Welcome

  • @mouhcenegoudjili8319
    @mouhcenegoudjili8319 27 วันที่ผ่านมา

    Great thanks

    • @SoftEdemy
      @SoftEdemy 27 วันที่ผ่านมา

      @@mouhcenegoudjili8319 welcome

  • @1981mudassir
    @1981mudassir 28 วันที่ผ่านมา

    WONDERFUL HELPED ME A LOT THANKS REALLY

    • @SoftEdemy
      @SoftEdemy 28 วันที่ผ่านมา

      @@1981mudassir welcome

  • @Abu_arwa_ahmed
    @Abu_arwa_ahmed หลายเดือนก่อน

    that is amazing . good job thanks

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @@Abu_arwa_ahmed welcome

  • @sanurazin1427
    @sanurazin1427 หลายเดือนก่อน

    Is there any way, we can get the schedule % complete for non 7 day Callender

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @sanurazin1427 yes Check l excel lite tool www.softedemy.com/shop

  • @paventhanm1475
    @paventhanm1475 หลายเดือนก่อน

    I have done the same steps but while I'm importing from excel my first resource for every activity is not imported I dont know why

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @paventhanm1475 without looking the sheet you export .I couldn't conclude the reason

    • @paventhanm1475
      @paventhanm1475 หลายเดือนก่อน

      @SoftEdemy How can I share that excel sheet with you Share your Mail Id

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @paventhanm1475 check what'sapp above in description of video

  • @abdainawi
    @abdainawi หลายเดือนก่อน

    I am on company laptop where none of external apps are allowed. What to do

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @abdainawi share this video to it and ask them to resolve this error

  • @mohanadberair7599
    @mohanadberair7599 หลายเดือนก่อน

    Great job! Thank you so much, Engineer. I also liked your layout very much; could you please share it with me? It will be appreciated.

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @@mohanadberair7599 welcome

    • @mohanadberair7599
      @mohanadberair7599 หลายเดือนก่อน

      @@SoftEdemy could you share the layout with me?

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @mohanadberair7599 please contact to email or WhatsApp

  • @saadqureshi4291
    @saadqureshi4291 หลายเดือนก่อน

    Instead of going through report wizard, couldn't you just copy the same data from resource usage spreadsheet?

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @@saadqureshi4291 you we can copy.

  • @saudpm40
    @saudpm40 หลายเดือนก่อน

    Do you have any advance video for resource and cost loading and creating wightages sheet

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @@saudpm40 no not yet

    • @saudpm40
      @saudpm40 หลายเดือนก่อน

      @@SoftEdemy what are the steps if we have scope and we asked to create resource loaded and cost loaded schedule? how do weightages work?

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @saudpm40 The process cannot be explained in text . In simple the answer is apply weights on activities in excel and import. In future if we got some spare time . We will share relevant video. You can check other sources currently

  • @saudpm40
    @saudpm40 หลายเดือนก่อน

    Also share the duration type you have selected

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @saudpm40 its 5 year old video please check latest earned value and S curve videos. Moreover duration type suitable for construction industry is fixed duration and units. Units/time should be relaxed. Moreover in revise schedule or recovery baseline resource assignment can be assigned new. Any baseline can have resource assignment but an updated schedule should not change its resource or relationship rather scope change

    • @saudpm40
      @saudpm40 หลายเดือนก่อน

      @@SoftEdemy so you mean when we are preparing resource loaded schedule we should have Fixed Duration &units/time

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @saudpm40 duration and units should be decided by planner and loaded into the schedule and should be fixed so it's should not change later

  • @saudpm40
    @saudpm40 หลายเดือนก่อน

    Why have you assigned resources after baselining and updating schedule should resoirce assignment not be before baselining and updating?

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @saudpm40 it's an old video please disregard if their is mistake in explanation.check my latest earned value videos and S curve videos

    • @saudpm40
      @saudpm40 หลายเดือนก่อน

      @@SoftEdemy apologize if its a wrong question brother please share latest video

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @saudpm40 th-cam.com/video/0jJ3ceEJyMY/w-d-xo.htmlsi=gTskBj_A9fs86gx3 Earned value video

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @saudpm40 th-cam.com/video/Snnk_VU-hyE/w-d-xo.htmlsi=jJUPGrLi4df6AHja Earned schedule

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @saudpm40 th-cam.com/video/sJ-Xkfq2Ojs/w-d-xo.htmlsi=5RhWhXtSICz0gJj4 Planned and actual s curve Please note that planned are from baseline whatever you have assigned. Where ever this word used

  • @kasasapeter9649
    @kasasapeter9649 หลายเดือนก่อน

    Thank you so much. I was getting this problem, after following the instructions, I was able to solve my problem.

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @@kasasapeter9649 welcome

  • @hiroshi-today
    @hiroshi-today หลายเดือนก่อน

    Thanks for this! This should be even default function!!

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @@hiroshi-today yes

  • @aliebrahimi787
    @aliebrahimi787 หลายเดือนก่อน

    Thanks Bro it is very useful

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @@aliebrahimi787 welcome

  • @camiloalejandroamigo2436
    @camiloalejandroamigo2436 หลายเดือนก่อน

    Thanks, great video, I was looking for a long time for a solution to this problem.

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @@camiloalejandroamigo2436 welcome

  • @muhammadalikhan4011
    @muhammadalikhan4011 หลายเดือนก่อน

    thanks sir

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @@muhammadalikhan4011 welcome

  • @engrmuhammadzahidabbas2258
    @engrmuhammadzahidabbas2258 หลายเดือนก่อน

    Great work Faisal bhai keep it up

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @@engrmuhammadzahidabbas2258 welcome

  • @mohdmuzu142
    @mohdmuzu142 หลายเดือนก่อน

    I noticed you're using Global Change to reduce the original duration of activities and have applied a filter for activity status not equal to 'Completed.' However, this approach also impacts in-progress activities. My question is: when the % Complete Type is set to 'Physical,' reducing the original duration of in-progress activities doesn't affect their finish date because the remaining duration remains unchanged, and the finish date is calculated based on the remaining duration. How can we effectively perform crashing for these in-progress activities as well? please correct me if i am wrong. also let us know easy method to do crashing or fast tracking, as I have 40,000 activities schedule.

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @mohdmuzu142 I don't think you fully understood the video. There are many additions and changes required, and we will update the content to provide more comprehensive details. First, there is no filter in the global change for setting the activity status as "not equal to completed." Second, we never instructed you to change the percentage. Please review the formula used to calculate the new start date and remaining duration. A lot of important details were missing due to video editing. For a more thorough understanding, please refer to the article where the process is described in detail. However, before closing, I must emphasize that this is not the final version. We plan to release an updated tutorial, which might take some time, but the technique is now more refined and detailed. Keep in mind that this is an older video, but it may still be useful for certain cases or projects. If it helps you, feel free to continue using it; otherwise, consider updating the method.

  • @sagarkeysung
    @sagarkeysung หลายเดือนก่อน

    Dear Sir, Do you have any active promo code?

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @@sagarkeysung please contact on whatsapp wa.me/+923155537580

  • @sagarkeysung
    @sagarkeysung หลายเดือนก่อน

    AOA Sir, kindly advise, how to view overall project percentage in wbs level if we choose physical percent complete?

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @sagarkeysung check in performance percent complete column

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      @@sagarkeysung because physical percent complete column by itself donot use EVM

  • @hamzarehman4948
    @hamzarehman4948 2 หลายเดือนก่อน

    How u add A - integer??

    • @SoftEdemy
      @SoftEdemy 2 หลายเดือนก่อน

      @@hamzarehman4948 user defined field column

  •  2 หลายเดือนก่อน

    Thank you for sharing great help!

    • @SoftEdemy
      @SoftEdemy 2 หลายเดือนก่อน

      Welcome

  • @leotrinidad7815
    @leotrinidad7815 2 หลายเดือนก่อน

    Question. How much time did you save between creating the WBS via Excel then Importing versus creating the WBS Directly in P6?

    • @SoftEdemy
      @SoftEdemy 2 หลายเดือนก่อน

      @leotrinidad7815 I use my excel lite tool.for this purpose save 90 percent time check www.softedemy.com/shop

  • @PUBGWARRIORERA
    @PUBGWARRIORERA 2 หลายเดือนก่อน

    Keep it Up.

    • @SoftEdemy
      @SoftEdemy 2 หลายเดือนก่อน

      @@PUBGWARRIORERA thanks

  • @PUBGWARRIORERA
    @PUBGWARRIORERA 2 หลายเดือนก่อน

    Hope for a detailed course on Power BI for Planning Engineers on your channel.

    • @SoftEdemy
      @SoftEdemy หลายเดือนก่อน

      Sure .

  • @thusharakumarasinghe9869
    @thusharakumarasinghe9869 2 หลายเดือนก่อน

    Can we add these activity steps in to a bulk number of Activities, For Example, same activity steps need to be added to 1000 activities at once. Do they need to add activity by activity

    • @SoftEdemy
      @SoftEdemy 2 หลายเดือนก่อน

      @thusharakumarasinghe9869 yes in bulk can be added

  • @ankushsharma9280
    @ankushsharma9280 2 หลายเดือนก่อน

    I have a question: Where can we put the awarded value of individual items in our P6 project, and what is the spending plan? According to my understanding, the spending plan is the value we spend against the awarded value which is fixed.

    • @SoftEdemy
      @SoftEdemy 2 หลายเดือนก่อน

      @ankushsharma9280 these options or for finance. Use EVM instead of it

    • @ankushsharma9280
      @ankushsharma9280 2 หลายเดือนก่อน

      @@SoftEdemy can u share the link for EVM. and cost account is not helpful for planning engineers.

    • @SoftEdemy
      @SoftEdemy 2 หลายเดือนก่อน

      Not one specific video the evm is explained their check other cost loading video th-cam.com/video/0jJ3ceEJyMY/w-d-xo.htmlsi=-dMTEcuRjwLPQP8a

  • @blainecote8134
    @blainecote8134 2 หลายเดือนก่อน

    Very helpful thanks

    • @SoftEdemy
      @SoftEdemy 2 หลายเดือนก่อน

      Thank you

  • @fernandomares1049
    @fernandomares1049 2 หลายเดือนก่อน

    So weel explained, thank you so much! greetings from México

    • @SoftEdemy
      @SoftEdemy 2 หลายเดือนก่อน

      @@fernandomares1049 welcome

  • @razamalik5719
    @razamalik5719 2 หลายเดือนก่อน

    The first time I tried, I failed. But on my second attempt, I succeeded by making a small change. I noticed that the sequence number (Seq-Num) was set to 0 in the notepad, so I changed it to 6, as shown in the data sheet.

    • @SoftEdemy
      @SoftEdemy 2 หลายเดือนก่อน

      @@razamalik5719 yes

  • @Amazongadgetstech
    @Amazongadgetstech 2 หลายเดือนก่อน

    Great video...gain lot of knowledge....thank you sir for this valuable content

    • @SoftEdemy
      @SoftEdemy 2 หลายเดือนก่อน

      Welcome

  • @shiva.mishex6870
    @shiva.mishex6870 3 หลายเดือนก่อน

    It halts on 30% :(

    • @SoftEdemy
      @SoftEdemy 2 หลายเดือนก่อน

      Check again for wbs short code and id