AFTERMATH of a derailment step-by-step process of clean-up to reopening the line

แชร์
ฝัง
  • เผยแพร่เมื่อ 30 ส.ค. 2022
  • AFTERMATH of a derailment step-by-step process of clean-up to reopening the line. derailment happened on 2022-05-15 in Herbst, Indiana with the first grain train returning on 2022-05-21.

ความคิดเห็น • 111

  • @blendamorris4419
    @blendamorris4419 18 วันที่ผ่านมา +2

    There's one thing you guys NEVER need to do and that's go to the gym!! What hard work -- and thanks for the video to those of us who have always wondered how the clean up gets done!

  • @davidg5369
    @davidg5369 3 หลายเดือนก่อน +3

    Kudos to your wife! 👍👍👍 I hope your ankle heals swiftly!

    • @therailroadtiespiker
      @therailroadtiespiker  3 หลายเดือนก่อน +1

      Yes it has healed but now when it’s cold and damp man it let’s me know I have pins in it. Lol

  • @markbickelhaupt4414
    @markbickelhaupt4414 10 หลายเดือนก่อน +2

    Lucky that this train was moving slowly. All the cars would have been off the tracks! No saving those cars. Not a lot of room to move in the ROW. Hope you feel better soon. Thank to your wife to continue the video work. 👏👏👏Too bad that it rained & not get to see the car clean up! Nice work on your and retail crew's part 👍👍👍

  • @rodsmith3911
    @rodsmith3911 ปีที่แล้ว +20

    Hope that your ankle is better by now. This video is an excellent one for showing to railroad maintenance guys and railroad management as it illustrates precisely why it doesn't pay trying to save costs by cutting the maintenance budget! It probably cost more than a whole years budget just to get the line cleared and back into traffic, and I notice that one grain car was still left on site on its roof at the side of the embankment. I assume that it might be recovered later or cut up where it sits.
    The repair gang certainly got on with the job. The breakdown gangs really earn their wages as its dangerous and dirty work even in good weather. No fun at all when it's cold, wet and dark, which it usually is on an emergency call out.
    Good work by you and your wife in getting a film of the recovery work in progress.

    • @TheNemosdaddy
      @TheNemosdaddy ปีที่แล้ว

      You understand that is a myth, right? Class 1 railroads spend 1 to 4 billion dollars each just in annual maintenance, not including extra projects. Also if you think one derailment is the cost of a years maintenance, you're really out of touch.

  • @BeeLineEast
    @BeeLineEast ปีที่แล้ว +6

    Cool video. That track looked terrible. What a mess that was.I know from working in a rail mill that rail is not cheap. I think if i am right one 84 Ft. 136 - 10 Re was around 800.00 a rail. That was 10 years ago. So most of the new good rail goes to busy main lines first. 141 section rail is more expensive yet. And head harden rail is more expensive.

  • @John-ru5ud
    @John-ru5ud ปีที่แล้ว +11

    One of the last things the operating crew wants to do is to call dispatch to report that the train is on the grounds. That means the start of an involuntary, unpaid vacation even though they had nothing to do with the derailment.

    • @therailroadtiespiker
      @therailroadtiespiker  ปีที่แล้ว +4

      Yep

    • @TheNemosdaddy
      @TheNemosdaddy ปีที่แล้ว

      Again, not true. You're not just pulled out of service because you had a derailment. That's not at all how it works. The stuff foamers come up with us ridiculous.

  • @TrainsForever
    @TrainsForever ปีที่แล้ว +11

    The first clip of the derailment I’m like 😐 doesn’t look that bad. Then you moved and showed down the track and I’m like 😳 brooo that’s crazy

    • @therailroadtiespiker
      @therailroadtiespiker  ปีที่แล้ว +5

      And they were doing less than 10mph. I was told from a railroad worker that the track had been rippling and when it it got to The trestle is when the derailment happened.

    • @TrainsForever
      @TrainsForever ปีที่แล้ว +3

      @@therailroadtiespiker that’s strange 🤔

    • @therailroadtiespiker
      @therailroadtiespiker  ปีที่แล้ว +5

      @@TrainsForeverthe train was shoving the track forward from the weight of it.

    • @TrainsForever
      @TrainsForever ปีที่แล้ว +3

      @@therailroadtiespiker ahh. Got ya

  • @celioleitao7303
    @celioleitao7303 ปีที่แล้ว +4

    Awesome video of the whole process of getting the tracks back in service.

  • @davidg5369
    @davidg5369 3 หลายเดือนก่อน +2

    Yea, I broke a leg years ago. Never had a cast.. had a rod thru the marrow to stabilize it, but still couldn't put any weight on it. I could predict bad weather. I guess I was feeling the changes in barometric pressure, it would make my leg ache something fierce!

  • @wallochdm1
    @wallochdm1 ปีที่แล้ว +5

    That looks like pretty light rail, with not particularly great maintenance standards. Harmonic rocking.

  • @bnrailfannz8262
    @bnrailfannz8262 ปีที่แล้ว +5

    I was involved in a grade crossing accident afew years ago- truck& trailer vs our train. Truck was demolished, train( most of it) & loco off the track. I saw what the forces can do to the rail but oh my! the track/rail in the derailment aftermath depicted....wow!!

    • @therailroadtiespiker
      @therailroadtiespiker  ปีที่แล้ว +2

      Yep there was a derailment last month in Massillon Ohio a train vs a truck and trailer and they had something like 20 cars on the ground.

  • @earlschmitt884
    @earlschmitt884 ปีที่แล้ว +5

    Great video. It shows all of the hard work that is involved in getting the iron monsters back on track. It also shows how everything is planned and carefully done.
    Good luck with the ankle.

    • @therailroadtiespiker
      @therailroadtiespiker  ปีที่แล้ว +1

      Thank you Earl check out my other videos that show them replacing ties just down from the train derailed.

  • @dennisb-trains23
    @dennisb-trains23 ปีที่แล้ว +3

    A fantastic video presentation. Superb job and an atta boy to your wife for completing the process by pinch hitting for you. You both did a splendid job. Thank you.

    • @therailroadtiespiker
      @therailroadtiespiker  ปีที่แล้ว

      Thank you Dennis take some time and check out my videos from logansport she does the second camera on a few of them going over the bridge

  • @vettebecker1
    @vettebecker1 ปีที่แล้ว +6

    That was some heavy NS engines on that light pound rail!!!!

    • @therailroadtiespiker
      @therailroadtiespiker  ปีที่แล้ว +4

      Yes I've seen them pull four locomotives in a row over those tracks.

    • @vettebecker1
      @vettebecker1 ปีที่แล้ว +6

      @@therailroadtiespiker That’s scary, considering the pound of the rail and conditions of the roadbed

  • @codyhilton1750
    @codyhilton1750 ปีที่แล้ว +5

    Excellent video.

  • @danbedford5419
    @danbedford5419 ปีที่แล้ว +6

    Good video, what a mess , sorry about ur ankle

  • @supercuda1950
    @supercuda1950 ปีที่แล้ว +1

    Great video. Shows how tedious cleanup is. Love that engine!

  • @MandG80439
    @MandG80439 ปีที่แล้ว +3

    Still amazes me how small a kingpin is

  • @northfloridarails2136
    @northfloridarails2136 ปีที่แล้ว +3

    Another fine video.

  • @willieb58
    @willieb58 ปีที่แล้ว +4

    Good video, thanks for the update. Trust the ankle is better by now. A shame that it takes a mess like that to fix the roadbed. Cost twice as much when it's done after the problem happens.

    • @therailroadtiespiker
      @therailroadtiespiker  ปีที่แล้ว +2

      Yes they have been working on putting new ties and renewing the roadbed for the past two months. The crew they have can has been trying to play catch up from when the other railroad had the tracks.

    • @ArnoldStafford
      @ArnoldStafford 2 หลายเดือนก่อน

      I o

  • @SWITCHMASHER
    @SWITCHMASHER ปีที่แล้ว +1

    Good video! With all that grain on the ground, they should have a good crop of wheat this years. The mow gangs are without doubt, miracle workers. My hat is off to them!

  • @frankmosch3757
    @frankmosch3757 ปีที่แล้ว +5

    The real ones are not so easily put back on the track like HO miniature trains...

  • @grumpyg9350
    @grumpyg9350 ปีที่แล้ว +1

    Great video.👏🏻👏🏻👍👍 too bad we don’t have crews like this working on our national highways. Things just might get done a little faster.

  • @3watchit
    @3watchit ปีที่แล้ว +3

    I didnt think NS ran on crappy track like this

  • @1ROB82
    @1ROB82 ปีที่แล้ว +1

    No worries! It’ll buff out.

  • @danmathers141
    @danmathers141 ปีที่แล้ว +2

    I just got to 34:00. Sorry about your ankle. You have a wonderful wife. Get better fast.

    • @therailroadtiespiker
      @therailroadtiespiker  ปีที่แล้ว +3

      Thank you and yes she's the best wife a man could have. She's done the second camera on a lot of My videos.

  • @mikes7639
    @mikes7639 ปีที่แล้ว +1

    Hind sight is also good in the stock market

  • @johndemeen5575
    @johndemeen5575 ปีที่แล้ว +2

    Just wondering, why are train I D # all ways four digits? Thanks from St. Paul Minnesota.

    • @therailroadtiespiker
      @therailroadtiespiker  ปีที่แล้ว +1

      CSX has two and Three digits on there GE locomotives not sure if there's anymore like that.

  • @peter-fuppe-fuchs
    @peter-fuppe-fuchs ปีที่แล้ว +6

    if modern USA stop using wooden ties, and modernize the railroad, this would be a rare sight.....

    • @therailroadtiespiker
      @therailroadtiespiker  ปีที่แล้ว +5

      Yes it's that they have neglected the tracks for so long it'll take forever for them to catch up.

    • @meanwolverine4573
      @meanwolverine4573 ปีที่แล้ว +3

      Rosebud coal mine in Armstrong County PA re-laid on a rail trail with steel ties and new rails milled in 2010. Mine shut down, county bought the line to revert back to trail. Contact said county for barely used rail n ties. Tourist train is located in Schenley PA, near Leechburg. There sits an Alco switcher, 1 box, 1 P&LE bay window, the open air flat, 2 more cabooses, (straight sides, no cupola).

    • @quintinivey9359
      @quintinivey9359 ปีที่แล้ว +5

      Profits vs common sense.

    • @quintinivey9359
      @quintinivey9359 ปีที่แล้ว +4

      @The Railroad Tie Spiker, they scrapped the cars? Repaired the bridge and laid jointed rail to get the line operational?

    • @therailroadtiespiker
      @therailroadtiespiker  ปีที่แล้ว +4

      @@quintinivey9359 the 3 cars that were on their side were scraped and they did lay jointed rail back down.

  • @vernonmatthews181
    @vernonmatthews181 10 หลายเดือนก่อน +1

    Didn't see any branding on the digger like Cormans, if they were rented that would be expensive.
    That vegetation has been allowed too close to the railroad corridor.
    Curious the track broke like it sheared, and the adjoining field had recently been plowed.
    I wondered about those logs whether they played any part in the sorry affair.
    Thanks for the video 📹 😮

    • @therailroadtiespiker
      @therailroadtiespiker  10 หลายเดือนก่อน +1

      I'm not sure what company this was could they have used a crew from Genesee & Wyoming ?

    • @vernonmatthews181
      @vernonmatthews181 10 หลายเดือนก่อน +1

      @@therailroadtiespiker thanks for the update.🤔🍻

    • @rockymountainjazzfan1822
      @rockymountainjazzfan1822 หลายเดือนก่อน +1

      It's Hulcher equipment and crew. Their trademark is a white oval with red lettering, visible on one of the dozers at 25:53. Their trucks can be white or red. Interesting note--the side-boom dozers (called pipelayers in the oil industry) are likely older than some of the crews operating them, dating from the 1960's-1980's. Amazing what an experienced crew with a couple of side-boom Cats and an excavator can do!

  • @davidg5369
    @davidg5369 3 หลายเดือนก่อน +1

    Do they tamp & regulate these track re-builds before passing a train over them, or does that come later!??!

    • @therailroadtiespiker
      @therailroadtiespiker  3 หลายเดือนก่อน

      That’s a great question David I know they had trains running on that line within several days of the derailment.

  • @nbk9372
    @nbk9372 7 หลายเดือนก่อน +1

    Watch RRF video of a few content creators and noticed they're showing a lot more track defects, more than usual seems like. Seen track wear, cracks, wear angling inward, break-offs on the surface rails with some as long as 3 feet, and I'm hoping the content creators are reporting the damages they record. You would think railroad maintenance chiefs would be surfing RRF's contents to be on top of some of these defects.

    • @therailroadtiespiker
      @therailroadtiespiker  7 หลายเดือนก่อน +1

      You would think... I've seen some bad track

  • @neilgarrod318
    @neilgarrod318 ปีที่แล้ว +2

    Been there more then once

  • @jeffreymartin6369
    @jeffreymartin6369 10 หลายเดือนก่อน

    That’s third world country bad! Wow. The tracks I mean. I knew a guy who fixed derailments and it’s tougher than bull riding! They often have to cut a road through the forest to GET there! They have bunker trailers with showers and beds, a chow trailer. It’s crazy hard work, sometimes a temporary rail is laid out to route trains around the wreck!

  • @deedsddd6774
    @deedsddd6774 ปีที่แล้ว +1

    im still confused on how they lifted the overturned cars like what did they do with it

    • @therailroadtiespiker
      @therailroadtiespiker  ปีที่แล้ว

      They cut these up with a torch after they emptied them out.

  • @jasonpoole2093
    @jasonpoole2093 ปีที่แล้ว +1

    So, the reason the wheels aren't attached to the trucks and the trucks aren't attached to the cars is for the purpose of making rerailing easier? You just build up the car from the rails? Fascinating.

  • @shopshop144
    @shopshop144 11 หลายเดือนก่อน

    Sortof jumped from the start of moving bits of the wreck away to having the new track in place and the crew pouring new ballast. Missed a couple of steps, like most of the work.

  • @simonetaormina7080
    @simonetaormina7080 10 หลายเดือนก่อน +1

    All that steel twisted up like it’s tin foil. Is it really cheaper to fix that as opposed to replacing tracks where needed?

    • @therailroadtiespiker
      @therailroadtiespiker  10 หลายเดือนก่อน

      Yes because they just use old track they tore up somewhere else to replace the tracks that were damaged

  • @michaelhband
    @michaelhband ปีที่แล้ว +2

    👍👍👍❤❤❤🚂🚂🚂

  • @simcaptainrik
    @simcaptainrik ปีที่แล้ว +1

    Hope you ankle is healing

    • @therailroadtiespiker
      @therailroadtiespiker  ปีที่แล้ว

      It's been almost a year but still gives me trouble when the weather gets cold.

    • @ohgary
      @ohgary 8 หลายเดือนก่อน +1

      @@therailroadtiespikercome on down to Houston. No sign of cold weather down here!😊

    • @therailroadtiespiker
      @therailroadtiespiker  8 หลายเดือนก่อน

      @@ohgary and Texas has the most train traffic in the country.

  • @allenmarvetsthewildbuck3205
    @allenmarvetsthewildbuck3205 ปีที่แล้ว +1

    Guessing the rail failed which caused derailment

  • @mikephalp7364
    @mikephalp7364 ปีที่แล้ว

    Well you forgot a critical part! The surf gang!

  • @jeffburch5903
    @jeffburch5903 ปีที่แล้ว +1

    🍻

  • @danmathers141
    @danmathers141 ปีที่แล้ว +2

    I missed the part where the cars were removed.

    • @therailroadtiespiker
      @therailroadtiespiker  ปีที่แล้ว +1

      They cut them up on site one of my videos show them in a pile by the road I didn't get them cutting them up. It was raining the day they did.

  • @Wandering_4ever
    @Wandering_4ever ปีที่แล้ว +1

    Do they throw the broken cars on a flatcar and throw all the wheel sets on a gondola ??

    • @therailroadtiespiker
      @therailroadtiespiker  ปีที่แล้ว

      No they cut the cars up and took them away in dump truck

    • @ohgary
      @ohgary 8 หลายเดือนก่อน

      I worked for a rail car company in the 1980s. We repaired a lot of wrecks which arrived in our yard “loaded” on flat cars. We did lots of covered hoppers and coal gondolas. The tank cars were sent to a plant in Texas, if I remember correctly.

  • @bill0118
    @bill0118 ปีที่แล้ว +1

    Can somebody explain to me, poor European guy, the reasons of the lack of tracks maintenance in North America ?

  • @juliussinischo3958
    @juliussinischo3958 ปีที่แล้ว +1

    They could get the cars that can not be put back on rails faster with a good pilot and Chinook helicopter.

  • @allenmarvetsthewildbuck3205
    @allenmarvetsthewildbuck3205 ปีที่แล้ว +1

    Looks like a spur line

    • @therailroadtiespiker
      @therailroadtiespiker  ปีที่แล้ว

      It's not real busy but it goes off the main line in Marion and picks up the main line in logansport about 40 miles and has six or seven customers.

  • @jeffsmith9328
    @jeffsmith9328 ปีที่แล้ว +2

    Hey joe did that with all the billions going overseas just think that money could fix rail ways and roads

    • @paultiller6766
      @paultiller6766 6 วันที่ผ่านมา

      That was supposed to be included in one of the bills that he had passed, infrastructure something.

  • @johndemeen5575
    @johndemeen5575 5 หลายเดือนก่อน

    Guess I missed most of it.

    • @therailroadtiespiker
      @therailroadtiespiker  5 หลายเดือนก่อน

      What did you miss?

    • @johndemeen5575
      @johndemeen5575 5 หลายเดือนก่อน +1

      @@therailroadtiespiker lifting up rail cars, laying new track, maybe I fell asleep. No offense intended.

  • @NS8114_Productions
    @NS8114_Productions 8 หลายเดือนก่อน

    0:14 earape

  • @vickie7490
    @vickie7490 ปีที่แล้ว +1

    Is there a reason for this derailment? The actual rail is everywhere!

  • @ChainsawNW1218
    @ChainsawNW1218 ปีที่แล้ว +2

    ChainsawN&W1218, really enjoyed seeing the cleanup and the derailment, I've filmed 2 one years ago both NS the big one,1st one was in Wytheville VA on the Bristol line aka Crescent Corridor, got there in enough time to film alot the axles and auto rack cars had derailed loaded with vehicles, and got see them using a railroad spike driver macine,machine, filmed the first train coming through 🛤.