Great explanation sir though would you mind if next time you can incomparate the generator signal point plus the selector switch for Manual auto and off
I'm appreciate what you've interpret from Papua New Guinea. But please can you explain show with your schematic diagram and real practice of how you've wire that ATS. Cheers
Please I'm a Nigerian, new to this field, currently learning it like apprentice. What i still don't understand or grab is sizing of component, most especially cable size selection. Can you kindly make a video on how to select the right size of cable to use
generator may have more than one timer that control the time of cooling, you check can the cooldown time from the controller adjust if necessary or check for cooldown timer inside ATS if any adjust.
The power cable rating usually gives you the size of a contactor, so there is no need to worry about the small components; they still control an even larger size of the contactor.
Finally you are back, welcome again, waiting for your promise about generator synchronizing
Great to see you back.
Thanks for the informative video. I would love to see a step by step video of making that circuit
You are sharing Real Knowledge
Good explanation
Wow! That's very important information
Very good well explained
Hello, could you send the wiring diagram of how automatic Transfer switches work, including the generator terminals connections
Am very proud of u , ur good am learning
Welcome back boss
Great explanation sir though would you mind if next time you can incomparate the generator signal point plus the selector switch for Manual auto and off
Yes i'll consider, Thanks for watching
Hello sir what is the role of the first relay at the Gen side
Good day, you are sharing very good knowledge here, please kindly share the circuit diagram for more understanding. Thanks
Building automatic change over switch calculation
Thank you sir
Thankyou sir
Kindly share with me who to set phase failure knobs correctly. Thanks
I'm appreciate what you've interpret from Papua New Guinea. But please can you explain show with your schematic diagram and real practice of how you've wire that ATS.
Cheers
No problem will do, thanks for watching.
Nice.
Where are you located and your contact information. I would like to learn physically
Please I'm a Nigerian, new to this field, currently learning it like apprentice. What i still don't understand or grab is sizing of component, most especially cable size selection.
Can you kindly make a video on how to select the right size of cable to use
I will add to my list, thanks for watching
You didn't explain how to wire the control circuit
if the utility power is restored and the generator continues to run for more than 30minutes, what can you do.
generator may have more than one timer that control the time of cooling, you check can the cooldown time from the controller adjust if necessary or check for cooldown timer inside ATS if any adjust.
No schematics?
i will upload schematic on the blog, thanks for watching
Building automatic change over switch calculation
The power cable rating usually gives you the size of a contactor, so there is no need to worry about the small components; they still control an even larger size of the contactor.