@jeffersonmusyoki8554 that depent on what kind of load your dealing with, in your case if 1phase detects ov/uv all phases will be shutdown regardless. my equipment however can use 3,2 and 1phase thats why i connected ov/uv relay on 2 phases. Thanks for watching though.
I suggest Yu have a class for electrical lessons, yu can help so many students...
Your work is 100% perfect.
Thank you, will think about that.
@@electreca1I would like to join electreca, how much will Yu charge me?
Great job. Pls why is the yellow phase left out.
It was left out to save money but also picked the most healthy phases out of the 3. Thanks for watching.
Nice!
Well explain. Thank you
Nice work ,thankyou
Welcome 👍Thanks for watching.
Thanks for sharing .you made the video easy to umderstand
Glad it was helpful and thanks for watching.
Thanks David. Great work.
You didnt share the schematic of the control circuit. Please do...
Thanks
Thanks for watching, i will add a link in few.
Nice but too short, good work
Dont get it ulnless its to do with power sharing tha goes on ove there ?
thankful
Thanks for watching.
Was it power that flow or voltage?..
Current flows
Why not use a 3P +N phase failure,OV/UN monitoring relay ...a timer and a 3pole single contactor rather than two each coz of cost..
@jeffersonmusyoki8554 that depent on what kind of load your dealing with, in your case if 1phase detects ov/uv all phases will be shutdown regardless. my equipment however can use 3,2 and 1phase thats why i connected ov/uv relay on 2 phases.
Thanks for watching though.
Yoo that's Terrence Crawford