Reinforced Soil System for Railways at USBRL Project in Jammu, India

แชร์
ฝัง
  • เผยแพร่เมื่อ 9 ก.ย. 2024
  • The Udhampur-Srinagar-Baramulla Railway Link (USBRL) project was undertaken by the Government of India to connect Jammu and Kashmir to the rest of the country. This 272 km long railway project, which connects Udhampur to Baramulla, will reduce travel time between Srinagar and Jammu from six hours to a mere 3.5 hours. It is considered one of the most challenging railway projects in the Indian subcontinent.
    Maccaferri provided a flexible hybrid reinforced soil (RS) structure for railways at locations 40, 41, 42, and 43 of the USBRL project. Bridges 40, 41, and 42 were constructed to support the railway embankment / formation, whereas bridge 43 was constructed just near Chenab bridge. This a first time Indian railways used reinforced soil system for such height. Maccaferri’s geosynthetic solutions were adopted over conventional solutions as they are sustainable and economical. Around 3 lakh cubic meters of tunnel muck, a site-won waste from tunnel excavation, was used to build the reinforced soil (RS) structure instead of concrete, which has helped in reducing carbon emissions and cutting costs by up to 50 percent.

ความคิดเห็น • 17

  • @yourshomearchitect.8702
    @yourshomearchitect.8702 หลายเดือนก่อน +4

    NICE PRESENATION

  • @arya-iitg1930
    @arya-iitg1930 หลายเดือนก่อน +4

    amazing shots 🤩🥰

  • @Udhampur_railfan
    @Udhampur_railfan หลายเดือนก่อน +13

    I'm from Udhampur from where USBRL originates

    • @poonamkar2503
      @poonamkar2503 หลายเดือนก่อน +1

      t

    • @poonamkar2503
      @poonamkar2503 หลายเดือนก่อน +1

      you

    • @Udhampur_railfan
      @Udhampur_railfan หลายเดือนก่อน +1

      @@poonamkar2503 ?

    • @khanbasharat
      @khanbasharat หลายเดือนก่อน +1

      Bhai 15 Aug ko reasi tak start hoga ki nhi, kya lagta ha

    • @himanshusingh5214
      @himanshusingh5214 29 วันที่ผ่านมา +1

      Abhi Election to aa nahi rahe. Ab to aaram se badiya testing karne ke baad hi start hoga. Probably before April 2025.

  • @bijojohnchacko
    @bijojohnchacko หลายเดือนก่อน +3

    Excellent 👍🏽

  • @topicone1417
    @topicone1417 หลายเดือนก่อน +5

    USBRL body should implement rope way system from higher altitude railway station to city/village of base level then its too easy to travel between them and its increase tourism and local accessibility 😊

    • @mohammadazharuddin628
      @mohammadazharuddin628 16 วันที่ผ่านมา

      how much time will it take ?

    • @topicone1417
      @topicone1417 16 วันที่ผ่านมา +1

      @@mohammadazharuddin628 i think it's should take less time than driving up hill .

  • @sanjaymakwana1302
    @sanjaymakwana1302 20 วันที่ผ่านมา

    Very nice

  • @pawankumarpandey2379
    @pawankumarpandey2379 23 วันที่ผ่านมา

    Amazing

  • @RandhirKumar-es1tc
    @RandhirKumar-es1tc 28 วันที่ผ่านมา

    😢😢😢😅😅

  • @StellaHubery
    @StellaHubery 5 วันที่ผ่านมา

    93060 Roderick Keys