Broadway Bridge Construction Timelapse
ฝัง
- เผยแพร่เมื่อ 22 ธ.ค. 2024
- To replace a deficient structure that had been in use since 1923, Garver designed a replacement bridge that features four traffic lanes and twin 448-foot basket-handle network tied arches. The twin-arch design allowed for the arch superstructures to be pre-assembled on barges and floated into place, allowing the bridge to be opened just five months after closure