How to compile a construction schedule if you are a Subcontractor

แชร์
ฝัง
  • เผยแพร่เมื่อ 20 ก.ค. 2024
  • Subcontractors will know how difficult it is to compile a construction schedule that is coordinated with the main contractor's programme.
    As a subcontractor you also know how difficult it is to prove entitlement of claims and how easily contractors bully you to take liability for delays that weren't your fault.
    In this video I show subcontractors how they can use a simple system to compile programme that dovetails efficiently with the contractor's programme.
    Best of all, this will enable you to have a lot of control, a lot more substantiating information when you claim and it'll prevent the contractor from simply shifting the blame of penalties onto you.

ความคิดเห็น • 5

  • @johncatsicas101
    @johncatsicas101 3 ปีที่แล้ว +1

    JC thanks for your series of lectures. The biggest challenge subcontractors have is the lack of expertise to formulate a credible Schedule (other than having some gut experience of their activities which is driven by Day Duration). This Duration is based on the sub-contractors allocated workers allocation. This is made worse that the main contractor's planning does not interrogate the Sub-contactors basic plan provided and the dependencies that drive schedule delay.. In other words the scheduling is not detailed enough.
    What is required is the Project Manager to sit with the Sub-contactor and examine the schedule risks

    • @JCleRouxx
      @JCleRouxx  3 ปีที่แล้ว

      Hi John. Could not agree with you more! Very true.

  • @Adam-ui3ot
    @Adam-ui3ot 2 ปีที่แล้ว +1

    This is quality.

  • @sekwatichilwane7969
    @sekwatichilwane7969 3 ปีที่แล้ว

    Informative 🤞🏿

  • @nazirramguthee6568
    @nazirramguthee6568 11 หลายเดือนก่อน

    Hey JC, what is the document you presented in the last section called?