Commercial Pre fab - steel building 30*30 g+1 with composite slab
ฝัง
- เผยแพร่เมื่อ 23 ส.ค. 2024
- +91 9842012175
+91 9790277453
Welcome to Tiruppur engineering works service available southern part of india 🇮🇳*, Official Instagram page ... 🏠
*AMEER SOHAIL M *
(Head of Sales & Marketing)
tiruppurengine...
TH-cam : / @tiruppurengineering
FACEBOOK : / tirupurengineeringworks
Pinterest Id Link; pin.it/6qeszcP
*Email ID*: tiruppurengineeringworks@gmail.com
Follow us on instagram ...
Both advantages and disadvantages
1. Speed of Construction: Prefab buildings are constructed off-site in controlled environments, which can speed up the construction process significantly compared to traditional on-site construction methods.
2. Cost Savings: Prefabrication can lead to cost savings due to reduced labor costs, shorter construction times, and better material management.
3. Quality Control: Construction in a factory setting allows for better quality control as the process is closely monitored, leading to fewer defects and errors.
4. Environmental Benefits: Prefabrication often produces less waste and can be more environmentally friendly due to better material optimization and reduced transportation emissions.
5. Flexibility: Prefab buildings can be easily customized to suit specific requirements and can be designed to be energy-efficient and sustainable.
Disadvantages:
1. Design Limitations: Prefabricated buildings may have limitations in design flexibility compared to traditional construction methods, especially for complex or unique architectural designs.
2. Transportation Costs: Transporting prefabricated modules to the construction site can incur additional costs, especially for long distances or when dealing with oversized components.
3. Site Access and Assembly: Site access and assembly of prefabricated components can be challenging in certain locations or terrains, which may require specialized equipment or infrastructure.
4. Maintenance Issues: Some prefab materials may require specialized maintenance or repairs over time, potentially leading to higher long-term maintenance costs.
5. Perception and Stigma: Despite advancements in technology and design, there can still be a stigma associated with prefabricated buildings, leading to potential resistance from clients or communities.
Can decking sheets concreting be done on concrete pillars for first floor of building, or only on steel pillars?
Part 2 video share brother
Not started bro only wall work finished
We want to know more but its difficult to understand because of language barrier... please can you add subtitles
Sure we will add it
Same 30 x 30 how much price in total
Contact 9842012175 9790277453 for quotation marks
Mesh concrete wall load thanguma?
Yes bro it will
Share this Tindivanam site location sir.
Sure sir it is in highway near Aryas hotel sir
Gardar lam enna brand TATA structura va illa enna brand...
Yes sir
Veedu video po dunga pls
Sure, sir, Cuddalore house 🏠 is on processing. Once finished, we will upload it
How much cost 26*30 feet g+1
9842012175 9790277453
How much cost
Depends on plan sir contact us for best prices 9842012175 9790277453