[Tunnel Strengthening Works] SMRT C830 PV21 from CC7 Mountbatten [B] to CC6 Stadium [A]

แชร์
ฝัง
  • เผยแพร่เมื่อ 29 ธ.ค. 2023
  • Recorded on 11 June 2023.
    Due to Tunnel Strengthening works, mainline train services on the Circle Line was shortened to Stadium instead of Dhoby Ghaut from 9pm onwards on selected days daily.
    Mainline trains during the works had to utilise the Stadium Sidings (which is used to turnaround Marina Bay shuttle trains). This was a good chance to ride through the siding by a service train as the siding is not passenger-accessible on other days.
    Attention to all viewers!
    We have a Facebook and Instagram accounts!
    Please click the provided links down below and remember to “Like” our posts and “Follow” us!
    Facebook : / c151adventurer
    Instagram : / smrt151adventurer
    Telegram (encouraged to join here) : t.me/c151adVentUreR
    Subscribe to us as C151Adventurer!
    / @c151adv
    No duplication of this video.
  • ยานยนต์และพาหนะ

ความคิดเห็น •