Thai House Build Week 9 - Main Floors & Columns

แชร์
ฝัง
  • เผยแพร่เมื่อ 19 ก.ย. 2024
  • ‪@RetiredTranquilinThailand‬ - Week 9 is about the installing concrete floor planks, pouring the floor slab & then installing upright rebar column formwork & filling with concrete. What is the 7 day rule? Find out in the video. No video for week 10 - as the team is off for 7 days. Next video about 1 July.

ความคิดเห็น • 3

  • @warrencombes8256
    @warrencombes8256 2 หลายเดือนก่อน +2

    Good vid

  • @rimzalia1362
    @rimzalia1362 3 หลายเดือนก่อน +1

    They will weld metal plates on top of each column rebar before putting the roof beams and trusses.
    That will leave air gaps around the rebar and metal plates which are prone to corrosion. To avoid that; demand your contractor to fill that air gap with Non-Shrinks Grout cement till it is above the top face of those metal plates.

    • @RetiredTranquilinThailand
      @RetiredTranquilinThailand  3 หลายเดือนก่อน +1

      Thanks for the feed back - would anti corrosive paint/solution work as an option