@abeer's Channel Hi, do you mean 2 Westgard rules violations on the same day? It depends on how many levels of control you are using. For example, if the level 1 control falls outside the +2s, then the level 2 control also falls outside the +2s, then both levels will be read as having a 22s violation. So that must be rejected.
There are a lot of phases/steps to consider for QC validation. You can refer to this video for added discussion: th-cam.com/video/gUfclzC6Q-U/w-d-xo.html
Fave vlogger
If we have 2 rules of the same day we reject the 2 control values?
@abeer's Channel
Hi, do you mean 2 Westgard rules violations on the same day?
It depends on how many levels of control you are using.
For example, if the level 1 control falls outside the +2s, then the level 2 control also falls outside the +2s, then both levels will be read as having a 22s violation. So that must be rejected.
thank you.
🙏🙏🙏🙏
THANK YOUU MAAM
Thank u also :)
How to validate quality control ?
There are a lot of phases/steps to consider for QC validation. You can refer to this video for added discussion: th-cam.com/video/gUfclzC6Q-U/w-d-xo.html