7 year old new construction with Diamond kote over LP siding and it’s chalking and fading badly, their warranty was giving me 12 gallons of paint that I have to apply
Great question Rock! There needs to be a minimum of 1 inch clearance between the bottom of the siding and a hard surface such as asphalt or concrete. Clearance from grass or mulch for example should always be a minimum of 6 inches. Hope this helps!
3rd and 4th rows down have the lines too close
7 year old new construction with Diamond kote over LP siding and it’s chalking and fading badly, their warranty was giving me 12 gallons of paint that I have to apply
Cari, please continue working with your Claims Representative. They are available for any questions you have regarding your claim.
Can this go directly over painted cedar that is flat, not shake
what size top trim board is used in the video for the board and batten? Is it a 5/4 board and if so did you use the 1" drip cap for it
You are correct. A 5/4 trim board was used with a 1" drip cap.
What color is the board and batten and lap siding behind you in the video?
Thank you for your question. The color shown is no longer part of our color offering.
How is the squad charged?
How much clearance between asphalt and LP Smartsuite should there be?
Great question Rock! There needs to be a minimum of 1 inch clearance between the bottom of the siding and a hard surface such as asphalt or concrete. Clearance from grass or mulch for example should always be a minimum of 6 inches. Hope this helps!