Amtrak Lake Shore Limited Detour on the New Haven Line

แชร์
ฝัง
  • เผยแพร่เมื่อ 20 ส.ค. 2024
  • On the early morning of October 22nd, 2023, Amtrak P42DC #100, painted in "Midnight Blue", leads Extra 100 west down the Metro-North Railroad New Haven Line with a detoured "New York section" of Lake Shore Limited train 48(20). The train was unable to reach New York Penn Station due to a washout in Scarborough which halted all service on the Hudson Line. Instead, the train was sent to Boston South Station in Massachusetts with the "Boston section". Passengers were then transferred to the last westbound Regional of the night and the "NY section" consist was sent down as a non-revenue move to Sunnyside Yard in Queen, New York.
    In the video, the train is seen passing by Bridgeport station, Stamford station and CP 229 (Green Tower, Greenwich) in Connecticut and Mamaroneck station in New York.
  • ยานยนต์และพาหนะ

ความคิดเห็น • 8

  • @amtrakandcsxrailfanning351
    @amtrakandcsxrailfanning351 6 หลายเดือนก่อน

    Awesome catches caching hertige 100 on this limited

  • @railfannerjs6308
    @railfannerjs6308 10 หลายเดือนก่อน +2

    It’s not rare to see any of those, but to see a full consist in one, mad rare!
    New Haven line has the special special.

  • @connecticutmultimodaltrans8226
    @connecticutmultimodaltrans8226 10 หลายเดือนก่อน +2

    wow, awesome catch!! too bad they had the passengers change to the regional with worse seats and no sleeper or checked baggage. I wonder if they could've sent it SPG-NHV-NYP

    • @greaternyrailfan
      @greaternyrailfan 10 หลายเดือนก่อน

      then where would the boston passengers go lol

    • @connecticutmultimodaltrans8226
      @connecticutmultimodaltrans8226 10 หลายเดือนก่อน

      Could've split in SPG

    • @greaternyrailfan
      @greaternyrailfan 10 หลายเดือนก่อน

      @@connecticutmultimodaltrans8226💀

    • @alanbutler2417
      @alanbutler2417 10 หลายเดือนก่อน

      I'm guessing that the Boston section stayed in Boston.

    • @nasanierulastname2997
      @nasanierulastname2997 9 หลายเดือนก่อน

      @@connecticutmultimodaltrans8226I’m just speculating but it’s possible the engineer was too close to timing out among other logistical issues (like getting a locomotive and a driver) to allow a split at Springfield