How to backfill & pour new concrete in a basement floor?

แชร์
ฝัง
  • เผยแพร่เมื่อ 20 ต.ค. 2024

ความคิดเห็น • 82

  • @luisarashirovideo
    @luisarashirovideo 2 ปีที่แล้ว +9

    The best fill job I've seen here so far

  • @josephthao4456
    @josephthao4456 7 หลายเดือนก่อน +2

    Thank you for this video. Now i have a better understanding of back filling plumbing.

  • @annmarie443
    @annmarie443 28 วันที่ผ่านมา

    Your explanation makes me feel like I can do it. Thanks!

  • @flybike2210
    @flybike2210 ปีที่แล้ว +3

    Thank you for sharing this video of your project Mustafa. My favorite part is the part where you are compacting the soil in the trench with your feet in time lapse. Exactly how I did it but more fun.

    • @renovationschool8818
      @renovationschool8818  ปีที่แล้ว

      🤣🤣 thanks for watching
      , i wonder how yours turned out?

  • @patrickleigh1523
    @patrickleigh1523 11 หลายเดือนก่อน +1

    I like the garden hose on the compacted area. It also rinses a little more dirt down around those bigger rocks. If sand is available, it is perfect.

  • @RyanTowner-vx2gs
    @RyanTowner-vx2gs ปีที่แล้ว +2

    Super helpful! Thank you for this video series. I'm installing my basement bathroom plumbing today.

  • @lereveure
    @lereveure ปีที่แล้ว +1

    You are a very good communicator and your videos are well structured and clear. Kudos to you!

  • @jacobgrubb1034
    @jacobgrubb1034 หลายเดือนก่อน +1

    Great video. Just what I was looking for

  • @woodwisdomnonsenseandcats4203
    @woodwisdomnonsenseandcats4203 ปีที่แล้ว

    Thanks! I have a small recess around my shower drain that I need to fill in before putting the pan in. It was hard to find a video on filling holes I kept getting results for crack repair. This is exactly what I needed. Thanks again!

  • @federoffm
    @federoffm ปีที่แล้ว

    Fantastic! Kept me from going in the wrong direction!

  • @Airbender24B
    @Airbender24B ปีที่แล้ว +1

    Thanks for the video renovation school. I was wondering if you could explain why it is ok for the concrete to contact the toilet drain/flange but not the shower drain...

    • @renovationschool8818
      @renovationschool8818  ปีที่แล้ว +1

      Thanks for watching
      We installed a shower base later and the bottom of the drain on the shower pan needed some room to connect with the plumbing that's why it's left the way you saw it in the video. I left that flower pot so that I have a bit of room for the bottom of my shower drain.

  • @frankly2677
    @frankly2677 ปีที่แล้ว +2

    Wow exactly what i needed and good words of encouragement, thanks!

  • @smsteger89
    @smsteger89 10 หลายเดือนก่อน +2

    You shouldn't use large chunks of stone or concrete for fill. They don't move well and can cause cracking

  • @renovationschool8818
    @renovationschool8818  2 ปีที่แล้ว

    thank you for watching this video.

  • @poop80016
    @poop80016 ปีที่แล้ว

    Thanks, lots of little tips and insights into this process!

  • @jimoesterwind5056
    @jimoesterwind5056 2 ปีที่แล้ว

    Thanks so much! I plan on doing this to my own basement. However, I need to install an ejector to kick sewage out. But this is really helpful.

    • @renovationschool8818
      @renovationschool8818  2 ปีที่แล้ว +1

      Thanks for watching the video
      The process is easy and every job is different. You get the idea. I have a lot of new videos coming explaining how to finish a basement and save time and money so please subscribe to the channel if u are interested.😊

    • @jacobgrubb1034
      @jacobgrubb1034 หลายเดือนก่อน

      Same for me. Also I was looking to see type of concrete to use. Now I know.

  • @cobuck4007
    @cobuck4007 2 หลายเดือนก่อน

    Love your videos!

  • @stix1904
    @stix1904 7 วันที่ผ่านมา

    A quick question: I went to HD and there are a lot of different concrete mixes. Is this sand topping mix strong enough? I asked the person there and they said it was fine but just wanted to ask here too - the last thing I want are some structural issues happening down the road because I used the wrong mix.

    • @renovationschool8818
      @renovationschool8818  7 วันที่ผ่านมา

      It's totally fine for this.
      But if you are gonna build 2 stories on it no

    • @stix1904
      @stix1904 7 วันที่ผ่านมา

      @renovationschool8818 thanks for the quick answer. My concrete is 3" thick and on this it says up to 2" thickness that's what made me suspicious.
      Edit: I'm a total beginner, so please educate me about this

    • @renovationschool8818
      @renovationschool8818  7 วันที่ผ่านมา +1

      @stix1904 you will be totally fine .

  • @antaholics
    @antaholics ปีที่แล้ว

    I may have missed a previous video, but why did you transition from ABS to PVC and then back to ABS again? Why not just use ABS for all of it?

    • @renovationschool8818
      @renovationschool8818  ปีที่แล้ว +3

      Thanks a lot for watching
      We live in Canada and abs pipes are extremely expensive.
      The building code allows us to use PVC underground
      Anything above ground has to be abs. By using 4-in PVC pipes I saved about $400 in the price of my supplies.
      As you mentioned I could definitely do the whole thing using ABS pipes.

  • @MrRustyjackson
    @MrRustyjackson ปีที่แล้ว

    Thanks for the tips! How do you estimate how many bags of concrete you needed? How many for this project?

    • @renovationschool8818
      @renovationschool8818  ปีที่แล้ว +1

      No worries
      Thanks for watching😊
      If u go around 3 inch thick every bag go about 3 squar feet area
      It's always better to have some extra.

  • @jwd215
    @jwd215 ปีที่แล้ว

    I would finisg with concrete with crushed gravel. Nice work 👍🏿

  • @amjadjaki
    @amjadjaki ปีที่แล้ว

    I have a question how much Toilet flange b must be above the ground ? Or it should be under flash with floor?

    • @renovationschool8818
      @renovationschool8818  ปีที่แล้ว

      Should be at least level with the finished floor
      But it's best if it sets about a quarter of an inch or 3/8 above the finished floor

  • @denisq6194
    @denisq6194 หลายเดือนก่อน

    Hi there ,I thought that u need Cement to fill back??I mean Not Sand mix cement??? Is that Ok??Thank you.I mean is that cement ok ,I thought that is for fill in between Brick and stuff.

    • @renovationschool8818
      @renovationschool8818  หลายเดือนก่อน

      We use mortor to fill the gap for bricks
      This sand mix concrete and perfect for this application.
      And goes on extremely smooth and nice.

  • @johng9562
    @johng9562 ปีที่แล้ว

    Very nice work

  • @Unikhorne88
    @Unikhorne88 6 หลายเดือนก่อน

    Very helpful

  • @Familia13508
    @Familia13508 ปีที่แล้ว

    Awesome job

  • @mikepatton1873
    @mikepatton1873 10 หลายเดือนก่อน +1

    I would have used all gravel no dirt. 6 inches of gravel on all sides of the pipe as I.P.C. And A.P.C. Requires. Just get rid of the dirt in this scenario.

  • @cclifestudio8021
    @cclifestudio8021 2 ปีที่แล้ว

    GOOD JOB!!

  • @thomaskelly5354
    @thomaskelly5354 ปีที่แล้ว

    how do you cure the concrete afterwards?

    • @renovationschool8818
      @renovationschool8818  ปีที่แล้ว +1

      With magic.
      What do you mean cure the concrete?! It will dry and cure by its self.

  • @joshscott8678
    @joshscott8678 ปีที่แล้ว

    No sand, rebar, mesh, or plastic vapor barrier?

    • @renovationschool8818
      @renovationschool8818  ปีที่แล้ว

      You didn't see the sand I put in?
      It's not a driveway to need rebar or mesh.

    • @jimmysimwanza5886
      @jimmysimwanza5886 ปีที่แล้ว

      Do you put vapour barrier?

    • @toddgilligan
      @toddgilligan 3 หลายเดือนก่อน

      Yep, were is the vapour barrier?

  • @berniel3358
    @berniel3358 2 หลายเดือนก่อน

    No,no,no big pieces of cement rocks are just not recommended because you will have air pockets where the cement or gravel wont go in .

  • @joeplis1
    @joeplis1 ปีที่แล้ว

    Where is the next video of this area , thanks

  • @carolglenn4054
    @carolglenn4054 2 ปีที่แล้ว

    Thankyou

  • @buddyh5978
    @buddyh5978 7 หลายเดือนก่อน

    Wheres the vapor barrier??

  • @spicytranslations9604
    @spicytranslations9604 ปีที่แล้ว

    This is what it looks like. Not this is how it looks like.

  • @bigbishop9081
    @bigbishop9081 ปีที่แล้ว +4

    That's great until an inspector fails the entire job for using those big ass uneven slabs of concrete for support instead of pea-stone or sand. Glad I work in a state that doesn't allow hack jobs. Take some pride in your work

    • @renovationschool8818
      @renovationschool8818  ปีที่แล้ว +1

      LOL thanks for watching 😊

    • @lereveure
      @lereveure ปีที่แล้ว +1

      @@renovationschool8818 That's a good example of someone having difficulties communicating in a positive way. Courage my friend

    • @renovationschool8818
      @renovationschool8818  ปีที่แล้ว +1

      @@lereveure for god sakes when was the last time an inspector showed up for backfill anyway???? what the guy calls" big ass uneven slabs" are broken pieces of concrete and they secure the pipes just like making a foundation for it. we have a lot of people who just know how to comment only. if by any means this mr american is so good please make a video and teach us all how to do it the right and american way!!! show us the right way MR Not HACK!!!
      can you communicate with someone being that disrespectful and full of himself ???? someone who thinks he knows too much!!!

    • @briansegall1084
      @briansegall1084 ปีที่แล้ว +3

      How is an inspector going to see what's under the slab?

    • @renovationschool8818
      @renovationschool8818  ปีที่แล้ว +1

      @@briansegall1084 does the inspector come after concrete is done to to see what's under it in US????
      Right when everything is open and the pipes are completely visible they come and see it
      After they left I poured the concrete!! They saw what they needed to see.
      There is no code indicating how to pour concrete or what exactly to back fill with.

  • @spicytranslations9604
    @spicytranslations9604 ปีที่แล้ว

    Underneath the pipes not underneath OF the pipes. You don't need 'of' in that sentence.

  • @blackpillrising3164
    @blackpillrising3164 ปีที่แล้ว

    nice work