✔ DiResta Crown Royal

แชร์
ฝัง
  • เผยแพร่เมื่อ 21 ม.ค. 2025
  • This is a mobile bar is designed to be assembled on location. It breaks down into 6 large rolling crates. David Waelder and I built this from white oak, hard wood and veneered ply. This video covers the 3 weeks it took to build this unit. The finish was minwax water poly in semi gloss. Please Like Comment Share Subscribe and Enjoy!! Note This video ends at 17:45. the rest is black, the logo got dragged too long sorry it was late.

ความคิดเห็น • 650