Wind Turbine external break switch How to produce an external (manual) break switch for wind turbines and wind charge controllers. By the way. You will finde the switch here as an example: amzn.to/3S8gqWU
Great stuff, vey helpful! Do you know how to add an automatic dumpload? For example if you are charging a battery and the battery is full the wind tubine power is auto diverted to a dump load at the full voltage of the battery to protect the battery and then back to the battery when it needs charging again
1. could i use 1 dump load resistor, by connecting one wire of the resistor to the middle terminal and the other wire to both the left and right terminals on the isolator switch 2. will the dump load resistor completely brake the turbine? 3. can the turbine remain connected to the controller whilst being shorted/braked 4. can the dump load resistor remain connected to the controller whilst being used as a brake with an external isolator switch?
where or from which site did you order the windmill and the other parts?. On another video I saw a link to "Fast Trading LTD" is everything ordered and delivered through that?
Hi It depends on the item. I got the Ista Breeze turbine an ISTA charge controller from ISTA breeze direct: istabreeze.store The Chinese turbine from here: s.click.aliexpress.com/e/_DDsyrhf The "blue" Hybrid Charge controller from: s.click.aliexpress.com/e/_DBBZ5Wt The switch here: amzn.to/3S8gqWU The CD XY 60: amzn.to/3KrA9PB Rectifier: amzn.to/3E5XfXO And last but not least, the LifePo4 Rack battery 24Volt: s.click.aliexpress.com/e/_DBlDltR and 48Volt: s.click.aliexpress.com/e/_DcI0Ued I hope that helps a bit.
Great stuff, vey helpful! Do you know how to add an automatic dumpload? For example if you are charging a battery and the battery is full the wind tubine power is auto diverted to a dump load at the full voltage of the battery to protect the battery and then back to the battery when it needs charging again
1. could i use 1 dump load resistor, by connecting one wire of the resistor to the middle terminal and the other wire to both the left and right terminals on the isolator switch
2. will the dump load resistor completely brake the turbine?
3. can the turbine remain connected to the controller whilst being shorted/braked
4. can the dump load resistor remain connected to the controller whilst being used as a brake with an external isolator switch?
Could you add two switches? A soft dump load and a full "short" brake? Switch the soft then the full brake?
where or from which site did you order the windmill and the other parts?. On another video I saw a link to "Fast Trading LTD" is everything ordered and delivered through that?
Hi
It depends on the item.
I got the Ista Breeze turbine an ISTA charge controller from ISTA breeze direct:
istabreeze.store
The Chinese turbine from here: s.click.aliexpress.com/e/_DDsyrhf
The "blue" Hybrid Charge controller from: s.click.aliexpress.com/e/_DBBZ5Wt
The switch here:
amzn.to/3S8gqWU
The CD XY 60: amzn.to/3KrA9PB
Rectifier: amzn.to/3E5XfXO
And last but not least, the LifePo4 Rack battery 24Volt:
s.click.aliexpress.com/e/_DBlDltR
and 48Volt:
s.click.aliexpress.com/e/_DcI0Ued
I hope that helps a bit.
thnx for the information! that gives just a little more insight (I will also do this with my videos in the future).
❤
❤