Strong Column & Weak Beam Concept

แชร์
ฝัง
  • เผยแพร่เมื่อ 3 พ.ค. 2019
  • This videos shows the concept of strong column and weak beam.
    Subscribe our channel for more civil engineering videos.
    / civilengineeringonlyci...
    #strong #column #weak #beam

ความคิดเห็น • 16

  • @basavarajkv7091
    @basavarajkv7091 4 ปีที่แล้ว +1

    Excellent & superb video, giving full information which is enough as for as new owner's are concerned, who are less aquinted with these civil engineering aspects.

  • @SurajSinghTomarArya
    @SurajSinghTomarArya 5 ปีที่แล้ว +1

    Keep up the good work. Very Informative for aspiring builders/engineers.

  • @CBEntertainment
    @CBEntertainment 4 ปีที่แล้ว

    Sir 3story building keliye 10*12 coloumn size sahi rahega kya ?? 6 piece of 16mm rod diya he... Coloumn to coloumn distance 12 feet.... Kuch TH-camr keh raha he 3 story keliye 10*16 or 9*15 ke coloumn size hona chahiye... 10*12 sirf 2 story bana sakte he... Maine already 2 story bana suka hu... Now i'm thinking for the 3rd slab... Mistry bola kuch nehi hoga aap bana sakte he... Kuch problem hoga kya... I'm confused...🤔🤔 Please reply....

  • @jangchubpeldon9176
    @jangchubpeldon9176 4 ปีที่แล้ว

    The main requirement of the seismic design of the reinforced concrete structure is strength of column should be always more than
    the strength of beam.In this case, I found that the strength of column beam ratio is different in different
    Country's design codes.For instance the ratio is 1.3 as per ACI and 1.2 as per Eurocode.What
    could be the reason behind the existence of different values? Thank you

  • @nareshkumar6439
    @nareshkumar6439 3 ปีที่แล้ว

    Nice video. In our case our foundation concrete testing results failed and hence our structural eng suggested for greater beam (more strength) replaced with plinth beam.
    After watching ur video , i am
    Confused. Pls clarify if plinth or greater beam can be stronger ? And beam above ground level is what should be weak as per your lecture ?

  • @mawkishrich3851
    @mawkishrich3851 2 ปีที่แล้ว

    Sir, we are building a 2-storey house and the schedule of columns are 4 (16 mm steel bars) and 2 (12 mm steel brs), the schedule of beam is 4 (16 mm)?is that okay? The steel.of.the beam used are heavier than the columns?

  • @PankajSingh-me4th
    @PankajSingh-me4th ปีที่แล้ว +1

    Too gods

  • @civilideas1925
    @civilideas1925 3 ปีที่แล้ว

    👍🏻

  • @user-ct9xl6td1k
    @user-ct9xl6td1k 5 ปีที่แล้ว

    Super super super

  • @festusajayi8917
    @festusajayi8917 ปีที่แล้ว

    Purpose is to ensure that failures are localized

  • @born2die688
    @born2die688 5 ปีที่แล้ว

    Rating 4.5 for 5