Building the RV10 - Video 10 - Elevators (April 2022)

แชร์
ฝัง
  • เผยแพร่เมื่อ 30 ม.ค. 2025

ความคิดเห็น • 4

  • @jetblastjim
    @jetblastjim ปีที่แล้ว +2

    Great video. Definitely going to watch how much pro seal I put on

  • @timjohnson1578
    @timjohnson1578 11 หลายเดือนก่อน +1

    Love this idea of setting the trailing edge wedge. I know the metal you are working with and as a commercial airliner sheet metal guy your results are impressive !

  • @DavidMuroII
    @DavidMuroII ปีที่แล้ว +1

    Did you get to cutting the lead counterweights? If so curious what you used to trim the bottom to 1/32.

    • @buildingthe10
      @buildingthe10  ปีที่แล้ว

      I have the lead counterweights done, yes; I shaped them with a flat curved tooth file, I believe. What is the 1/32 thing you are talking about (it's been a while since I did this)?