DART Green Line Breaks Pantograph & Catenary | Aftermath & Repairs - September 22, 2024

แชร์
ฝัง
  • เผยแพร่เมื่อ 27 ต.ค. 2024

ความคิดเห็น • 4

  • @tonymento7460
    @tonymento7460 6 วันที่ผ่านมา +1

    I remember those days of taking down the wire on the MBTA Blue Line on the Green Line we had 2 Boeing LRV’s that still had trolley poles on them so we could recused LRV ‘s that took down the wire those cars with the trolley poles were # 3400 and # 3402

  • @starprof
    @starprof 20 วันที่ผ่านมา +4

    This is extremely interesting! First time I have seen repairs to a catenary system. Captions are excellent in content but are on-screen too briefly. The camera work needs a little improvement, that is, it would be better with less frequent pans and zooms.

    • @dfwrproductions
      @dfwrproductions  20 วันที่ผ่านมา

      Thank you for the feedback! I do try to make the captions at least 2 seconds duration during editing, especially the longer ones. About the camera work, I usually film both with a tripod and handheld, but most of the time there's not much of a difference. From what I remember this was entirely handheld as I was moving a lot and couldn't set up a tripod. I have been improving for a while but like you said I could work on less pans and zooms. Thanks for watching!

    • @starprof
      @starprof 20 วันที่ผ่านมา +1

      @@dfwrproductions Enjoyed it for sure! Especially the close-up detail of the lineman working on the hangers. Also the scene where the truck got on the rails at the road crossing.