Machining a 48" Foster Featherweight Straight Edge

แชร์
ฝัง
  • เผยแพร่เมื่อ 6 ต.ค. 2024
  • I machine a customers camel back straight edge in preparation for him to scrape it flat. In the video I erroneously referred to it as a level.

ความคิดเห็น • 16

  • @fredhoyt6900
    @fredhoyt6900 หลายเดือนก่อน

    When I was an apprentice learning the boring mill, my journeyman told me to keep the spindle when running at lunch etc.
    Now I understand why.
    Thank you.

  • @KevinToppenberg
    @KevinToppenberg 11 หลายเดือนก่อน

    Thanks for giving your considerations as you machined this. I'm thinking about doing similar job. Thanks!

  • @fredhoyt6900
    @fredhoyt6900 หลายเดือนก่อน

    I agree with using the jackscrews with points.

  • @Rustinox
    @Rustinox ปีที่แล้ว +3

    I would never have thought that the spindle gets longer while running. But, of coutse, it makes perfect sense.

    • @hmw-ms3tx
      @hmw-ms3tx  ปีที่แล้ว +3

      Hello Rusty. It turns out, that being 48" long, the boring spindle grows .0003" for every degree Fahrenheit of temperature increase. It would only have to warm up by .0025/.0003 = 8.3 degrees to increase the .0025" I saw. Ken

  • @stevechambers9166
    @stevechambers9166 ปีที่แล้ว +1

    Wow you’ve got to be happy with that. all the time and work rebuilding that machine was well worth it 👍👍

    • @hmw-ms3tx
      @hmw-ms3tx  ปีที่แล้ว +1

      Yes, very much so. I could have put the same amount of work in and had a dud (from an accuracy point of view). Thanks, Ken

  • @outsidescrewball
    @outsidescrewball ปีที่แล้ว +1

    Interesting….curious how you would produce an estimate for a client or just straight T&M and an open client checkbook,,,,thanks for sharing/discussing setups

  • @swanvalleymachineshop
    @swanvalleymachineshop ปีที่แล้ว +1

    Nice one Ken . Great point with the spindle temp . Your boring mill seems to be holding great tolerances . Do you know if the casting has been stress relieved ?

    • @hmw-ms3tx
      @hmw-ms3tx  ปีที่แล้ว +2

      Thanks Max. My customer did some preliminary scraping on the angled surface. Although the scraping is incomplete and he would have to finish it to be sure, he estimated that it was likely holding flat to a bit less than a thou over 48". I'm very happy with that. My customer stated that the casting had been stress relieved once. Ken

    • @swanvalleymachineshop
      @swanvalleymachineshop ปีที่แล้ว +1

      @@hmw-ms3tx Great result . Even temperature change over that length , i guess would have an effect . 👍

  • @wheelitzr2
    @wheelitzr2 ปีที่แล้ว

    I just bought a 24" and 36" straight edge castings but can't seem to find time to work on them.. I'm jealous.

  • @danf6070
    @danf6070 ปีที่แล้ว +1

    I'm excited to finally see the machine in action. Do you have any theories as to why you still got some measurable difference after letting the machine warm up? It seems like there's something consistently different about the first third of the machining path, maybe in the gib or something? I know you rebuilt the machine so I'm curious where the error is coming from.
    Also, are there detents for rotating the table to common angles and, if so, how accurate are they?
    Thanks.

    • @hmw-ms3tx
      @hmw-ms3tx  ปีที่แล้ว

      I'm not sure why it still had a movement of .0005" in the first third of the cut. At 48" long the boring spindle would grow .0003" for every degree Fahrenheit increase in temperature. It is possible that the small amount of extra power to take the cut caused the boring spindle to increase in temperature by .0005/.0003 = 1.67 F in the first third of the cut. You can see why temperature control becomes the dominant variable at high tolerance levels. There is an indexing pin and four sockets for it to register in. This allows you to index the table every 90 degrees. I haven't tried to measure the accuracy yet but it appears to be very good. Ken

  • @hilltopmachineworks2131
    @hilltopmachineworks2131 ปีที่แล้ว

    Nice. 👍