Def thanks many I have this machine at my job I’m having low water flow across my evaporator. Taking that plate off was a pain for me definitely thank you for this 👏🏽👏🏽👏🏽
@@IceMachine411 I tried to remove the trough the way you did it in this video but I removed the bin first then it was super easy! I didn't realize that I couldn't just use a 3/8" deep socket with a ratchet attached. I had to use an extension to reach, otherwise the ratchet would be obstructed by the aluminum piece that holds the rod in place. Try it, I didn't run into any problems by removing the bin first. When I reinstalled everything, I installed the trough first, then the bin. I did have to carefully maneuver the bin to clear the rod and ensure the two screws in the back also align, still only took about a minute.
I hope to see some Manitowoc and HOSHIZAKI or even Scotsman cleaning and preventive maintenance in near future. Very informative usual great job great video. Thank you from Philippines
Literally worked on one of these today. Had not worked one prior and this video will help me when my replacement pump comes in, plus cleaning
This is exactly why I made the video. Glad it helped.
Def thanks many I have this machine at my job I’m having low water flow across my evaporator. Taking that plate off was a pain for me definitely thank you for this 👏🏽👏🏽👏🏽
You’re welcome.
@@IceMachine411most definitely man
Your videos are a technicians master class. I appreciate your time and effort in making them.
I think so too. He’s very good
I appreciate your kind words!
Thanks for the video man helped me out alot
Awesome! That’s the plan!
Very nice work.
💪🛠️
Ice machine super tech
Hardly.
Proud of that 3/8” nut driver ? 😉😊 worst part of that job is the water tray. Grrr. Nicely done!!! You rock!😎
There’s gotta be an easier way!
@@IceMachine411 I tried to remove the trough the way you did it in this video but I removed the bin first then it was super easy! I didn't realize that I couldn't just use a 3/8" deep socket with a ratchet attached. I had to use an extension to reach, otherwise the ratchet would be obstructed by the aluminum piece that holds the rod in place. Try it, I didn't run into any problems by removing the bin first. When I reinstalled everything, I installed the trough first, then the bin. I did have to carefully maneuver the bin to clear the rod and ensure the two screws in the back also align, still only took about a minute.
Great video! Using this to clean my company’s machine. Thanks!
Awesome! Hope it’s helpful.
I hope to see some Manitowoc and HOSHIZAKI or even Scotsman cleaning and preventive maintenance in near future. Very informative usual great job great video. Thank you from Philippines
I’ll do what I can. There are a couple of those videos on my channel.
Some good information in there. Thanks
Glad it helped.
Great Video. Thank you for sharing. How many time in 1 year ice machine need to be clean ?
🤜. Manufactures recommend every 6 months.
👍👍👍
🫡