Building a Pad #54: Some tips and advice on how I build a foundation pad.

แชร์
ฝัง
  • เผยแพร่เมื่อ 30 ก.ย. 2024

ความคิดเห็น • 29

  • @jerpulliam
    @jerpulliam ปีที่แล้ว +6

    Probably the best excavation advice I’ve ever received for building a house.
    A lot of ppl just show what there doin instead of explaining the thought process

    • @shamrockdirtwork7945
      @shamrockdirtwork7945  ปีที่แล้ว

      I appreciate the feedback.

    • @jerpulliam
      @jerpulliam ปีที่แล้ว

      @@shamrockdirtwork7945 Your welcome and thanks for the information.

  • @JeremyDietch-n7k
    @JeremyDietch-n7k 29 วันที่ผ่านมา

    Been watching ALOT of excavation videos down right teaching video! hope to see more of this style.

  • @rudysconstruction
    @rudysconstruction 3 ปีที่แล้ว +4

    Thank you so much for posting this, can’t beat this advice & knowledge, great job! Looking forward to more of your videos!

  • @landproservices7008
    @landproservices7008 2 ปีที่แล้ว +1

    Your truck and trailer set up and philosophy of having all your equipment with you is exactly like mine. I roll with a single axle Pete with a 46’ Viking trailer with mulches heads on my skid steer and my excavator with the extra buckets and grapple up on the top deck of the trailer.

  • @TF856
    @TF856 2 ปีที่แล้ว

    Oh no!
    Not another music video!

  • @Xbox360Rules00
    @Xbox360Rules00 3 ปีที่แล้ว

    Hi, now that you leveled the field, is it going to be topped with fill dirt, or that is later and next is digging for the stem wall and the footing. Thank you

  • @mikesbobcatservicesllc-mic6927
    @mikesbobcatservicesllc-mic6927 2 ปีที่แล้ว

    An excavator and a skidster is all you need to do all dirt work Unless it's bigger than a football field.

  • @farmerbob728
    @farmerbob728 2 ปีที่แล้ว

    Great idea about using the transit system that way. So I'm guessing you set the setting at the halfway point..? At the one foot marker and clamp it there.

    • @shamrockdirtwork7945
      @shamrockdirtwork7945  2 ปีที่แล้ว

      That sounds about right. This simple setup has been very helpful when I rough cut pads.

  • @matthewellenbroeable
    @matthewellenbroeable 2 ปีที่แล้ว

    That was fun to watch, but would bulldozer be better suited for this

  • @jedidahmathews2962
    @jedidahmathews2962 2 ปีที่แล้ว

    What’s the normal per hour rate for work like this?

    • @shamrockdirtwork7945
      @shamrockdirtwork7945  2 ปีที่แล้ว

      It can vary. Depends on what I'm doing. My area starts at $125 per hour. I usually bid jobs by the day, but by the hour.

  • @kylendmiller
    @kylendmiller 3 ปีที่แล้ว

    Great video.... thanks for the info. I’m going to rent some equipment to build a pad for my 50’x100’ pole barn. I live in Northern Indiana and I’m working with mostly clay. I already own a skid steer. What I’m guessing I need to is a medium sized dozer? What do you think? The is pretty level but I think I want to build up about 12” so there’s no water in the barn. Would you rent an excavator or a dozer?

    • @shamrockdirtwork7945
      @shamrockdirtwork7945  3 ปีที่แล้ว +1

      Building it up is a good idea with any pad. Sounds like a dozer would be a good option. Can you do all the dirt work with your skidsteer?

    • @kylendmiller
      @kylendmiller 3 ปีที่แล้ว

      @@shamrockdirtwork7945 got ya...
      Yeah I thought it would be too hard to do all the work with a skid steer.... especially because I want to build it up? Or would you try it?

    • @shamrockdirtwork7945
      @shamrockdirtwork7945  3 ปีที่แล้ว +2

      @@kylendmiller the reason I use my excavator to build pads is because It has the dozer blade. Attaching the transit receiver makes the final grading faster. I think getting a small dozer would make it faster and easier.

    • @kylendmiller
      @kylendmiller 3 ปีที่แล้ว

      @@shamrockdirtwork7945 that’s what I was thinking man!! Thanks for the advice!!!

    • @barkleyhughes
      @barkleyhughes 2 ปีที่แล้ว

      @@shamrockdirtwork7945 what make / model transit do you use

  • @drchamp1902
    @drchamp1902 4 ปีที่แล้ว

    Is compacting with a skid steer will get it to 2000psf?

    • @shamrockdirtwork7945
      @shamrockdirtwork7945  4 ปีที่แล้ว +1

      My tire machine does a good job during compaction. On larger pads that require several feet of lift, I use a vibrating compactor.

    • @colekemp9330
      @colekemp9330 3 ปีที่แล้ว +3

      No they won’t achieve the necessary compaction. This is the cheap way to do it

  • @Hatya05
    @Hatya05 4 ปีที่แล้ว +1

    I have to build a pad for a pole barn on a decent slope, about 60’ long with 5’ of pitch. I have a large property i can scrape clay off of to compact, im also wondering if i can bring in sand and compact that in 12” lifts. Either way im going to spend some money making a flat area. Any advice would be appreciated.

    • @shamrockdirtwork7945
      @shamrockdirtwork7945  4 ปีที่แล้ว +1

      I don't recommend using only sand for the foundation pad. Call your local government agency and ask for advice. They should be able to answer some of your questions. There are tons of videos on TH-cam that discuss the different compaction qualities of different soils. Good luck!