"My Solar Panels Don't Work" - Fault Finding a Solar PV System

แชร์
ฝัง
  • เผยแพร่เมื่อ 11 มิ.ย. 2024
  • New build properties can always be a barrel of laughs when it comes to electrics. This particular property has been fitted with a solar panel set up, which has suddenly started tripping the consumer unit whenever the inverter activates. With a flat roof and limited access to investigate this isn't going to be the simplest of fault finds.
    Request a quote from Artisan Electrics here - app.openquote.net/company/art...
    🧰🛠️ Tool Of The Day 👇
    Today’s Video Sponsor: TRADIFY - get 50% off your first three months with TRADIFY using our code "artisan" here: bit.ly/3wDr25V
    🚨Subscribe to our TH-cam Channel for more great electrical content: th-cam.com/users/artisanelectr...
    ➕Get more from Artisan Electrics here!👇
    linktr.ee/artisanelectrics
    💬Artisan Electric Discord - Join our Electrical Community! 👇
    / discord
    🔔 Become a Channel Member To Get Access To Exclusive Perks 👇
    ➤ / @artisanelectrics
    Electricians Business Course
    📩 Sign Up To The Electricians Business Course Here And Get The First 4 Lessons Free 👉 ➤ bit.ly/2Z582zI
    🔔 Subscribe to TOOLS4SPARKS TH-cam Channel 👇
    We Also Have A Dedicated TH-cam Channel About Tools:
    ➤ / tools4sparks
    ⏱️Timestamps
    00:00 Welcome
    03:33 Testing
    07:44 Back In The Cupboard
    10:03 Learnt Something New
    13:48 Conundrum
    15:52 Something Important
    PARTNERS/ARTISAN CODES
    🔦Unilite Work Lights: Get 25% off all Unilite Products using our code "ARTISAN25"
    UK Store - bit.ly/UNILITE
    Europe Store - bit.ly/UNILITE-EU
    USA Store - bit.ly/UNILITE-NA
    Australia Store - bit.ly/UNILITE-AUS
    🕶 SafeStyle Protective Eyewear - bit.ly/3Svl4xG-SafeStyle Use code 'AELECTRICS10' for 10% off
    🥾 Big Boots - Save 5% on our amazing work boots when you use our discount code "ARTISAN" at checkout here bit.ly/BIGBOOTS
    📚 Get 10% off when you use our discount code "Artisan" at checkout Here - bit.ly/3uY94dW-StudyStickers
    🔋 Save 5% on EcoFlow Products using code 'AE5' - dada.link/58lAne
    🎵 Use music the Artisan Way - Sign up to Epicmedic Sound here 👇🏼
    www.epidemicsound.com/referra...
    TRADES INSURANCE DISCOUNT
    🦏 Use Discount Code “ART5” and you get a 5% Extra Discount On Their Already Excellent Prices.
    ➤ www.rhinotradeinsurance.com/quote 📞 or call 01162437904.
    ENERGY PROVIDER
    🐙 Get £50 credit when you switch to Octopus Energy 👇
    ➤ share.octopus.energy/zappy-sh...
    📈Make the most of your TH-cam analytics with TubeBuddy - Sign up here👇
    ➤www.tubebuddy.com/ARTISAN
    AMAZON LINKS
    ✅ Check Out All Our Favourite Tools Here 👇
    ➤ www.amazon.co.uk/shop/artisan...
    🏷️ DISCOUNT BUSINESS SUPPLIES 👇
    ➤ www.amazon.co.uk/tryAB?tag=ar...
    📱 ARTISAN SOCIALS 📱
    💬 Artisan Electrics Discord
    ➤ / discord
    📸 Artisan Electrics Instagram Account 👇
    ➤ / artisanelectrics
    🐦 Artisan Electrics Twitter Account 👇
    ➤ / artelectrics
    📓 Artisan Electrics Facebook Account 👇
    ➤ / artisanelectrics
    ⏰ Artisan Electrics TikTok Account
    ➤ / artisanelectrics
    💼 Artisan Electrics Linkedin
    ➤ / artisan-electrics
    🎥 Get in touch with the Media Team
    ➤media@artisanelectrics.co.uk
    This video is for entertainment purposes only please do not attempt to copy or recreate it. Do so at your own risk.
    #sparkylife #electricianlife #artisanelectrics
  • วิทยาศาสตร์และเทคโนโลยี

ความคิดเห็น • 261

  • @artisanelectrics
    @artisanelectrics  4 หลายเดือนก่อน

    Request a quote from Artisan Electrics here - app.openquote.net/company/artisanelectrics

  • @smithleon
    @smithleon ปีที่แล้ว +67

    as a DIYer and not a pro I find it funny that customers don't clear these areas that surely they know you are going to have to go into; understairs cupboards, airing cupboards etc. Just full of the usual stuff that we all have but you'd think they'd make it a bit easier to access :)

    • @sweetvuvuzela4634
      @sweetvuvuzela4634 ปีที่แล้ว +4

      They expect the tradesman to clear it out on their behalf

    • @Gr33nMamba
      @Gr33nMamba ปีที่แล้ว +12

      We seem to be only our country that is obsessed with putting consumer units in useful storage cupboards or in the middle of access corridors. Europe seems to have the right idea with the recessed cabinets that blend in.

    • @elminster8149
      @elminster8149 ปีที่แล้ว +5

      Yeah, it must be a comparatively new thing, cos when I was growing up, we used to clear the area. It's like clearing stuff away for the decorator and not expecting them to shift everything themselves. Still they'll charge you for the privileged of being lazy.

    • @Mainly_Electrical
      @Mainly_Electrical ปีที่แล้ว

      Leon smith , @mainly electrical,,, , get subscribed to learn the way of the electrical wizards 👍⚡️

    • @Roger.Coleman1949
      @Roger.Coleman1949 ปีที่แล้ว +5

      @@elminster8149 I agree.Also a friend who works for a specialist Solar Panel installation company told me recently that after 2 years of being involved, he and a workmate have ever been offered either tea or coffee by any of the householders despite often being up on the roof in lousy weather .His mate once was so appalled that he asked if there was any chance of a drink ?..The reply was ' Oh , we don't drink tea or coffee here ' !.Tells you something ! .

  • @amenaspecialist
    @amenaspecialist ปีที่แล้ว +10

    Ah avonside aha
    on one of our new build sites they even managed to fit the panels on one plot completely on the wrong side of the roof aha
    Outstanding work

  • @james.8985
    @james.8985 ปีที่แล้ว +1

    [At a job when an RCD or RCBO has tripped, I do the half trip @ 15mA before troubleshooting just to make sure there is no nuisance tripping of that particular RCD/RCBO. I have come across them that trip under 15mA, faulty product. Great video love watching your channel 👍🏼🇦🇺.]

  • @stevelambert6689
    @stevelambert6689 ปีที่แล้ว +13

    I always thought that as part of the CDM Regulations Architect's/ Designer's have a duty to consider safe access to equipment for future maintenance by others. That would include whoever decided on putting the inverters on the roof especially if it has the potential to be a troublesome part.

    • @fullmetalp0tat066
      @fullmetalp0tat066 ปีที่แล้ว +4

      @Nicky L I wouldn't touch a new build with a sh***y stick.

    • @steveurbach3093
      @steveurbach3093 ปีที่แล้ว +1

      And Solar needs routine washing of the panels.

  • @caterthun4853
    @caterthun4853 ปีที่แล้ว +1

    Found one of the best understanding of solar panel wiring. Micro inverters by Gary does solar on TH-cam. Looking at Artisan and Gary has been educational.

  • @dankelley9361
    @dankelley9361 ปีที่แล้ว +19

    Looking forward to the next segment to see how the micro inverters malfunctioned!

    • @henrystevens2258
      @henrystevens2258 9 หลายเดือนก่อน

      The only micro inverters I ever fitted was emphases which never give any problems don't forget all the cable is ac

  • @michaelnicholas9750
    @michaelnicholas9750 ปีที่แล้ว +8

    This is a massive problem I’m finding with new builds using micro inverters which works for shadowing but for maintenance and replacement scaffolding is probably required no future proofing should be a ladder and railing’s secured to the building to clip on to with harness. Personally I think inverter dc/ac isolated should be in a cupboard/garage easy access apart from the PV panels all electronics are in the dry. Guessing you have 3 or two panel systems with in the next 10 years all the micro inverters will need replacing their not cheep. If it is possible to series link all the panels bring one inverter inside or to accessible area for maintenance. No doubt all the properties will have the same issue.

    • @Stugadget
      @Stugadget ปีที่แล้ว +1

      The Enphase, which is the main microinvertet comes with a 25 year warranty. Do you really think they would give them that length of warranty if they are expecting them all to fail in 10 years ?

  • @avidviewer1
    @avidviewer1 ปีที่แล้ว +2

    Absolutely fascinating to my entirely non-electrical mind. Thanks!

  • @routercnc9517
    @routercnc9517 ปีที่แล้ว +2

    We are about to have a solar battery system installed so I appreciate the explanation of the system components so I know what to expect.

  • @marymadigan9707
    @marymadigan9707 ปีที่แล้ว +1

    Omg that board 🙈 loving the videos 😎🇮🇪👏

  • @electrickal1
    @electrickal1 ปีที่แล้ว +5

    A couple of points to mention on a safety front is never leave a live fuse board or any other piece of live equipment open while you walk off and leave it unattended!!
    The other point worth noting is when you straightened the busbar, you failed to check that each MCB was clamping the fingers correctly, that is the single wisest thing you can do on that type of modular board.

  • @jneale7715
    @jneale7715 ปีที่แล้ว +5

    Principal designers should be held to account for not accessing for future maintenance!

  • @johntisbury
    @johntisbury ปีที่แล้ว +8

    Micro investors and optimisers on the back of solar panels which are then fixed to the roof of a house are a potential problem waiting to happen. Upon failure it's an expensive job for the customer as they also have to pay for scaffolding or cherrypicker on top of the repair bill. Even if the system is under warranty there's still the cost of getting access that needs to be met.

    • @GaryDoesSolar
      @GaryDoesSolar ปีที่แล้ว +2

      Hi John, I used to think the same, but see what you think of the video I just released. It's really changed my perception of microinverters completely!

    • @johntisbury
      @johntisbury ปีที่แล้ว

      @@GaryDoesSolar cheers Gary will add to my to watch list!

  • @messageobliquespe100
    @messageobliquespe100 ปีที่แล้ว +1

    What’s the plan then Jordan?
    Any warranty left on the solar panel install / micro inverters?
    Maybe propose a change to String inverters so access/maintenance can be carried out from within? Might be an idea to survey / canvass surrounding buildings that are part of the same development.
    I would’ve thought that there’s probably a general roof maintenance programme for the development - access probably in the build / method statements for cleaning & maintenance.
    Maybe a cherry picker would be safest / easiest option

  • @artisanelectrics
    @artisanelectrics  ปีที่แล้ว +3

    Today’s Video Sponsor: TRADIFY - get 50% off your first three months with TRADIFY using our code "artisan" here: bit.ly/3wDr25V

  • @johnbrookes9830
    @johnbrookes9830 ปีที่แล้ว +1

    As someone who has worked in construction (major infrastructure projects) most of my life I always find it amazing that house builders consistently fail in their duty under CDM. If someone fell of a roof doing this type of maintenance (that could easily be avoided with a simple design change) the Principle Designer should be held accountable. However because its houses I suspect that no one ever would hold them to account.

  • @BrianG61UK
    @BrianG61UK ปีที่แล้ว +17

    The trouble with all the panels in series and a single big inverter is that it just takes one panel to get dirty or be slightly in the shade for some reason and your output plummets. With an individual micro inverter on each panel you don't have that problem.

    • @martyndavies1482
      @martyndavies1482 ปีที่แล้ว +3

      Micro inverters can nearly double the cost of each panel though, and if you aren't shaded by trees or buildings, then its not worth it just for the risk of one panel getting dirty that could be solved by a window washing broom.

    • @johntisbury
      @johntisbury ปีที่แล้ว +6

      This is true. The flip side is whenl one of the inverters/optimiser fails and then you are in a world of pain getting access and getting it replaced. Tell me how I know.

    • @cbcdesign001
      @cbcdesign001 ปีที่แล้ว +6

      Rain largely keeps panels clean and periodic washing if that fails. And micro inverters, just more to go wrong and access to the roof needed when it does. I would much rather have a single inverter thanks.

    • @timoakley277
      @timoakley277 ปีที่แล้ว +2

      True. But it is swings that and roundabouts

    • @Plan3tBob
      @Plan3tBob ปีที่แล้ว

      Does SolarEdge solve some of this problem?

  • @trajo189
    @trajo189 ปีที่แล้ว

    Great content, perfect length.

  • @riaang2002
    @riaang2002 ปีที่แล้ว +2

    Should also check the inverter installation guidelines to see what type of ELU to use on them. Normally for PV inverters they recommend at least 300mA ELUs

  • @jam99
    @jam99 ปีที่แล้ว

    Jordan, you will be seeing more and more panels with lichen on as the years go by in the Cambridge area.

  • @xxxxbigdavexxxx
    @xxxxbigdavexxxx ปีที่แล้ว +1

    08:10 "so they have no wired it up properly'" so would you take the neutrals out of the chop block and fit to point 3 and 4 of the switch or are you leaving it as you found it???

  • @eviain
    @eviain ปีที่แล้ว

    I’d be interested to know what type of micros these are (haveing chosen micros for my own install).
    It’s fair to say that when I had mine fitted they were not the cheep option, and they do have benefits, especially areas where some panel’s may become shaded. They also mean you get stats per pannel and also don’t have to find room for a large inverter. Optimisers may have replaced some of these benefits but that wasn’t an option when I had mine fitted. I’m disappointed that the micro didn’t fail in a way that allows you to locate it via the app, as I thought that was another benefit. Overall I’m reserving judgment as it could still be some other issue!

  • @The009975
    @The009975 ปีที่แล้ว +5

    In the video, when you use terminology like ICR can you write on the video what they mean? Having them pop on the screen for a few seconds would be good!

    • @artisanelectrics
      @artisanelectrics  ปีที่แล้ว

      We'll see what we can do!

    • @caterthun4853
      @caterthun4853 ปีที่แล้ว

      Agree. As panels becomes more common. Down the pub it will not be long before chat is on what make of invert or panels.

  • @TeamFreemans
    @TeamFreemans ปีที่แล้ว

    I did similar troubleshooting like on the video and then asked Artisan how much it would cost for them to check the roof, find the broken panel/inverter, claim warranty and replace.
    It took multiple emails, no straight answer, in the end "oh we need to hire a ladder/scaffolding and we can do all + £160 or so per hour, then again to replace it" I said thanks but no thanks, I'm not a millionaire. Shocking they don't have a tall ladder!

    • @geoffcarlton4047
      @geoffcarlton4047 9 หลายเดือนก่อน

      You saw how he wasted an hour at the start by testing every wire he could find instead of just turning all isolators off and back on one by one until it trips, he even said at the start he had an idea of what it was.

  • @dmarriott9701
    @dmarriott9701 ปีที่แล้ว +2

    With regard to the drinks situation, as a retired plumber I’ve been to one or two jobs where the customer has made tea/coffee whilst discussing the job in question and drunk said refreshments without even giving you the chance to refuse the opportunity of joining them in their enjoyment of a drink.

    • @rscelectrical7091
      @rscelectrical7091 ปีที่แล้ว

      In most places, would you really want to accept a drink ?.

    • @dmarriott9701
      @dmarriott9701 ปีที่แล้ว +1

      @@rscelectrical7091 a lot of places I would but there has been places where you wiped your feet to come out

  • @Swenser
    @Swenser 7 หลายเดือนก่อน

    Add a thermal camera to your tools. Useful for when looking for faulty panels and shorted stuff.

  • @KoRWraith
    @KoRWraith ปีที่แล้ว

    Artisan Electrics do Solar Edge installs which also have 'maintenance-requiring' parts on the roof in the form of optimisers...?

  • @d.b.cooper1
    @d.b.cooper1 4 หลายเดือนก่อน

    Have you ever come across buzzing/humming sounds from the loft once solar has been installed? Seems to occur even when you turn off all the power & more apparent once the sun sets, not the main inverter. Any ideas mate?

  • @Zeldoz
    @Zeldoz ปีที่แล้ว +3

    Surprising you don't carry ladders onboard. Double extended isn't too big and you could've got to the roof on the first visit? Saving the customer a second visit charge?

    • @donnakebabmat5413
      @donnakebabmat5413 3 หลายเดือนก่อน

      There was a ladder on his van.🤣

  • @aovideos3268
    @aovideos3268 ปีที่แล้ว

    Ayyyyy another video!!

  • @persona250
    @persona250 ปีที่แล้ว

    Between neutral and earth a short will show on tncs , tns and tt .

  • @sweetvuvuzela4634
    @sweetvuvuzela4634 ปีที่แล้ว

    🎉🎉🎉another video

  • @adam9041
    @adam9041 ปีที่แล้ว +1

    I absolutely shit myself when the Ring chime went off at the start of the video. Thought someone walked into my house😅😂

    • @artisanelectrics
      @artisanelectrics  ปีที่แล้ว +1

      I paused the video too when watching it 😂

  • @sdgelectronics
    @sdgelectronics ปีที่แล้ว +2

    PME and TN-C-S are not synonymous as you suggest.

    • @deang5622
      @deang5622 ปีที่แล้ว

      They pretty much are.
      In most cases a TN-C-S installation will make use of a PME strategy.

  • @jkgiygigoiuholjojouihgiygf1952
    @jkgiygigoiuholjojouihgiygf1952 ปีที่แล้ว +2

    If it's a new build shouldn't everything be in warranty still?

  • @lehoff
    @lehoff ปีที่แล้ว +2

    This is why refused to have micro inverters for my panels.

  • @memecoinmafia2732
    @memecoinmafia2732 8 หลายเดือนก่อน

    what's the reason for the meter on the solar ?

  • @carlhussain5170
    @carlhussain5170 8 หลายเดือนก่อน

    do you give a discount for filming in their home? is it alot?

  • @tonywebb9909
    @tonywebb9909 หลายเดือนก่อน

    This i why i don't like micro inverters, until they can make better access to them I prefer to keep the roof installation very simple. I was thinking that if the micro inverters could slide down on a mechanism from the bottom rail so that you can do maintenance from a ladder below. It would need to be able to feed two PV panels above it vertically.

  • @allan4787
    @allan4787 ปีที่แล้ว

    Do you have a video where you install Microinverters? TH-cam search didn't find one.
    Can they be installed so they sit in a dry accessible room or loft?
    How are they connected to the house mains? I know that there is a loss if they are to be used for battery storage. Or is there a way of avoiding this loss?
    I've seen in other TH-cam videos that Microinverters , if properly installed, the failure of a μinverter should not see the failure of all panels and total loss of power from the panels. Also the failure rates of μinverters is very very low. And guarantees are 30 years.
    Great videos BTW

    • @shropshireladoutdoors743
      @shropshireladoutdoors743 ปีที่แล้ว +1

      Micro inverters are normally installed on the back of the rails that hold the pannels and pannels connect into them then the micro inverters are plugged into a single cable back into the property all plugs and micro inverters are or should be water proof and when installed each pannel and inverter are logged by position so you can find out which one isn't working and ware it is. access after installation is always going to be expensive on a pitched roof as you will need scaffold message me if you been clarification

  • @henrikprebennielsen4612
    @henrikprebennielsen4612 ปีที่แล้ว

    Hej tak for din gode video, det lang bedre med inverter og mere service venligt , der er ikke den store forskel på mikro inverter produktions tal. som en elektriker siger, dem samme mand udbedre fejlene, det er den billiste måde for vores kunder

  • @Marri-Tech
    @Marri-Tech ปีที่แล้ว

    Access equipment is a stretch, flat roof so only really need a ladder that reaches safely

  • @messageobliquespe100
    @messageobliquespe100 ปีที่แล้ว +3

    No access from inside to get onto the roof 🤔seems very odd. Why not plan to move the inverter internally to save any future probs While ya sorting 🤔
    Might be an idea to see if they’re any plans / dwgs around - if not then offer to provide survey for any future contractors coming in 👍

    • @chriscowap3159
      @chriscowap3159 ปีที่แล้ว +1

      They are microinverters - One per panel, close coupled at the panels

    • @messageobliquespe100
      @messageobliquespe100 ปีที่แล้ว

      ahhh thx. I had to look em up. Pros n cons to either string or micro inverters. For this particular project / where there ‘appears’ no easy access - string inverter sounds like a better plan

  • @KiwiCatherineJemma
    @KiwiCatherineJemma ปีที่แล้ว

    Flat roofs, in new build houses in Britain. I'm glad that those houses are in a near-desert part of the British Isles where rainfall is especially low... ap-parently. That's a great idea (not !).

  • @sang3Eta
    @sang3Eta ปีที่แล้ว

    Just use a Solis string inverter next to your consuner unit so much simpler and easier. The new ones even have a built in DC isolator.

  • @tutnallman
    @tutnallman ปีที่แล้ว

    Survey the roof and photograph it in detail. also photo the areas under the flat roof before any access is made.

  • @swedishchefdave49
    @swedishchefdave49 ปีที่แล้ว +2

    Micro inverters need to be smart and be able to communicate with a base unit, otherwise any single fault will mean having to investigate all of them to find the faulty unit and in a big set of panels may even mean pulling many panels off the roof, having a string inverter indoors mean easy access and fault finding and reprogramming at any time

  • @230879Darren
    @230879Darren ปีที่แล้ว

    16:07 Smooth like butter 😂

  • @MacdonaldEdinburghElectrical
    @MacdonaldEdinburghElectrical ปีที่แล้ว +5

    Just a thought… when I’m installing micro inverters maybe it would be a good idea to install them in the Attic in case they go faulty, what do you think ?

    • @kittsdiy
      @kittsdiy ปีที่แล้ว +2

      nope to many holes in the roof ;. same for optimzers .. alle work fine .. until one breaks ... you need to go on the roof ;.

    • @MacdonaldEdinburghElectrical
      @MacdonaldEdinburghElectrical ปีที่แล้ว

      @@kittsdiy I did think about that but would that not be better than needing to rehire a scaffolding. 25years Warranty, would customer not expect me to pay for scaffolding?

    • @kittsdiy
      @kittsdiy ปีที่แล้ว +1

      @@MacdonaldEdinburghElectrical good question .. i think in a lot of agreements .. the warranty is on the parts only by the manufacture .. not on the labour etc /demounting the panels .
      Otherwise yes could make it expensive for the installer :-)

    • @newlinerealboi3434
      @newlinerealboi3434 ปีที่แล้ว +3

      In loft is the best way. So long as the correct flashings are used it’s fine regarding holes. You would generally replace a tile with a special plastic tile with moulded entry points.
      Much better going up a loft ladder to fix rather than getting scaffolders and lifting panels off. Especially if it’s a unit in the middle of a row, where all the panels need to come off from the end of the run.

    • @Stugadget
      @Stugadget ปีที่แล้ว +1

      @@newlinerealboi3434 and how do you waterproof the membrane?

  • @totty100
    @totty100 ปีที่แล้ว +1

    Great videos.
    Why oh why, do customers not clear their crap out of cupoboards if they know you're coming?
    Nearly all your videos show house junk blocking your access to the CUs

    • @jam99
      @jam99 ปีที่แล้ว +2

      Mostly because half of them have not the slightest clue about where an electrician might need to access. Lack of education, lack of thought, lack of anticipation.

  • @mondotv4216
    @mondotv4216 ปีที่แล้ว +1

    There's been quite a few studies now that show micro inverters and optimisers offer little advantage over central inverters even in shaded situations. And on a new build I think we can be pretty confident they didn't go with a premium brand.

    • @IanMcc1000
      @IanMcc1000 ปีที่แล้ว

      I think installers quite like them because it makes it easier to find faults on large strings

    • @Stuart_Johnson_Solutions
      @Stuart_Johnson_Solutions ปีที่แล้ว

      I agrée. MIs are much more hassle than they gain in most circumstances. The only time I would fit is where the roof space isn't big enough to get all panels able to be in sunshine at once.

  • @josephkondia3155
    @josephkondia3155 11 หลายเดือนก่อน

    COOL

  • @kemots455
    @kemots455 ปีที่แล้ว

    Last solar system on microinverters which I have found that was faulty produced dc current between neutral and earth coming from roof microinverters but that should be ac , be careful

  • @michaeldavidsohn2805
    @michaeldavidsohn2805 ปีที่แล้ว

    Inverters can interfere with Ham Radio signals, especially when they comply to the old CE standard or badly fitted.
    Ofcom are on the case.

  • @BrianWrenn
    @BrianWrenn ปีที่แล้ว

    When the RCD tripped, why did the strip plug behind you stay on???

    • @deang5622
      @deang5622 ปีที่แล้ว

      Without watching the video, I can tell you that the strip is not connected to the output side of the RCD.

  • @delspark
    @delspark ปีที่แล้ว

    It does make me nervous 😬 when your chatting away and sticking your hand in the consumer unit 💀

  • @highpath4776
    @highpath4776 ปีที่แล้ว

    NICEIC/ NHBC warrenty claim for work like that ?

  • @mike-ology22
    @mike-ology22 ปีที่แล้ว

    I've worked on sites in Cambridge. Long road, Glebe Farm and Clay farm next to Addenbrookes. You get paid a price per item, the quicker you install the item the more money you get paid.
    You get paid more than a site worker does. Site workers have less responsibilities and there are no building regulations when the corporations like countryside regulate themselves based on a snagging list. If the customer doesn't spot it, it's fine...
    I still do a good near job on site work but that got me fixing everyone else's mess on a day rate, because I was good with customers. Rather than giving me the first or second fix to do.
    What these bodgers don't realise is, if you starts as a bodger, you become a quick bodger. If you start slowly and do things neatly and correctly then you get quicker being an artist in your trade.

    • @deang5622
      @deang5622 ปีที่แล้ว

      The quicker you install an item the more you get paid? That's a novel concept. Can you install the items in zero time? Do you become a millionaire in that situation?

    • @mike-ology22
      @mike-ology22 ปีที่แล้ว

      @@deang5622 What kind of a question is that? What answer are you expecting here mate?

    • @mike-ology22
      @mike-ology22 ปีที่แล้ว

      @@deang5622 What happens on building sites is this. Companies take on self-employed labourers to install the plumbing and heating. Due to site work being competition driven, no one shares their methods or the right way of doing things, I did, but others? So they bodge the second fix, charge for it, and I had to go back and fix all of their work on a day rate, taking me off the better-earning jobs.
      They would smash out one first fix a day. Split between two people would be £600 per day, or, you could do a small 2 bed for £500 on your own. First fixes must be smashed out within a certain timeframe to keep the flow of properties moving. I think within 1 year they had built 110 properties.
      The quota was from October to October, and we worked from 7am until 10pm trying to get all the properties installed and ready to be handed over every single year. I complained that they should take me off day-rate and do the installs myself. Do the whole property yourself, then only you are accountable.
      There was one idiot I spent a day of my own time teaching him the best way to second fix with the floor tiles being on the walls and a lot tougher to get through. He then went around and did all the fill-ups allocated to me, the easy work, and left all the hard bits for me to do. He did it on another property but forgot to tighten up the expansion vessel for the cylinder. IT blew off and flooded the property. Karma has its own way of dealing with people like that.
      Site workers trample on each other and sabotage opportunities for others. I made £900 in one day doing 6 floors of underfloor heating split between 2 people. £300 per floor with multiple zones. The others were jealous and the foreman kept sending me to flats that weren't ready.
      Sire agents sending out labourers to do the snagging, and snagging is a joke. They have labourers going around and filling all the holes, and patching other bits, getting bath repair men in to repolish the bath or fix chips in them. They only repair what the customer points out, and half the customers have no clue about the building which is why they buy a new build.
      No oversight at all, Shocking! (He says with a Welsh accent)
      We had 4 sparks working alongside us and only one of them knew how to second fix all of the main wiring units, rather than splitting it up per property and signing it off in their name. If they did, Artisan could call them up and hold them accountable. That would change things a lot.
      But, it is all about money, or currency should I say. Money is a gold and silver coin and currency a worthless banknote, a promise to pay, read your bank note. I digress.
      £500 per property doing hot, cold, and heating, without the soil stack, without the cylinder. Just pure pipework. 1 per day equals £2500 per week, times 48 weeks is £110,000 per year. Without including working on a Saturday. In 15 years you would have earned over £1,000,000. So you were saying, kind Sir?
      Did you know that a house in the 70's cost £4460 and now costs £300,000. That is 75 times more. Did you know that our wages back then were £1049 and if you use the same calculation our wages would be an average of £80,000.
      We have figured this whole system out mate, uncovering it bit by bit. Join the revolution if you want life to go back to normal and be wealthy and able to own your own land for free, just by making a claim. This is however only possible if you are a natural-born English man or woman. If you have no claim in England then you must return home to your native country to make a claim there on your birthright.
      Non-natives won't have to leave, however, they would have to pay taxes because they are trespassers on the land. Plenty more to talk about these coming months, hopefully, see you there

    • @deang5622
      @deang5622 ปีที่แล้ว +1

      @@mike-ology22 I don't care what happens on building sites.
      I am highlighting a factual inaccuracy you said, I am hinting at it but you don't even seems to be aware of you made it.
      Let me spell it out.
      "The quicker you install an item the more you get paid".
      You *DON'T* get paid on how little time it takes you to install an item. You don't. You really don't.
      You get paid according to how many items you install.
      Now do you get it?
      If you can reduce the time it takes to install each item then you can install more items in the same time, an 8 hour day and as a consequence you are paid more.
      OR, you get paid by the job and you are able to complete the job in less time enabling you to do more jobs in the same time.
      So what you said was factually incorrect and that is what I was picking up on.

    • @mike-ology22
      @mike-ology22 ปีที่แล้ว

      @@deang5622 fair play. I guess my being Half-Dutch and half-English fluent in both, living there for 19 years, and here 20 years.
      I'll watch my wording a bit better next time hahaha

  • @colingreer853
    @colingreer853 ปีที่แล้ว +1

    It makes you wonder if these solar energy systems ever make you much savings following the initial install cost and future maintenance, fault costs such as this.

    • @mbak7801
      @mbak7801 ปีที่แล้ว +1

      Oh yes they do on steroids and a cherry on top. Huge savings.

    • @dank9561
      @dank9561 ปีที่แล้ว +3

      A properly designed system using reputable parts that wasn't bodged together by the cheapest bidder will.

    • @atkt62
      @atkt62 ปีที่แล้ว

      If you don't go for bargain basement price, do your research into reputable companies who will also offer after sales support, and explore design options you should get 25+years from panels, 12+ years from inverter and 10 years from batteries with warranty backed by mcs and supplers. We are a year into our solar pv, so far all good

  • @algreene9965
    @algreene9965 ปีที่แล้ว +1

    If allowed a drone would be a good use to see on top.

  • @NowWeComeAlive
    @NowWeComeAlive ปีที่แล้ว +1

    How come you do all these solar videos but aren’t on the MCS register?

    • @Random-name393
      @Random-name393 ปีที่แล้ว +3

      You don’t need to be MCS to instal solar

    • @blower1
      @blower1 ปีที่แล้ว +3

      You need an MCS certificate for the SEG tariff (Smart Export Guarantee). Not all energy providers require it for an export tariff but the tariff's that are SEG do require it. AFAIK Octopus require it for their export tariff's and tariff's like Intelligent Octopus - if you want to get paid for any export.
      It is not a legal requirement to be MCS registered and hence provide the customer with an MCS certificate - however the customer is at a disadvantage without one, as it limits their options to get paid for export and even though that is not much per unit at present - it could become more of a problem in the future with new gov schemes or better export tariff rates.
      If i were having a company install solar - i would want an MCS registered one so i get a certificate. It can also be required by buyers if you are selling your house with solar and could reduce value or put off buyers if you don't have certificates.

    • @deang5622
      @deang5622 ปีที่แล้ว

      Apparantly they have said they are in the process of applying for MCS registration, and that it takes time.
      I don't know how long it takes but as of today 21st May 2023 they still aren't registered.

  • @zjzozn
    @zjzozn ปีที่แล้ว

    ⚠️thought you could login to the micro inverters to see health & performance. But if tripping RCD…. They really are like integrated LED’s. Great idea, but previous was better for maintenance

    • @lua-nya
      @lua-nya ปีที่แล้ว

      Well microinverters tend to communicate via powerline or some obscure wireless to a control unit... it's usually not an option to do this when the breakers are tripping.

  • @jamesdaly4040
    @jamesdaly4040 5 หลายเดือนก่อน

    Why do you try to disconnect each panel individually. Narrow down and leave others connected

  • @thebincleaner
    @thebincleaner ปีที่แล้ว

    Terminology....I don't understand 95% of it mate but I still find it fascinating 🤣

  • @balensydney
    @balensydney ปีที่แล้ว

    Is it a legal a requirement to use a 2 pole isolator….in the UK
    Thanks

    • @shropshireladoutdoors743
      @shropshireladoutdoors743 ปีที่แล้ว

      Normaly standard installation so dc can be isolated

    • @petermichaelgreen
      @petermichaelgreen ปีที่แล้ว

      Main switches of single phase domestic installations are required to be double pole, but other than that BS7671 allows single pole isolation on TN supplies in most cases.
      I'm not sure if there are any special requirements for isolators used on solar installations.

  • @GeorgeFryd
    @GeorgeFryd ปีที่แล้ว +1

    no demarcation on the diagram for the Type B RCD ? ; doesn't look beefy enough; system might not need one ? most inverters tend to require one, its international standard; surely its tripping due to the different sine; not familiar with micro inverters

    • @deang5622
      @deang5622 ปีที่แล้ว

      No it is not an international standard.
      Each country has its own standards for electrical apparatus.

  • @peterf7248
    @peterf7248 ปีที่แล้ว

    To speed up the note taking can you use the voice function on the apple keyboard to dictate the notes on Tradify, ?

  • @mrmidland_traveller936
    @mrmidland_traveller936 ปีที่แล้ว +1

    Hello Jason, another fascinating video. I have a question. Why isn't possible to link PV solar panels directly to a car battery. Both use DC. It seems inefficient to convert the PV to AC using an inverter then put the AC into the car which then converts it back again to DC to charge the battery. My PV is a 7kW array. When the battery is fully charged, the solar panel reduce their output to the 3.68kW of the inverter. Why can't I use that spare capacity of the panels to charge the car directly using the DC? Thanks

    • @deang5622
      @deang5622 ปีที่แล้ว

      Because firstly the voltages of the panels and car battery are different.
      Secondly you need a constant voltage for many types of car battery. So you really want a charger suitable for the battery chemistry to be present.

    • @mrmidland_traveller936
      @mrmidland_traveller936 ปีที่แล้ว

      @@deang5622 Thanks Dean 👍🏻

  • @deang5622
    @deang5622 ปีที่แล้ว

    "My solar panels don't work", "Did you forget to turn the sun on?"

  • @swscoots14
    @swscoots14 ปีที่แล้ว

    Not the issue here but one thing to look at is what type of rcd is used for solar you need to use an a type rcd not an ac type as the dc current can leak back onto the ac circuit saturating the coils and will eventually stop the rcd working

    • @deang5622
      @deang5622 ปีที่แล้ว

      Technically you are not saturating the coils, you are saturating the ferromagnetic ring with too much magnetic field.
      Saturation is a well understood phenomena of transformers.

  • @geoffsayers8736
    @geoffsayers8736 ปีที่แล้ว

    can you do a electrical disasters,where subscribers send in pictures of electrics they find at a job and you guys react

  • @4FunnyMonkey
    @4FunnyMonkey ปีที่แล้ว

    What’s the difference between twin and earth and 3 core flex?

    • @blower1
      @blower1 ปีที่แล้ว +1

      Twin and Earth (T&E) is just the nickname given to the flat, usually grey, cable used for internal house wiring here in the UK.
      6242Y Flat PVC cable is the full proper name for such cable.
      T&E has solid conductors, with the earth cable being uninsulated internally.
      3 core flex has stranded conductors, all of which have secondary (their own) insulation.

    • @deang5622
      @deang5622 ปีที่แล้ว

      Twin and earth is not flexible😅
      The conductors are solid.

  • @ehsnils
    @ehsnils ปีที่แล้ว +1

    1:30 - the bus bars are also on the underside, which in my experience is a bad idea. If you can have them on top it's better. The reason is that if there's for some reason a mouse able to enter the panel and it dies then the liquids will drip down into the bus bar causing some less than appealing results with a potential fire hazard since the bus bar is effectively a tray. With the bar on top then the tray is upside down and then the risk for liquids collecting somewhere is lower. Just my take on the matter, the code for your area might say otherwise. This experience was with a 3-phase bus bar.

    • @meuk6929
      @meuk6929 ปีที่แล้ว +1

      In UK installations its uncommon to come across a top busbar system the only brand I can think of is D-line. The consumer unit installed is a Hager dual RCD and I'd suspect looking at the enclosure its circa 2010 ish. I'd also guess that they are both type ac rcds not type A which handles dc leakage far better.

    • @colingreer853
      @colingreer853 ปีที่แล้ว

      I have a great photo which I took of a mouse that stepped on the terminals at the back of my oven.
      A perfect skeleton with some scuzzy stuff in between which I assume was its fur!

    • @meuk6929
      @meuk6929 ปีที่แล้ว +2

      @@colingreer853 before I replaced my 15th edition cu I pulled off the cover and there was a perfect skeleton of a mouse too which had got in and and goodnight sweetheart! 😂😂

  • @Daminous_Games
    @Daminous_Games ปีที่แล้ว

    Looking at the state of that consumer box alone, I'm not shocked, as more so with new builds, it appears that everything is a botch job, and also if you have someone coming, people should make the areas clutter free.,

  • @neo_265
    @neo_265 ปีที่แล้ว +1

    Another reason not to have micro inverters/optimisers. They marginally work to improve some instances of diffused shading but all modern solar modules are designed to deal with most other shading out of the box.

    • @colingreenwood987
      @colingreenwood987 ปีที่แล้ว +1

      One huge advantage of micro inverters is being able to slowly add more panels over time as you can afford to.

  • @jonnynoneck2838
    @jonnynoneck2838 ปีที่แล้ว +1

    The person who done that fuseboard needs a slap a big one

    • @kirkhamandy
      @kirkhamandy ปีที่แล้ว

      New builds are thrown together in the shortest time. Those giving the lowest quotes figured out that to get their quote that low they don't have the time to do it properly.

  • @zorot3876
    @zorot3876 ปีที่แล้ว

    What is the difference between an isolator and a switch?

    • @jam99
      @jam99 ปีที่แล้ว +2

      Same things really except an isolator of the type required for solar installs will normally be sold to have a certain (better) isolation and safety reg spec. They are usually beefier, with more insulation, and more expensive. Better materials, different switching mechanics. The actual switching mechanism usually puts more distance (isolation) between conductors when off, for example, so they might be less likely to arc or fuse shut in a fault situation. Also, an isolator is more likely (but not necessarily) to cut both conductors (live and neutral) unless some monkey bypasses it as would appear to be the case with the neutral in this video.

    • @zorot3876
      @zorot3876 ปีที่แล้ว +1

      @@jam99 Thanks for that information 👍

    • @petermichaelgreen
      @petermichaelgreen ปีที่แล้ว +1

      As I understand it.
      An isolator is a device that performs isolation, that is disconnecting parts of the installation in a way that makes them safe to work on. In particular an isolator is designed to ensure a sufficient contact gap is maintained for safety and to give a positive indication of the position of the contacts.
      A switch is a device used to turn stuff on and off, in particular a switch is designed to safely perform connection and disconnection under load.
      In practice though many devices are designed to perform both functions, Indeed my understanding is that isolators that are not suitable for switching duty are only allowed in situations where the installation is under the supervision of a competent person.
      Whether these devices are referred to as "isolators" or "switches" seems fairly arbitrary. The rotary style always seem to get referred to as "isolators" while the din rail mount ones used in consumer units get referred to as switches. Despite both performing the same functions.

    • @deang5622
      @deang5622 ปีที่แล้ว

      ​@@jam99Isolation of DC is harder to perform than isolation of AC so a different type of isolator that is DC rated is required.

    • @jam99
      @jam99 ปีที่แล้ว

      @@deang5622 Good point. My understanding is that it is not really the isolation when off/on that is more difficult in steady state, it is more the (transition of on to off) dc arcing under load when switching off so current and voltage ratings of an isolator are normally not the same for ac and dc. Hence, the dc rating of an isolator must be observed in a dc application (and, typically, the dc rating will be 'weaker' than ac rating). But I am not sure this is relevant to what is a 'switch' and what is an 'isolator'.

  • @blower1
    @blower1 ปีที่แล้ว +5

    Never liked microinverters - too much to go wrong in a really hard to access (expensive) place. Optimisers seem to have a better lifespan and lower real world MTBF.

  • @JNET_Reloaded
    @JNET_Reloaded ปีที่แล้ว +1

    you should collab with Thomas Nagy (london) hes got what you need and your both yters! it makes sense if you not done it already!

    • @patpending8134
      @patpending8134 ปีที่แล้ว +1

      Does anyone know what's happened to Nagy? He's completely dropped out of TH-cam.

    • @nickbea3443
      @nickbea3443 ปีที่แล้ว

      @@patpending8134 he's locked in betty crockers basement... think he did a podcast in december was the last I heard of him

    • @TheXsheeple
      @TheXsheeple ปีที่แล้ว

      @@patpending8134 Most likely over leveraged his business.

    • @zjzozn
      @zjzozn ปีที่แล้ว

      He just changes street light bulbs, singing and whistling all day. 🤡…. His weekly Fix Radio slot is great, available as a Podcast

    • @warrmr
      @warrmr ปีที่แล้ว

      I didn't think Nagy likes Artisan or Bundy for some none existence YT drama reasons.

  • @torsson2
    @torsson2 11 หลายเดือนก่อน

    on rooF

  • @TheOfficialBatteryMan
    @TheOfficialBatteryMan ปีที่แล้ว

    Personally if I was charging a minimum 1.5 hours I would be at the job for that time. Find myself something to do for the customer. Things to check so on

  • @mbak7801
    @mbak7801 ปีที่แล้ว

    Lots of potentially smelly trainers by the consumer unit. A big thumbs for an evil sense of humour. Ah a better one. Job to fit garden lights and cable to work office/shed. Get three toms of pig manure delivered, not in the way but upwind of the work area. It would make for a brilliant vid.

  • @wajopek2679
    @wajopek2679 ปีที่แล้ว

    Flooded flat roof? Water ingress into a connector? Same issue would happen to an optimizer. A string might have caused a fire. Let's see the next episode.

  • @colinrawlins3286
    @colinrawlins3286 ปีที่แล้ว

    I'm not an electrician but would the rats nest of a consumer unit has something to do with it?

    • @vivhenderson8628
      @vivhenderson8628 ปีที่แล้ว +1

      No

    • @deang5622
      @deang5622 ปีที่แล้ว

      It can be a rats nest and still function properly. Just so long as the pesky electrons decide not to jump from cable to cable without permission.

  • @Brmbaz1
    @Brmbaz1 ปีที่แล้ว

    Don’t run Enphase micro inverters down they have a 25 year guarantee.I put all my micros inside the loft by extending the solar panal dc cables to them.have had no broblems with them for the last 6 years.

    • @deang5622
      @deang5622 ปีที่แล้ว

      A long guarantee is evidence that the manufacturer trusts the quality of the product they are selling.
      If it was prone to failure, the quality was low, then the manufacturer is going to incur great cost issuing replacements throughout the life time of the warranty.
      So generally, a manufacturer, if they know what they are doing, won't issue long warranties unless they are absolutely sure their product is of excellent quality.

  • @TriforceOfCourage97
    @TriforceOfCourage97 ปีที่แล้ว

    you should be always carrying an extension ladder.

  • @henrystevens2258
    @henrystevens2258 9 หลายเดือนก่อน

    And inverter per panel is not a cheap option

  • @andrewstafford-jones4291
    @andrewstafford-jones4291 ปีที่แล้ว +1

    Micro Inverters are not the "Cheapest option" as you stated.
    They are a simply a better way of addressing shading issues to maximise output of the array.
    Unfortunately they are also well known for failing.

  • @jamieblatantsparky
    @jamieblatantsparky ปีที่แล้ว +2

    you should knoq ita a bad job its got a NICEIC logo on it

  • @user-kh2zu4dj5h
    @user-kh2zu4dj5h ปีที่แล้ว

    На заставке видео я уж подумал вы нецензурное слово на русском написали , присмотрелся что нет 😂

  • @routercnc9517
    @routercnc9517 ปีที่แล้ว

    Hang on . . . thumbnail was a pitched roof and property was a flat roof. Enjoyed it all the same!

    • @artisanelectrics
      @artisanelectrics  ปีที่แล้ว

      Couldn't get on the roof to take a photo! 😂

  • @keithg1xfl
    @keithg1xfl ปีที่แล้ว +1

    Surely the Isolator should be BEFORE any Circuit

    • @deang5622
      @deang5622 ปีที่แล้ว

      No. It doesn't actually matter.
      Any physical break in the circuit will stop the current flowing.
      However, if the isolator is interrupting dangerous voltages of 50 volts or more AC or 120 volts DC then the risk of placing the isolator anywhere in the circuit is that someone might perform work on the circuit before the isolator which is still live and receive a fatal shock.
      So generally it is good practise to place the isolator at the origin of the circuit.

  • @stephenmatura1086
    @stephenmatura1086 ปีที่แล้ว

    If at all possible, do not site inverters in a loft. In high summer, the inverter(s) are working flat out and in the process also generate a lot of heat. Additionally, the loft itself gets incredibly hot unless adequately ventilated. All this heat damages the delicate electronics of the inverter leading to failure.

  • @louisfindlay4401
    @louisfindlay4401 ปีที่แล้ว

    If anyone watching does not understand the terminology RCD or TNS please a different video

  • @samfish6938
    @samfish6938 20 วันที่ผ่านมา

    you need to carry a ladder

  • @williammartinculleton5875
    @williammartinculleton5875 ปีที่แล้ว +2

    Good presentation, I find it all too easy to criticise another’s work, remember the sparks doing the new build work wound be getting paid £90+ an hour, they will be on a price, so they have to hurry in order to make a living .

    • @artisanelectrics
      @artisanelectrics  ปีที่แล้ว

      It's like anything if no one speaks up about work conditions or not having enough time nothing will change. It's just making the trade worse.

    • @williammartinculleton5875
      @williammartinculleton5875 ปีที่แล้ว

      @@artisanelectrics Really ?

    • @shropshireladoutdoors743
      @shropshireladoutdoors743 ปีที่แล้ว

      My boss would have kicked my ars if the board looked like that no pride in the job now just get in and out get paid

    • @deang5622
      @deang5622 ปีที่แล้ว

      If you are talking about hurrying then you are in the wrong profession.
      Hurrying leads to poor quality work and mistakes which can cost lives.
      You estimate the job as to how long it will take and you do it properly. Then you charge appropriately.

  • @shropshireladoutdoors743
    @shropshireladoutdoors743 ปีที่แล้ว +1

    Do you actually know anything about solar installation because if the pannels don't show they are working the problem is on the roof normaly that's the first place to look and test this should be an easy job if its on a flat roof

  • @Chris_In_Texas
    @Chris_In_Texas ปีที่แล้ว

    11:00 Jordan, armchair Safety Sally here, I hate to call you out here, but figure its my job as safety officer here. Is your arm calibrated to the correct torque value? I just saw a regular screwdriver tightening those breaker screws, and not a torque screwdriver! 🤷‍♂👍 I am guessing that a remediation training course for the boss is in order! 😂

  • @seymourpro6097
    @seymourpro6097 ปีที่แล้ว +1

    After watching some USA and Australian solar panel channels I wonder why Brits bother!
    There's a solar array in Aus that has the house and mancave garage fully satisfied by 11am then charges two Teslas! There's a solar off grid home+ that runs a plasma cutter CNC and a whole house. Here in the UK we usually manage to send 1 or 2 KWh back to the supplier when they don't need it.