in cab view hoisting crane parts into wind turbine with liebherr LTM 1450 8.1

แชร์
ฝัง
  • เผยแพร่เมื่อ 3 ต.ค. 2024
  • this lift was completed at a wind farm in Ontario by a liebherr LTM 1450 8.1 with 85 meters of main boom and 28 meters of jib on a 100 meter wind turbine. this was installing Liftwerx up tower equipment.

ความคิดเห็น • 1