G+4 COMMERCIAL BUILDING POST PROCESSING TECHNIQUES IN ETABS (LIVE PROJECT)
ฝัง
- เผยแพร่เมื่อ 24 ก.ค. 2024
- SFD, BMD DIAGRAMS, MODAL ANALYSIS, TORSION AND ACCEDINTIAL TORSION, BUILDING DEFLECTION, PERMISSIBLE DEFLECTION ETC.
THE FEAST FROM ECONSTRUCT TO ALL CIVIL ENGINEERS IN THIS PERIOD OF COVID-19 LOCKDOWN.
For registering kindly click the link given below:
zfrmz.com/UFBOYw6nOC0X2Apco78F
Whatsapp on +91-9036744017 FOR MORE DETAILS
I am modeling a G+5 story building on ETABS, but I am getting reinforcement on upper column higher than lower column.what I did wrong?
Thanks a lot sir for taking your precious time for teaching the student community through the online session and helping us grow in all aspects during the quarantine period ..
👍🏻👍🏻
Thank soo much for porvide this etab lecture #econstruction
Please make an analysis video on cantilever projection of slab and beam (Which is tapered at the end) in the building.
Thank you very much
Please sir, upload more videos in continue.
Also design and analysis of foundation.
Thank you
Very nice.thanks.
Sir, I am very thankful to you.
Lot of doubts I got cleared.
Sir, I have solved this live project.
But I am not able to join discussion board, although I have registered this mock live interview.
very nice sir
Sir please show the demo on SAFE
Sir I fill the form but I not get any response
Plz response
hello sir, can i get the sources like cad file for this building? thanks